- Opportunities
- Department of Veterans Affairs
- 36C26027R0014
Domestic water repairs at Spokane VA medical center, WA
The VA Spokane Healthcare System wants a contractor to correct domestic water system deficiencies in Buildings 1 and 12 at Mann-Grandstaff VA Medical Center, Spokane, WA, within 275 calendar days.
Official title: Z1DA--CON-NRM-668-22-106 Correct Domestic Water System
- Deadline
- Dec 3, 12:00 PM PT
- 8 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: 260-Network Contract Office 20 (36C260)
What they're buying
The work covers dead-leg removal, new valves, sensors and water monitoring in an occupied hospital, and the solicitation is limited to service-disabled veteran-owned small businesses.
Top catches
“This Procurement is 100% Service Disabled Veteran Owned Small Business (SDVOSB) Set-Aside” 36C26027R0014.docx
The SAM record shows no set-aside, but the solicitation is limited to service-disabled veteran-owned small businesses. If you are not registered as one with the Small Business Administration, do not bid. Check your status before you spend time on the offer.
“Proposals must be submitted electronically via e-mail to the POCs noted in the Formal Communications paragraph no later than November 23, 2026, at 12 PM Pacific Time.” 36C26027R0014.docx
Section 1.1.1 still says proposals are due November 23, 2026, which has passed. Amendments 0001 and 0002 set the due date to December 3, 2026, 12:00 PM Pacific Time. Plan to the later date and ask the contracting officer to confirm it in writing.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 8 of 18 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Dead-leg removal, automatic flushing faucets, valve replacement, check valves, mixing valves and insulation in Buildings 1 and 12
- Temperature and pressure sensors, flow meters and water monitoring panels that connect to the existing building automation system
- Point-of-use mixing valves and sub-micron Legionella filters where the drawings and RFI answers call for them
- Asbestos and lead paint removal in areas marked on the hazardous materials drawings, with containment and air monitoring
- Disinfection, flushing, and bacteriological and Legionella sampling by the contractor, with twice-weekly flushing of affected fixtures
- Pre-commissioning and O&M documents, training, a one-year warranty, and 24 months of monitoring service
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Set-aside status conflicts. The SAM record shows no set-aside, but the solicitation is limited to service-disabled veteran-owned small businesses. If you are not registered as one with the Small Business Administration, do not bid. Check your status before you spend time on the offer.
- Old due date still in text. Section 1.1.1 still says proposals are due November 23, 2026, which has passed. Amendments 0001 and 0002 set the due date to December 3, 2026, 12:00 PM Pacific Time. Plan to the later date and ask the contracting officer to confirm it in writing.
- Email only, split large files. Offers go by email only, with no hard copies, in three volumes. Split any file over 10 MB into separate emails and send each part to both listed contacts.“Submissions exceeding file 10MB shall be broken into multiple e-mails or coordinated with the POCs to assure successful file sharing.” 36C26027R0014.docx
- Bid guarantee of 20 percent. Volume 3 must include an SF 24 bid guarantee of at least 20 percent of your bid price, up to $2 million. On a $1 million bid, that is $200,000. A missing or short guarantee can get your bid rejected.“The bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $2 million.” 36C26027R0014.docx
- Prime-only past performance. List 2 to 4 projects finished in the past five years as prime contractor, each done in an occupied healthcare setting with infection-control controls. Subcontract work does not count (RFI 12), so start collecting references now.“Projects submitted must have been completed with the offeror as the prime contractor for the project.” 36C26027R0014.docx
- Limitations on subcontracting certificate. Return the full VAAR 852.219-75 clause, filled in and signed, with your offer, or you may be ineligible. The government says a 75 percent cap applies for this NAICS code. The copy of this clause in the attachments had no readable text, so get the full clause from SAM.gov.“All offerors must return the entire clause, in full text, with your acknowledgement.” 36C26027R0014.docx
Key terms
| Who can bid | Service-disabled veteran-owned small businesses only (100% set-aside)NAICS 238220 size standard is $19M. The SAM record shows the set-aside as Not stated.36C26027R0014.docx |
|---|---|
| Contract period | 275 calendar days from notice to proceedCounted from notice to proceed, per the statement of work.Attachment 1 668-22-106_Construction - SOW R2.pdf, page 2 |
| How they choose | Best value tradeoff using technical, past performance and price factorsThe detailed evaluation section was not in the text provided.36C26027R0014.docx |
| How to submit | Email to both listed contacts, in three separate volumesNo hard copies are accepted. Files over 10 MB must be split across several emails.36C26027R0014.docx |
| Questions due | Closed: November 9, 2026, 10:00 AM Pacific TimeGovernment answers were posted in amendment 0002.36C26027R0014.docx |
| Estimated value | Between $1,000,000 and $2,000,000This is a stated magnitude range, not an exact estimate. Liquidated damages do not apply (RFI 13).36C26027R0014.docx |
| Contract type | Firm-fixed-price construction contractThe price breakdown sheet says all pricing is fixed price.36C26027R0014.docx |
| Site visit | Closed: October 26, 2026, 9:00 AM Pacific TimeLater visits are only by appointment with the COR. The site visit roster could not be read.36C26027R0014.docx |
How to respond
- Email Volumes 1, 2 and 3 to Brenda.Bigelow1@va.gov and Dennis.Einarson@va.gov so they arrive before Thursday, December 3, 2026, 12:00 PM Pacific Time.
- Title each file with solicitation number 36C26027R0014, your company name, then Volume 1 Technical Proposal, Volume 2 Past Performance Proposal, or Volume 3 Price-Cost Proposal.
- Keep Volume 1 to 13 pages and Volume 2 to 25 pages, on 8.5 by 11 paper with at least 11-point single-spaced text.
- Put in Volume 3 the signed SF 1442, acknowledgment of amendments 0001 and 0002, the SF 24 bid guarantee, representations and certifications, the signed limitations on subcontracting certificate, and the price schedule.
- Split any file over 10 MB into several emails. Hard copies are not accepted.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 10 - 668-22-106 - Past Performance Questionnaire.docx Not read: over our length limit.
- Attachment 12- 668-22-106 Wage Determination.pdf Not read: over our length limit.
- Attachment 4 - 668-22-106_PCRA_Pre-Construction Risk Assessment Checklist ver6.pdf Not read: over our length limit.
- Attachment 8 - 668-22-106 - Limitations on Subcontracting-Construction.docLimitations on subcontracting certificate. The file came through with no readable text, so we could not review it. Get the full clause from SAM.gov, fill it in, sign it and return it. Read.
- Attachment 5 - 668-22-106_ICRA_VHA ICRA 2023-1_TypeA_Low-High_Risk.docx Not read: over our length limit.
- All RFI and Questions 668-22-106 Correct Domestic Water System 36C25027R0014.docxVendor questions and government answers read in full. The answers change scope, schedule and pricing, so read them before you price; no form to sign. Read.
- Attachment 9 - 668-22-106 - Contractor Rules of Behavior.pdf Not read: over our length limit.
- Attachment 1 668-22-106_Construction - SOW R2.pdfStatement of work read in full. It sets the schedule, work-hour limits and deliverables you must follow; you do not sign it. Read.
- 668-22-106 Site Visit Roster.pdf Scanned image, not read.
- Attachment 6 - 668-22-106_ICRA_VHA ICRA 2023-1_Type B_Level3.docx Not read: over our length limit.
- 36C26027R0014 0001.docxAmendment 0001 read in full. It moves the due date to December 3, 2026 and mentions a site visit attendee list; acknowledge it with your offer. Read.
- Attachment 11 - Price Schedule Breakdown.xlsxPrice breakdown sheet. You must fill in your prices; the sheet says the breakdown is for information only. Read.
- 36C26027R0014 0002.docxAmendment 0002 read in full. It posts government answers to vendor questions and repeats the December 3 due date; acknowledge it with your offer. Read.
- Attachment 3 - 668-22-106_Construction - Specifications.pdfSpecifications read only in part (pages 1 to 28 and 748 to 762). Read the full set before pricing; no form to sign. Read in part (pages 1–28 and 748–762 of 762).
- Attachment 13 - 668-22-106 - Site Visit Area Map.pdf Scanned image, not read.
- 36C26027R0014.docxSolicitation form SF 1442 and sections through 3.2 read only in part; the text was cut off. You must complete and sign the offer forms and the price schedule. Read in part.
- Attachment 2 - 668-22-106_Construction - Drawings.pdf Could not be read.
- Attachment 7 - 668-22-106_ICRA_VHA ICRA 2023-1_TypeB_HighestRisk_SPOIC_Edited.docx Not read: over our length limit.
Not stated in what we read
- Exact estimated value: only a range of $1,000,000 to $2,000,000 is given.
- Wage rates: Attachment 12 (Wage Determination) could not be reviewed. You must read it before pricing labor.
- Insurance limits and performance and payment bond amounts: the supplemental insurance section and bond terms were not in the text provided.
- How many days your offer must stay valid: the form blank is not clearly filled in.
- Evaluation weighting and rating method (Section M): the text was cut off.
- Drawings (Attachment 2) and the scanned site visit roster and map could not be read, and several other attachments were left out for length. You must read them before bidding.
Notice text
Please see amendment 0002 document.
As published on SAM.gov.
Contacts
- Brenda R Bigelow, Contractor, Contract Specialist, Brenda.Bigelow1@va.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 3, 12:00 PM PT8 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238220, plumbing, heating, and air-conditioning contractors, soonest deadline first.
- Department of Veterans AffairsChiller System Maintenance
- Department of Veterans AffairsControls Preventive Maintenance
- Department of the ArmyReplace two air handling units at Watervliet Arsenal, NY
- Bureau of Engraving and PrintingReplace air pollution oxidizer at Fort Worth, TX
- Departmental OfficesFire sprinklers and alarms at Honaunau park dorm, HI
- Departmental OfficesHeating leak repair at refuge visitor center, Homer, AK
- Department of Veterans AffairsBrine tank maintenance and salt delivery, Loma Linda, CA
- Department of Veterans AffairsAnnual Chiller Maintenance & Remote 24/7 Monitoring
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy