Replace water heaters at Coast Guard, Burlington, VT

Remove and replace two failed natural-gas domestic hot-water heaters at Coast Guard Station Burlington, Vermont, restoring hot water to the galley, berthing and heads.

Official title: CG Station Burlington Replacement Water Heaters

Deadline
Today, 12:00 PM ET
Tuesday, Nov 24
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Burlington, VT
Buyer: Base Cape Cod

What they're buying

Work must start within 14 calendar days after notice to proceed and finish within 14 working days after that start.

Top catches

Offers due today at noon
“Response deadline: 2026-11-24T12:00:00-05:00” SAM.gov record

The response is due today, Tuesday, November 24, 2026, at 12:00 PM (-05:00). The notice was posted the day before, so you have only hours to decide and send a quote.

Email-only submission to two people
“Qoutes must be submitted on company letterhead and submitted to Jessica.L.Bonham@uscg.mil and Jason.L.Williams@uscg.mil” Notice text

The notice names email as the way to send your quote, to two addresses. It does not name a subject line, file format or size limit. Send the quote on company letterhead and keep proof that it was sent.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 3 of 3 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove, drain, disconnect and dispose of the two failed water heaters and all debris.
  • Furnish and install two commercial natural-gas storage water heaters, Rheem-Ruud G91-200-1 or equal, each at least 91 gallons, 199,900 Btu per hour input and 193.8 gallons per hour recovery.
  • Connect water, natural gas, 120-volt electrical, controls and venting, and replace fittings, valves, connectors and insulation as needed.
  • Complete manufacturer startup, leak tests, required permits and inspections.
  • Provide closeout documents, including make, model, serial number and warranty term for each heater.
  • Give a warranty of at least one year from final acceptance covering workmanship, installation and contractor-furnished materials.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Offers due today at noon. The response is due today, Tuesday, November 24, 2026, at 12:00 PM (-05:00). The notice was posted the day before, so you have only hours to decide and send a quote.
  • Email-only submission to two people. The notice names email as the way to send your quote, to two addresses. It does not name a subject line, file format or size limit. Send the quote on company letterhead and keep proof that it was sent.
  • Site visit expected but hard to fit in. The SOW says offerors are urged and expected to inspect the site, and visits go through the COR. With today's deadline, you may not get a visit in time. Call the COR now, or decide whether to bid without one and price the unknown conditions.“Offerors are urged and expected to inspect the site before submitting a quote” SOWBurlingtonHotwatertanks.pdf, page 4
  • Substitute heaters need written approval. Each heater must meet or exceed 91 gallons, 199,900 Btu per hour input and 193.8 gallons per hour recovery. A substitute that falls short needs written approval from the Contracting Officer. Check the existing gas, vent and space fit before you order, because the SOW says not to assume it fits.“The Contractor shall not substitute equipment that provides less than the required per-unit storage capacity, input rating, or recovery capability without written authorization from the Contracting Officer.” SOWBurlingtonHotwatertanks.pdf, page 3
  • Wage and fringe rates add cost. The attached Service Contract Act wage determination sets Burlington rates by job class. It also lists health and welfare of $5.92 per hour, paid holidays and vacation. Price your crew at these minimums and add the benefits, or the job may lose money.“HEALTH & WELFARE: $5.92 per hour, up to 40 hours per week, or $236.80 per week or” Wage Rates Burlington.pdf, page 5
  • Tight schedule with no equipment lead time. Work must start within 14 calendar days after notice to proceed and finish within 14 working days after that. Shutdowns of hot water, gas or power need 48 hours of notice to the COR. Lead time for the heaters is not stated, so line up equipment and crew before award.“diligently complete all work within 14 working days after commencement” SOWBurlingtonHotwatertanks.pdf, page 4

Key terms

Who can bidOpen to all businesses (no set-aside)The size standard for NAICS 238220 is not stated in the provided text.SAM.gov record
Contract periodStart within 14 calendar days of notice to proceed; finish within 14 working daysThe notice to proceed date is not stated.SOWBurlingtonHotwatertanks.pdf, page 4
How to submitEmail on company letterhead to Jessica.L.Bonham@uscg.mil and Jason.L.Williams@uscg.milNo subject line, file format or size limit is stated.Notice text
Site visitUrged and expected; arrange through the CORFailure to visit does not relieve you of performance or pricing responsibility.SOWBurlingtonHotwatertanks.pdf, page 4

How to respond

  1. Before 12:00 PM (-05:00) today, decide whether to bid. If you can still visit, call COR CWO3 Anthony R. Sanchez at (207) 318-2485 or Anthony.R.Sanchez@uscg.mil.
  2. Write your quote on company letterhead. Include solicitation number 37000PR27000016, your name, address and phone number, your price, your warranty terms, and a technical description of the two heaters you offer.
  3. Show with product literature that each offered heater meets or beats 91 gallons, 199,900 Btu per hour input and 193.8 gallons per hour recovery.
  4. Email the quote to Jessica.L.Bonham@uscg.mil and Jason.L.Williams@uscg.mil before 12:00 PM (-05:00) today. File format and subject line: Not stated.
  5. After award, send invoices electronically through the Treasury Invoice Processing Platform at https://www.ipp.gov. Enrollment help: IPPCustomerSupport@fms.treas.gov or (866) 973-3131.

Attached files

From SAM.gov. Download links open the original files.

  • SOWBurlingtonHotwatertanks.pdfThe statement of work that sets the equipment minimums, site visit rules, schedule and warranty. You must read it and price to it; no form is attached. Read.
  • FAR Clauses Services Commercial.pdfA set of FAR and DFARS clauses, some of which ask you to make representations with your offer, such as 252.204-7016 and 252.204-7017. The file is labeled as a summary of clause text, so read the full clauses too. Read.
  • Wage Rates Burlington.pdfA Service Contract Act wage determination for Chittenden County, including Burlington. You read it to find your workers' job classes and minimum wage and fringe rates; no form is attached. Read.

Not stated in what we read

  • Estimated value or budget for this work.
  • The date the notice to proceed will be issued, which starts the 14-day clock.
  • How offers are evaluated and whether price or technical approach counts more.
  • The size standard for NAICS 238220, which decides whether you can count as small.
  • Which licenses the gas, plumbing and electrical work needs, since the SOW says licensed staff are required where required.
  • Whether questions can still be asked before today's deadline, since no question deadline is stated.

Notice text

U.S. Coast Guard Station Burlington requires removal and replacement of failed domestic hot-water heater equipment with new like-for-like equipment and restore reliable hot-water service to the galley, berthing spaces, and heads.see the attached statement of work. Site visits are urged and expected please contact the COR, contact information is in the statement of work. Qoutes must be submitted on company letterhead and submitted to Jessica.L.Bonham@uscg.mil and Jason.L.Williams@uscg.mil In accordance with the IPP clause; ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS - INVOICE PROCESSING PLATFORM (IPP) (JAN 2016), payment requests for all new awards must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

The Contractor must use IPP for contracts and orders awarded April 11, 2016 or later. To constitute a proper invoice, the payment request must comply with the requirements identified in FAR 32.905(b), "Payment documentation and process" and the applicable Prompt Payment clause included in this contract. The IPP website address is: https:// www.ipp.gov. Contractor assistance with IPP enrollment can be obtained by contacting IPPCustomerSupport@fms.treas.gov or phone (866) 973-3131.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from US Coast Guard by email

Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy