1. Opportunities
  2. Department of Homeland Security
  3. US Coast Guard
  4. 70ZU0227QIBCT0004

Dockside repairs on Coast Guard cutter Oak, Newport, RI

Dockside repairs, cleaning, inspections and part renewals on the 225-foot Coast Guard buoy tender USCGC Oak, covered by 35 work items.

Official title: CGC OAK DOCKSIDE REPAIRS

Deadline
Dec 10, 2:00 PM ET
15 days left
Who can bid
Small businesses
Size standard for NAICS 336611: 1,300 employees · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: CG-Sea-C22

What they're buying

The cutter is homeported at Naval Station Newport, RI, and the contract period is not stated.

Top catches

Spec pages 72-129 missing
“[pages 72-129 of this document were not provided]” ATTACHMENT 2 OAK Specifications (WLB 225B) DS FQ2 BGW 26 Rev 0.pdf

We could not read pages 72 to 129 of the specification. They cover items 14 to 23, including chain stoppers, winches, davits, the buoy crane and grey water piping. Get the full specification from SAM.gov before you price those items.

Fire plan due with bid
“The Contractor must submit a copy of the developed availability specific fire plan as requested in the Fire Protection and Response work item, with the Contractor’s bid.” ATTACHMENT 2 OAK Specifications (WLB 225B) DS FQ2 BGW 26 Rev 0.pdf, page 15

Your bid must include the availability-specific fire plan, not just a promise to write one. The fire prevention work item is not priced separately, so build its cost into the other items.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 3 of 6 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Clean and inspect fuel, hydraulic oil, potable water and air tanks. Remove up to 5,000 gallons of diesel and 1,000 gallons of hydraulic oil.
  • Clean main and generator exhaust piping and 17 vent duct systems, with video inspection of the engine room ducts.
  • Inspect and service deck machinery: chain stoppers, winches, capstan, two davits, commissary hoist and buoy crane. Items 14 to 22 must finish in the first 25% of the period.
  • Clean and flush grey water and sewage piping, including about 1,400 linear feet of sewage pipe.
  • Replace 11 weather deck LED floodlights. Renew one weathertight door, one watertight hatch, one scuttle, kickpipes and four gooseneck vents.
  • Renew about 1,800 sq ft of carpet and about 667 sq ft of deck covering, seal 406 sq ft, and provide duty section berthing for 2 men and 2 women.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Spec pages 72-129 missing. We could not read pages 72 to 129 of the specification. They cover items 14 to 23, including chain stoppers, winches, davits, the buoy crane and grey water piping. Get the full specification from SAM.gov before you price those items.
  • Fire plan due with bid. Your bid must include the availability-specific fire plan, not just a promise to write one. The fire prevention work item is not priced separately, so build its cost into the other items.
  • Nine items due early. Items 14 to 22 must be finished in the first 25% of the contract period, but the notice does not state the period length. Plan these inspections early and ask for the period dates.“which the Contractor must complete within the first 25% of the availability contract period” ATTACHMENT 2 OAK Specifications (WLB 225B) DS FQ2 BGW 26 Rev 0.pdf, page 12
  • Email address has a space. The first recipient address shows a space: Arlene.d.wright @uscg.mil. A bad address can stop your quote from arriving by the deadline, so check it before you send and keep proof of the sent email.“Arlene.d.wright @uscg.mil” Notice text
  • Small business set-aside only. Only small businesses may bid. The notice gives no size standard beyond NAICS 336611, so check your size against that code before you spend time on the quote.“Small Business Set Aside - Total” SAM.gov record
  • Year and site differ in spec. The notice says FY27 at Naval Station Newport, but the specification cover says FY2026 and states the work is at a Navy facility. Get the year and site confirmed in writing before you price.“This availability is to be conducted at an US Navy facility.” ATTACHMENT 2 OAK Specifications (WLB 225B) DS FQ2 BGW 26 Rev 0.pdf

Key terms

Who can bidSmall businesses only (total small business set-aside)NAICS 336611 is listed. Check your size under that code.SAM.gov record
How to submitEmail to Arlene.d.wright @uscg.mil and Sandra.a.martinez@uscg.milEmail is the only method named. The first address has a space in it.Notice text
Contract typePriced by job, with option itemsEach of the 35 work items is priced as one job. Option items are not identified.ATTACHMENT 1 PRICING OAK (WLB 225B) BLANK.pdf, page 2

How to respond

  1. Send your quotation by email to Arlene.d.wright @uscg.mil and Sandra.a.martinez@uscg.mil. Check the first address before sending because the notice shows a space in it.
  2. Make sure the quote arrives by Thursday, December 10, 2026, 2:00 pm Eastern Time. File format: Not stated.
  3. Include the availability-specific fire plan with your bid, as required by paragraph 3.1.1.2 of the specification.
  4. Fill in the pricing schedule (Attachment 1) for items D-001 to D-035 and the labor rate line. The notice does not state a required price format or signature.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Contract period length and start and end dates for the availability.
  • Estimated value or budget for the work.
  • How quotes will be judged and the award method.
  • How to ask questions and the question deadline; the clarification form (Attachment 4) could not be read.
  • The solicitation files 70ZU0227QIBCT0004++FY-27+CGCOAK+DOCKSIDE.pdf and 70ZU0227QIBCT0004_OAK.pdf were left out and not reviewed. Read them on SAM.gov.
  • Whether there is a site visit or pre-bid meeting.

Notice text

DESCRIPTION OF WORK: The contractor to provide all necessary materials, equipment, personnel as necessary to perform Dockside repairs to the U.S. Coast Guard Cutter USCGC OAK (WLB 225 B) FY27 Dockside Availability 225’ Buoy Tender homeported Naval Station Newport, RI all in exact accordance with this solicitation and the attached specification. See Attachment 2. QUOTATION DUE DATE: Your quotation must arrive no later than 12/10/2026 at 2:00 pm Eastern Time; Quotations should be sent via electronic mail (e-mail) to Arlene.d.wright @uscg.mil and Sandra.a.martinez@uscg.mil.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from US Coast Guard by email

Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy