1. Opportunities
  2. Department of Veterans Affairs
  3. 36C25227Q0059

Chiller compressor replacement at Hines VA, Illinois

Replace two McQuay chiller compressors that cool Building 228 at the Edward Hines Jr. VA Hospital in Hines, Illinois, under a firm fixed price base year from January 15 to July 14, 2027.

Official title: 4130--Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228

Deadline
Dec 3, 10:00 AM CT
8 days left
Who can bid
SDVOSB firms
Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Hines, IL
Buyer: 252-Network Contract Office 12 (36C252)

What they're buying

Only SBA-certified service-disabled veteran-owned small businesses (SDVOSBs) may bid, and quotes are due Thursday, December 3, 2026 at 10:00 AM (-06:00).

Top catches

Only certified SDVOSBs can bid
“Offers received from concerns that are not SDVOSB concerns certified by SBA will not be considered.” Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 21

Quotes from firms that SBA has not certified as SDVOSBs will not be considered. Confirm your SDVOSB status is designated in SAM and listed by SBA before you spend time on a quote.

Site visit is today
“SITE VISIT IS SCHEDULED FOR THURSDAY NOVEMBER 19, 2026, AT 10:00 AM” Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 3

The site visit is today, November 19, at 10:00 AM local time, and the notice strongly expects attendance. No second visit is listed, so decide now whether to attend.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 2 of 2 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove and replace two chiller compressors on the McQuay WMC290DBS-ER10 chillers (Turbocor compressors) in Building 228.
  • Perform startup to manufacturer specifications and verify proper operation of each new compressor.
  • Provide written documentation of proper installation per manufacturer specifications.
  • Submit a detailed schedule to the COR within 30 days of notice to proceed; it must be approved before onsite work starts.
  • Submit permit requests 14 calendar days before each event and shop drawings and submittals 14 calendar days before construction.
  • Warrant the installed compressor for 1 year from the date of startup.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Only certified SDVOSBs can bid. Quotes from firms that SBA has not certified as SDVOSBs will not be considered. Confirm your SDVOSB status is designated in SAM and listed by SBA before you spend time on a quote.
  • Site visit is today. The site visit is today, November 19, at 10:00 AM local time, and the notice strongly expects attendance. No second visit is listed, so decide now whether to attend.
  • Fixed dates may not fit the award. The performance dates are fixed at January 15 to July 14, 2027, but the PWS counts 180 days from award. Equipment lead time is blank, so a late award or slow parts could shorten your working window. Price this risk and ask for the lead time before you quote.“The period of performance shall not exceed one hundred eighty days (180) days after contract award.” Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 10
  • Subcontracting certificate is mandatory. The services box (50% limit on work paid to non-SDVOSB or non-VOSB firms) is checked, yet the NAICS code is a construction code and the 85% construction line is unchecked. Ask which limit applies, and return the signed certificate with your quote or your offer is ineligible.“The Government will not consider offers for award from offerors that do not provide the certification” Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 36
  • Submission address is missing. The email address and other sending instructions are in Section E, which was cut off in the text we received. Get the full solicitation from SAM.gov or ask the contract specialist before the questions deadline.“Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation.” Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 39
  • Blank price schedule sinks quote. The price schedule has blanks for unit price, equipment lead time and grand total. Fill every blank with firm fixed pricing, because a partly completed schedule can make your whole quote unacceptable.“If the Price Schedule is not completed entirely, or the offeror indicates additional/variable pricing fees, the entire quote may be considered unacceptable” Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 41

Key terms

Who can bidSBA-certified SDVOSBs onlyQuotes are only considered from concerns designated in SAM as SDVOSBs certified by SBA.SAM.gov record
Contract periodJan 15, 2027 to Jul 14, 2027 (base year)The PWS caps the whole contract at 180 days after award; onsite work is expected within 90 days.Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 9
How they chooseMost advantageous quote, weighing price, technical capability and relevant experienceThe Government may accept other than the lowest offer.Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 41
How to submitBy email; address not stated in the text we could readSection E was cut off after page 41. Get the full solicitation from SAM.gov.Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 3
Questions dueMonday, November 23, 2026, 10:00 AM local timeSend written questions by email to Dayanna Wallace at Dayanna.Wallace@va.gov.Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 3
Contract typeFirm fixed price, commercial services (RFQ)Nonpersonal services; VA staff do not supervise your workers.Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 3
Site visitThursday, November 19, 2026, 10:00 AM local time (today)Meet COR Jason Espinosa at the Building 228 lobby. Strongly expected, but the text does not make it mandatory.Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdf, page 3

How to respond

  1. Confirm your SDVOSB certification is listed by SBA and designated in SAM before you quote.
  2. Complete the SF 1449 first page blocks 17a and 30a to 30c, page 2 acknowledgment of amendments and contractor information, the 52.219-1 small business representations, and the 852.219-75 subcontracting certificate, signed and dated.
  3. Fill in the price schedule item 0001 with a firm fixed unit price, equipment lead time and grand total.
  4. Email the complete quote before Thursday, December 3, 2026, 10:00 AM (-06:00). The email address is not stated in the text we could read; get it from the full solicitation on SAM.gov.

Attached files

From SAM.gov. Download links open the original files.

  • Solicitation 36C2527Q0059 -Chiller Compressor Replacement.pdfThe main solicitation with the SF 1449 cover form, work statement, clauses and quote instructions; we could read it only through page 41 of 47, and you must complete the price schedule, certificates and signature blocks. Read in part.
  • WD - Cook County 2015-5017 Rev 34.pdfThe Department of Labor wage determination for Cook County, Illinois, which sets the labor rates you must price; the text we received was garbled and partial, so you must read the rates yourself. Read in part.

Not stated in what we read

  • Email address and full submission instructions, because Section E was cut off after page 41.
  • Estimated contract value; the notice does not state it.
  • Equipment lead time for the compressors, which is blank in the price schedule.
  • Actual HVAC mechanic wage rates in the Cook County wage determination, which we could not read reliably.
  • Whether an alternate compressor brand or model is allowed in place of the McQuay Turbocor units.
  • Details of evaluation factors 2 and 3 (technical capability and relevant experience), which were cut off.

Notice text

Solicitation 36C25227Q0059 attached.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 17, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy