1. Opportunities
  2. Department of Defense
  3. Defense Logistics Agency
  4. SPRPA127QZA46

Circuit card assembly repair, critical safety item

DLA Aviation is seeking quotes for circuit card assemblies, a critical safety item, and the statement of work describes repair work.

Official title: 59--CIRCUIT CARD ASSEMB

Deadline
Dec 14, 3:30 PM ET
19 days left
Who can bid
Not stated
The notice names no set-aside
Last time
$742K
Likely BAE Systems Information and Electronic Systems Integration Inc.
Place
Not stated
Buyer: DLA Aviation at Philadelphia, PA

What they're buying

The notice gives no quantities, contract period, or place of performance.

Top catches

Critical safety item quality rules
“The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent.” Notice text

This is a critical safety item, so your quality control system must meet the listed standards. Confirm you meet them before you bid.

Email-only proposal delivery
“REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)” Notice text

Proposals go by electronic mail, but the notice does not clearly give the address. Confirm the address and any file rules with the contact before the deadline.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Repair of circuit card assemblies, with repair and test procedures submitted for Government review and approval.
  • Quality control system meeting Mil-I-45208A, Mil-Q-9858, or ISO 9000/9001/9002 or equivalent.
  • Receiving inspection of purchased parts, with dimensional, material, finish and process records kept at least 12 months after acceptance.
  • Historical record file for each item by serial number, with repair travelers and test data, available to the Government on request.
  • Markings per MIL-STD-130 and packaging per MIL-STD 2073.
  • One-year warranty after delivery, with defects reported within 45 days of discovery.

Who supplied it lately

$742K

on a recent contract for the same kind of product: BAE Systems Information and Electronic Systems Integration Inc.. It ended Nov 23, 2026.

Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.

What to watch for

  • Critical safety item quality rules. This is a critical safety item, so your quality control system must meet the listed standards. Confirm you meet them before you bid.
  • Email-only proposal delivery. Proposals go by electronic mail, but the notice does not clearly give the address. Confirm the address and any file rules with the contact before the deadline.
  • Drawings missing but TDP cited. The notice says no drawings are available, yet the inspection clause requires conformance to the Technical Data Package. Ask the contact how to get the TDP before you price the work.“NO DRAWINGS ARE AVAILABLE FOR THIS REQUEST FOR QUOTATION.” Notice text
  • Mandatory Workflow Pro use. The notice requires use of Workflow Pro (WFP) but does not say what you must do in it. Ask before you bid, since system access may take time.“MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE” Notice text
  • One-year warranty with defect window. You must warrant the supplies for one year after delivery, and defect claims run 45 days after discovery. Price this warranty into your quote.“45 DAYS AFTER DISCOVERY OF THE DEFECT” Notice text
  • Government decides AS-IS items. Your internal review board cannot approve AS-IS items, and the Government keeps that decision. Plan for possible delays and variance requests through DCMC.“IRB shall not use "AS-IS" disposition.” Notice text

Key terms

Who can bidSet-aside not stated; size standard listed as 750The unit of the 750 size standard is not stated, and the notice does not say whether a set-aside applies.Notice text
How to submitBy electronic mail; address not clearly statedROBYN.GRINARML@DLA.MIL appears beside a Workflow Pro clause. Confirm it is the proposal address.Notice text
Contract typeFixed-price, per clause titleStated only in an inspection clause title in the notice text.Notice text

How to respond

  1. Send your proposal by electronic mail. The notice does not state the exact address; ROBYN.GRINARML@DLA.MIL appears beside the Workflow Pro clause, so confirm it with the contact first.
  2. Send it before Monday, December 14, 2026, 16:30:00-04:00, as written in the SAM.gov record.
  3. Include: Not stated. The notice does not list required proposal contents, forms, or pricing format.
  4. Complete the certificates and representations named in the notice, including the Buy American certificate and Annual Representations and Certifications, and set up Workflow Pro access.

Not stated in what we read

  • Estimated value of the buy.
  • Quantities and delivery schedule for the circuit card assemblies.
  • Contract period and place of performance.
  • Set-aside status and how the 750 size standard applies.
  • What the Workflow Pro (WFP) module requires you to do.
  • How to get the Technical Data Package (TDP) and any drawings.

Notice text

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO|N/A|TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|N/A| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ROBYN.GRINARML@DLA.MIL| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 YEAR AFTER DATE OF DELIVERY|45 DAYS AFTER DISCOVERY OF THE DEFECT||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| CRITICAL SAFETY ITEMS (AUG 2011)|4|NIIN 015191467|||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA --MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7|||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| COST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|ELECTRONIC MAIL| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| NO DRAWINGS ARE AVAILABLE FOR THIS REQUEST FOR QUOTATION.

NAICS CODE: 334412 SMALL BUSINESS SIZE STANDARD: 750 THIS IS A CRITICAL SAFETY ITEM (CSI). \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein.

Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures.

QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements.

A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP).

Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government.

NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition.

A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work.

The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items.

REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing.

RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable.

Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who has supplied this lately

Contracts at Defense Logistics Agency for the same kind of product (NAICS 334412, product code 5998) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.

ContractObligatedEndsState
Spares Buy Contract for the Circuit Card Assemb F-16 Ais Test Station SystemBAE Systems Information and Electronic Systems Integration Inc. · SPRHA425C0015$742,162Nov 23, 2026endedCA
Circuit Card AsAtlantic Diving Supply, Inc. · SPRMM126FE30W$462,866Nov 30, 2026within a monthAL
Electronic ComponenDB Systems, Inc. · SPE7M526P3498$197,058Nov 30, 2026within a monthUT
Circuit Card AssembSupplycore LLC · SPRMM125FE80G$480,711Nov 19, 2026endedIL
Jumper Board, AircraL3HARRIS Technologies Integrated Systems L.P. · SPE7M126P5485$129,056Dec 1, 2026within a monthTX

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 17, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Defense Logistics Agency by email

Each morning we'll send the new solicitations and sources-sought notices from Defense Logistics Agency, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy