1. Opportunities
  2. Department of Defense
  3. Department of the Air Force
  4. FA8137-26-R-0040

Construction and repair contract, Tinker AFB, OK

You would compete for a multiple award IDIQ contract for general construction at Tinker AFB, Oklahoma: sustainment, repair, alteration, renovation, and minor construction across many trades.

Official title: Tinker AFB 2026 Multiple Award Construction Contract (MACC)

Deadline
Dec 3, 1:00 PM CT
8 days left
Who can bid
Small businesses, in part
Part of the work is set aside. Size standard for NAICS 236210: $45 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Tinker AFB, OK
Buyer: FA8137 AFSC Pzioc

What they're buying

It runs five years plus one five-year option under a $950 million ceiling, with only a $500 minimum guaranteed.

Top catches

Deadline moved to 3 December
“Extending the proposal due date to 03 December 2026 at 1PM” Notice text

The due date moved from 16 Nov to 30 Nov 2026, and then to 3 Dec 2026 at 1:00 PM. Use only the latest date. The notice also says DoD SAFE files must be picked up within 7 days, so post your files early.

Unacknowledged amendments disqualify
“Any unacknowledged amendments in the Offeror’s proposal will render the proposal ineligible for award.” Attachment 2 Section L Instructions to Offerors_10 Nov 26.pdf, page 26

Amendments 0001 through 0008 are part of this solicitation. Acknowledge each one in your proposal. A proposal with any unacknowledged amendment is ineligible for award.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 35 of 67 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Sustainment, maintenance, repair, alteration and renovation, and minor construction on Tinker AFB real property, across multiple trades.
  • Each task order sets one method: design-build (you design to 100%), construction with limited design, or construction only.
  • Furnish all materials, labor, plant, tools, transportation, equipment, testing, quality control, and incidentals for a complete end product.
  • Pavement and site work listed in the SOW, such as asphalt and concrete paving, pavement markings, chain link fences, and seeding.
  • Utility work listed in the SOW, such as storm drainage, sanitary sewer force main, and underground electrical distribution.
  • Change orders: the notice says about 120 days are needed to definitize equitable adjustments, so plan your cash flow for that delay.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Deadline moved to 3 December. The due date moved from 16 Nov to 30 Nov 2026, and then to 3 Dec 2026 at 1:00 PM. Use only the latest date. The notice also says DoD SAFE files must be picked up within 7 days, so post your files early.
  • Unacknowledged amendments disqualify. Amendments 0001 through 0008 are part of this solicitation. Acknowledge each one in your proposal. A proposal with any unacknowledged amendment is ineligible for award.
  • Two pools need two proposals. A small business can bid both the small business pool and the full and open pool. Each pool needs its own complete proposal. Plan the extra work before you decide to bid both.“must provide a complete proposal for each pool.” Attachment 2 Section L Instructions to Offerors_10 Nov 26.pdf, page 2
  • Self-scores can be cut to zero. The government checks your self-scores against your proof. Unsupported or inflated claims can be lowered, possibly to zero points. Score only what your work samples and records prove.“the Government would unilaterally downward adjust the Offeror’s score, potentially down to zero (0) points.” Attachment 3 Section M Evaluation Criteria_10 Nov 26.pdf, page 2
  • SAM.gov name must match SF 1442. Your legal name and address in SF 1442 block 14 must match your SAM.gov record. Check your SAM.gov record now, since a mismatch can make you ineligible.“the Offeror’s legal name and address in Block 14 on the SF 1442 must match the information for the Offeror in SAM.gov.” Attachment 2 Section L Instructions to Offerors_10 Nov 26.pdf, page 26
  • CMMC Level 1 now, higher later. The first IDIQ award needs only CMMC Level 1. Later task orders could require a higher level. Confirm your cybersecurity certification now and again before you bid on each order.“The initial IDIQ award only requires a CMMC Level 1 certification.” FA813726R0040 Questions and Answers CAO 25 Aug 2026.xlsx

Key terms

Who can bidSmall business pool and full and open pool; set-aside is partialSize standard is $45 million under NAICS 236210.Notice text
Contract period5-year base ordering period plus one 5-year optionOnly a $500 minimum is guaranteed, and only for the post-award conference.Notice text
How they chooseHighest technically rated offerors that meet a minimum technical threshold; no price evaluation at IDIQ levelYou score yourself, and the government validates the score.Attachment 3 Section M Evaluation Criteria_10 Nov 26.pdf, page 2
Estimated valueUp to $950 million ceiling for all awards combinedA ceiling, not a guaranteed amount. The minimum guaranteed order is $500.Attachment 3 Section M Evaluation Criteria_10 Nov 26.pdf, page 2
Contract typeMultiple award IDIQ; task orders priced laterEach task order sets the execution method: design-build, construction with limited design, or construction only.Notice text

How to respond

  1. Confirm your SAM.gov registration. Your legal name and address must match SF 1442 block 14.
  2. Acknowledge all amendments, 0001 through 0008, in your proposal. An unacknowledged amendment makes you ineligible.
  3. Complete SF 1442 blocks 14 to 19 and 20A to 20C with an authorized signer, and fill in every Section K provision or mark it N/A.
  4. Post your files to DoD SAFE between 30 Nov and the due date, during normal operating hours if possible. Submit by 1:00 PM, Thursday 3 December 2026, -06:00. Where to send beyond DoD SAFE: Not stated.
  5. If you bid both pools, prepare two complete proposals. Keep each work sample document within the 30-page limit.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Expected number, size, and timing of task orders; the notice gives only the $950 million ceiling and $500 minimum.
  • Bond rules: SF 1442 block 12a marks performance and payment bonds required within 10 calendar days after award, but the text does not say whether that applies to the MACC or each order.
  • Site visit or pre-bid meeting rules; none are stated in the text I could review.
  • Exact submission address, portal, and file format; the Section L pages on submission were not provided.
  • The minimum technical threshold score (MTTR); the number is not in the text I could review.
  • Contents of specifications 01 35 26 (safety) and 01 45 00 (quality control); these were not provided and you must read them on SAM.gov.

Notice text

November 20, 2026 Posting an unrestricted version of the full and open cross reference matrix. No other changes at this time. November 19, 2026 Please see amendment 0008 attached. Extending the proposal due date to 03 December 2026 at 1PM to allow for DOD Safe Link actions post holiday. Reminder that documents must be picked up from the DOD Safe within 7 days. Offerors should plan to post them at a time they may be retrieved during normal operating hours some time between 30 Nov and the proposal due date if possible to prevent the documents from needing to be re-posted.

November 13, 2026 1. Extended proposal due date to 30 November 2026 at 1PM 2. Incorporate the following updated documents: Attachment 3 Section M Evaluation Criteria_10 Nov 26 Attachement 2 Section L Instructions to Offerors_10 Nov 26 Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix_10 Nov 26 Attachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix_05 Nov 26 Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix_05 Nov 26 01 25 26_25 Oct 26 01 45-00_25 Oct 26 Attachement 1 Statement of Work 5_Nov_26 Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix_05 Nov 26 3.

Provide for reference use only the following documents intended to assist prospective contractors in identifying changes. The documents listed in paragraph 2 have been substantially edited. Although the government attempted to identify every change, prospective offerors are required to review them in their entirety as the documents provided in paragraph 3 are for reference only and may not have captured every change. MACC Summary of Changes October 2026 (Reference Only) Attachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix_25 Oct 26 (Reference Only) Attachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix_25 Oct 26 (Reference Only) Attachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix_25 Oct 26 (Reference Only) Attachement 1 Statement of Work r4_25 Oct 26 (Reference Only) Attachement_2f_Appendix_F_MACC_FOCross_Reference_Matrix_25 Oct 26 (Reference Only) Attachment 2 Section L Instructions to Offerors_25 Oct 26 (Reference Only) Attachment 3 Section M Evaluation Criteria_25 Oct 26 Follow up Questions and Answers 3 Nov 2026 October 22, 2026 Please see amendment 0006 attached.

Complete RFI responses and documents will be posted at a later date. October 7, 2026 The government is still working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 28 October, 2026, while the government finalizes documents. September 23, 2026 The government is sitll working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 13 October, 2026, while the government finalizes documents.

September 16, 2026 Complete RFI responses posted. Followup questions related to these RFIs can be submitted by September 21 at noon CST. The government is not accepting new questions. Any question submitted must be tied to an answer provided in the attachment. The proposal due date will remain unchanged but the government will continue to monitor the need to extend. September 10, 2026 It was brought to the government's attention that previous solicitation amendments cannot be accessed.

They now have been activated and are accessible. September 3, 2026 Amendment posted with updated Proposal due date, please see attachment. The government is still working to answer all RFIs. August 25, 2026: See attachment for a complete list of RFIs received to date. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry.

August 19 2026: Please see amendment 0002 attached and an updated Section L. August 11 2026: 1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026. 2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them. 4 August 2026: Please see the attached RFP (FA8137-26-R-0040) and all attachments. --------------------------------------------------------------------------------------------------------------- THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma.

The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals. Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government.

The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government. Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project.

This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design submittal 35% to 65%. When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction.

Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished. When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements. The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents.

The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million. The MACC will be executed for one base period of five (5) years with one option period of five (5) years. The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time. Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction.

The definitization of an equitable adjustment begins when the contracting officer receives an adequate change order definitization proposal and ends when the contracting officer executes a contractual action to definitize the change order. IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date.

Failure to do so could result in the offeror being ineligible for award of Department of War contracts IAW RFO 4.203-1 registered in SAM database. DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice. This notice should not be construed as a commitment by the Government for any purpose.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 21, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Air Force by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy