Building repair and addition, North Fort Hood, TX

The Army Reserve is buying design and construction to repair Maintenance Building 56767 at the Equipment Concentration Site and add to it, including HVAC, electrical, fire system and roof work.

Official title: Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX

Deadline
Dec 8, 2:00 PM ET
12 days left
Who can bid
Small businesses
Size standard for NAICS 236220: $45 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Gatesville, TX
Buyer: W072 Endist Louisville

What they're buying

The firm-fixed-price contract is estimated at 913 calendar days after notice to proceed, and only small businesses invited into Phase II may bid.

Top catches

Phase II selected offerors only
“AMENDMENT 0005 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY ON MONDAY, 23 NOVEMBER 2026” Notice text

Only a target of five offerors from Phase I are invited into Phase II. Amendments 0001 to 0005 went only to those offerors, so if you were not invited, you cannot bid this round.

Phase II rules are a draft
“Section 00 22 18 is being issued as a draft for reference only during Phase I and is subject to change when” W912QR25RA013_Specs_Ph1-0000.pdf, page 31

The Phase II section in the provided text is marked as a draft. Amendments 0001 to 0005 are not in the provided text, so the final rules may differ from what is shown here.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 2 of 4 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Repair HVAC and electrical systems. Replace the electrical system, including panels, lights, conduit and transformer, and leave 15% spare load capacity.
  • Build a 4,800 SF maintenance bay addition with drive-through bays, a safety aisle and an overhead bridge crane.
  • Replace the roof on the administrative and maintenance areas, and repair the warehouse roof with new coating and gutters.
  • Replace the fire alarm with a combined fire alarm and mass notification system. Convert sprinklers to wet-pipe and replace the fire pump.
  • Rebuild restrooms and showers to be accessible, add a lactation room and lockers, and provide a code-compliant accessible ramp.
  • Replace exterior doors and two windows to meet DoD antiterrorism standard UFC 4-010-01. Complete a demolition asbestos inspection before demolition.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Phase II selected offerors only. Only a target of five offerors from Phase I are invited into Phase II. Amendments 0001 to 0005 went only to those offerors, so if you were not invited, you cannot bid this round.
  • Phase II rules are a draft. The Phase II section in the provided text is marked as a draft. Amendments 0001 to 0005 are not in the provided text, so the final rules may differ from what is shown here.
  • Fire alarm must be Monaco equipment. The sole-source justification says only Monaco (MEI) fire alarm radio and transceiver equipment will work with the existing system. If you cannot supply it, ask the contracting officer whether an equivalent is allowed before you price the fire alarm work.“Monaco equipment is necessary for this action.” Justifciation and Approval - Brand-Name Monaco Fire Alarm Equipment (Redacted).pdf, page 3
  • Cyber assessment needed at award. You must have a current Basic NIST SP 800-171 DoD Assessment posted in SPRS at award. Check your score and PIEE access now and fix any gap before you bid.“are required at time of award to have at least a Basic NIST SP 800-171 DoD Assessment that is current (i.e., not more than 3 years old unless a lesser time is specified in the solicitation).” W912QR25RA013_Specs_Ph1-0000.pdf, page 6
  • Square footage does not match specs. The notice says about 26,000 square feet, but the specs add an 8,404 SF administrative area and a 58,290 SF warehouse that also gets roof work. Confirm with the contracting officer which areas and square footage you must price.“an existing ~26,000 square feet of the maintenance part of the Equipment Concentration Site” Notice text
  • Late furniture areas cost extra. Late readiness of areas for government furniture installation costs $1,690 for each seven calendar days. That is on top of the normal liquidated damages for missing the completion date, so build this date into your schedule and price.“in the amount of $1,690 for each seven calendar days of the delay until the requirement is fulfilled.” W912QR25RA013_Specs_Ph1-0000.pdf, page 94

Key terms

Who can bidSmall businesses only, and only Phase II selected offerorsSize is set by NAICS 236220 in SAM. Amendments were issued only to Phase II selected offerors.Notice text
Contract period913 calendar days from notice to proceedOptions may be included if funds allow. The Phase I package says work starts within 10 calendar days of award.Notice text
How they chooseBest-value trade-off, with price and non-price factors about equalThe government may award without negotiations, but reserves the right to negotiate.Notice text
How to submitElectronic upload through the PIEE Solicitation moduleEmail and hard copies are not accepted. The upload time recorded in PIEE is the time of receipt.W912QR25RA013_Specs_Ph1-0000.pdf, page 15
Estimated value$10,000,000 to $25,000,000 (construction magnitude)This is an estimate range, not a contract price.Notice text
Contract typeOne firm-fixed-price contract, with optionsOption items are listed on the Price Breakout Schedule, which is not in the provided text.Notice text
Site visitSite visit during Phase II; whether it is mandatory is not statedA sign-in sheet dated 06 Oct 2026 is attached but is a scanned image that could not be read.W912QR25RA013_Specs_Ph1-0000.pdf, page 5

How to respond

  1. Confirm that you are a Phase II selected offeror, and get amendments 0001 to 0005 from PIEE or SAM.gov.
  2. Keep your SAM.gov registration active, and complete PIEE Vendor registration under your CAGE code with the Proposal Manager role.
  3. Prepare Volume I (design narrative, management plan, schedule narrative) and Volume II (SF 1442 and price breakout schedule), as the draft Phase II section describes. Check the final rules in the amendments.
  4. Upload the complete proposal through the PIEE Solicitation module before Tuesday, December 8, 2026, 2:00 PM, -05:00. Email and hard copies are not accepted.
  5. Keep the PIEE upload confirmation. Send questions about submission methods to contract specialist Bonny Dylewski at bonny.c.dylewski@usace.army.mil.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Contents of Phase II amendments 0001 to 0005, which were not provided and set the final Phase II rules.
  • Whether the Phase II site visit is mandatory, its date, and what the scanned sign-in sheet dated 06 Oct 2026 requires.
  • The option items and their prices, which are on the Price Breakout Schedule and not in the provided text.
  • Whether performance and payment bonds are required. The SF 1442 shows 10 days but the YES or NO box is not clear in the text.
  • Phase II question deadline and the method for submitting questions.
  • Contents of the plans file, which was left out for length. You must review the drawings yourself.

Notice text

*****AMENDMENT 0005 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY ON MONDAY, 23 NOVEMBER 2026**** *****AMENDMENT 0004 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY ON THURSDAY, 12 NOVEMBER 2026**** *****AMENDMENT 0003 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY ON MONDAY, 02 NOVEMBER 2026**** *****AMENDMENT 0002 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY ON MONDAY, 19 OCTOBER 2026**** *****AMENDMENT 0001 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY ON TUESDAY, 22 SEPTEMBER 2026***** Request for Proposal (RFP), Solicitation No. W912QR25RA013 is issued for the repair of a failing Equipment Concentration Site (ECS), B-56767, at North Fort Hood (formerly Fort Cavazos), TX. This project will repair and construct an addition to an existing ~26,000 square feet of the maintenance part of the Equipment Concentration Site, Maintenance Building 56767, that is in a failing condition, and has not undergone any major infrastructure or system repairs, only limited maintenance and repair work has occurred.

The project includes repair of HVAC and Electrical systems, remove non-structural interior walls to right-size rooms and create open flexible workspace, restore inadequate and non-code compliant bathrooms, repair light fixtures with code compliant units, failed flooring, code compliant fire alarm and suppression system, repair electrical conduit distribution throughout the facility. Access for individuals with disabilities will be provided to include a code compliant entrance ramp.

The restored facility will meet minimum DOD Antiterrorism standards. This project contains options. The contract duration is estimated at 913 calendar days from Contract Notice to Proceed (NTP).This award is Subject to the Availability of Funds (SAF). TYPE OF CONTRACT AND NAICS: This RFP will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System (NAICS) code for this effort is 236220 Commercial and Institutional Building Construction.

TYPE OF SET-ASIDE: Total Small Business Set-Aside Procurement. SELECTION PROCESS: This is a two-phase Design/Build procurement. The proposals will be evaluated using a Best-Value Tradeoff (BVTO) source selection process. The technical information contained in each Offeror s proposal will be reviewed, evaluated, and rated by the Government. Phase II Selected Offerors are requested to submit additional information described in Section 00 22 18 of the Solicitation, for review and evaluation by the Government.

The selection process for Phase II will evaluate such factors as: Design Narrative, Management Plan, Schedule Narrative, and Price. The Standard Form (SF) 1442, resubmission of Evidence of Ability to Obtain Bonding and Proof of Financial Ability, and resubmission of Pre-Award Information will also be required. All evaluation factors, other than cost or price, are considered approximately equal to cost or price. NEGOTIATIONS: The Government intends to award without negotiations, but reserves the right to conduct negotiations should it be deemed in the Government s best interest.

CONSTRUCTION MAGNITUDE: The estimated construction magnitude of this construction project is anticipated to be between $10,000,000 and $25,000,000. SOLICITATION DOCUMENTS: Paper copies of the solicitation and amendments will not be issued. Telephone, email, and fax requests for this solicitation, amendments, and attachments (plans and specifications) will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader.

To be able to download the solicitation for this project, contractors are required to register at the System for Award Management at https ://sam.gov. Amendments, when issued, will be posted to the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal and SAM.gov websites for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the websites periodically for any and all amendments to the solicitation.

System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror .POINT-OF-CONTACT: The point-of-contact for this procurement is Bonny Dylewski, at bonny.c.dylewski@usace.army.mil. PARTNERING WITH US: https://www.usace.army.mil/Business-With-Us/Partnering/Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ and then clicking on: View FFP Contract Changes Playbook Here.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy