- Opportunities
- Department of Homeland Security
- US Coast Guard
- 70Z08526QLREP0026
Dockside repairs on Coast Guard cutter STORIS, Seattle, WA
Dockside repairs, inspections and overhauls on the Coast Guard cutter STORIS at its Seattle homeport, bought as a small-business requirements contract with firm fixed price task orders.
Official title: Dockside (DS) – USCGC STORIS Fiscal Year 2027
- Deadline
- Dec 21, 12:00 PM PT
- 26 days left
- Last time
- $1.09M
- Likely Platypus Marine Inc
- Place
- Seattle, WA
- Buyer: CG-Sea-C22
What they're buying
Task Order 1 lists 25 work items with an anticipated work window of 19 April to 11 June 2027.
Top catches
“The last day to request the technical package regarding this solicitation is one week before the solicitation close date.” 70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 4
The technical package request and your questions both close at 12:00 p.m. Pacific on 14 Dec 2026. The package requires a current Joint Certification Program (JCP) certification and the signed DHS non-disclosure agreement, and some specification references are export controlled, so start that now.
“An Offeror that fails to meet any due date will be considered” 70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 4
Quotes go by email only, to two people, and must arrive by 12:00 p.m. Pacific on 21 Dec 2026. Under Federal Acquisition Regulation (FAR) 52.212-1(c), a quote that misses the due date is late, so send your emails early and phone to confirm receipt.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 12 of 16 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Tanks and voids: clean and inspect potable water tanks, voids, tanks, grey water and sewage holding tanks (Work Items 1 to 5).
- Doors, valves, ventilation, thermal oil heater, fire main loop, drains and fuel connections: overhaul, clean or repair (Work Items 6 to 13).
- Cranes: annual maintenance and repair of the forward crane, and corrective and annual maintenance of the aft knuckle boom crane (Work Items 14 and 15).
- Rescue doors, incinerator, davits and lifeboat: overhaul, inspect and test. Work Item 19 is a five year lifeboat and davit inspection in spec Rev 03 but reads Level 1 in the pricing sheet (Work Items 16 to 20).
- Sewage plants: open, inspect and repair the EVAC system, and open and inspect the FAST system, with OEM tech reps and contractor-supplied bacteria for FAST start-up (Work Items 21 and 22).
- Heated pilothouse window and heated 05 deck: renew the window with Government-furnished parts, and provide a fire prevention plan and fire watch (Work Items 23 to 25).
Who did it before
$1.09M
on the contract that likely holds this work now: Platypus Marine Inc. It ended Nov 24, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Package and questions due 14 Dec. The technical package request and your questions both close at 12:00 p.m. Pacific on 14 Dec 2026. The package requires a current Joint Certification Program (JCP) certification and the signed DHS non-disclosure agreement, and some specification references are export controlled, so start that now.
- Email only; strict deadline. Quotes go by email only, to two people, and must arrive by 12:00 p.m. Pacific on 21 Dec 2026. Under Federal Acquisition Regulation (FAR) 52.212-1(c), a quote that misses the due date is late, so send your emails early and phone to confirm receipt.
- Composite rate and markup are ceilings. The labor rate and markup you offer become the maximum rates for every change request for the whole contract, and the composite rate covers overhead, profit, consumables and support work such as fire watch and quality assurance with no extra pay. Change request proposals are due to the contracting officer within 72 hours of receipt, and you may not start that work without explicit approval.“The hourly composite rate and the mark-up percentage rate in the Pricing Sheet must be used as the maximum rates” 70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 26
- Only OEM technicians for key work. Five sole-source justifications say only the original equipment manufacturer (OEM) can provide the certified technical representatives for the cranes, sewage systems, incinerator and davits. Get written commitments from those OEMs before you quote, and check the Limitations on Subcontracting clause (FAR 52.219-14), since the percentage limit is not in the pages we could review.“Due to the nature of the equipment, only the OEM has access to the proprietary data needed to certify these systems for operation.” SAP_J&A_EVAC Final.pdf, page 1
- Insurance and E-Verify proof with quote. Your quote must include a statement of insurance coverage and proof of E-Verify enrollment, and the solicitation treats both as a matter of responsibility. The insurance clause requires at least $1 million per occurrence general liability and workers' compensation as state law requires, so confirm your policy meets that before you bid.“Proof of insurance (Statement of coverage from current insurance carrier)” 70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 25
- Base access list due 15 days early. You must give the base a list of everyone who will work on site, including subcontractors and suppliers, at least 15 calendar days before on-site work starts. The list needs date of birth and driver's license number and state, and everyone must carry photo ID that meets Real ID rules, or access may be denied.“no less than 15 calendar days before on-site work commences” 70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 9
Key terms
| Who can bid | Small businesses only (total small business set-aside)Size standard shown as 1300 employees. NAICS 336611.SAM.gov record |
|---|---|
| Contract period | Ordering until 09 Aug 2027; work about 19 Apr to 11 Jun 2027Contract award is anticipated on or before 19 Feb 2027.70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 3 |
| How they choose | Best value. Technical and past performance matter far more than price.Price for Task Order 1, the composite labor rate and the markup are also evaluated.70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 25 |
| How to submit | Email to Contracting Officer Amy A. Kelm and Contract Specialist Sherri OrePrice, technical and past performance go in separate emails, each 10MB or less.70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 4 |
| Questions due | 14 Dec 2026, 12:00 p.m. Pacific TimeEmail questions on Attachment 5, one question per form. Answers come by amendment.70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 4 |
| Contract type | Requirements contract with firm fixed price task ordersUp to 85% of the work is to be captured in Task Order 1. The government may add more work later.70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 3 |
| Site visit | Ship check encouraged; not stated as mandatoryNo mandatory visit appears in the pages we could review.70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdf, page 11 |
How to respond
- Before 12:00 p.m. Pacific on 14 Dec 2026, email questions on Attachment 5 (one per form) to Sherri Ore (Sherri.S.Ore@uscg.mil), copying Amy A. Kelm (Amy.A.Kelm@uscg.mil). Request the technical package in the same window, with your JCP number and the completed Attachment 7 non-disclosure agreement.
- Send the price email with a one-page cover letter (name, address, contact, unique entity ID, taxpayer ID, and confirmation of the period of performance), a signed SF 1449 (blocks 12, 17a, 30a to c), the completed Attachment 1 in Excel plus a signed PDF, and pricing Tabs 2 and 3.
- Send the technical email with a graphical planning document (Gantt-style) and a narrative of no more than 10 pages, and send the past performance email with an Attachment 4 form for each of one to three similar contracts.
- Include proof of E-Verify enrollment and proof of insurance. Email all parts to Contracting Officer Amy A. Kelm (Amy.A.Kelm@uscg.mil) and Contract Specialist Sherri Ore (Sherri.S.Ore@uscg.mil) by 12:00 p.m. Pacific on 21 Dec 2026, then phone Sherri Ore to confirm receipt.
Attached files
From SAM.gov. Download links open the original files.
- 70Z08526QLREP0026 Attachment 5 Request for Clarifications (1).docxQuestion form; you must complete one form per question and email it by the deadline. Read.
- 70Z08526QLREP0026 Attachment 3 Consolidated List of Reference.pdf Not read: over our length limit.
- 70Z08526QLREP0026 Attachment 9 Past Performance Questionnaire.docx Not read: over our length limit.
- SAP_JA_SH_Group Final 23NOV26.pdf Scanned image, not read.
- 70Z08526QLREP0026 Attachment 6 - Government Property Report (1).pdfGovernment property report that must be kept current and sent with your final invoice; you must complete it. Read.
- 70Z08526QLREP0026 STORIS DS FY27 Solicitation.pdfMain request for quotes with submission rules, clauses and evaluation terms; you must read and follow it. We could review only pages 1 to 17 and 22 to 31. Read in part (pages 1–17 and 22–31 of 31).
- 70Z08526QLREP0026 Attachment 7 Department of Homeland Security Non-Disclosure Agreement (NDA) (1).pdf Not read: over our length limit.
- 70Z08526QLREP0026 Attacment 2 Specifications Statement of Work.pdfSpecification for the 25 work items; you must read and follow it. We could review only pages 1 to 30 and 162 to 179. Read in part (pages 1–30 and 162–179 of 179).
- 70Z08526QLREP0026 Attachment 4 Past Performance Information Form (1).docxPast performance form for one to three similar contracts; you must complete one for each contract you cite. Read.
- 70Z08526QLREP0026 Attachment 1 Pricing Sheet 09NOV26.xlsxPrice sheet for Task Order 1 plus the composite labor rate and markup lines; you must fill it in and send it in Excel. Read.
- 70Z08526QLREP0026 Attachment 8 Change Request Proposal Form (1).xlsxChange request pricing form for added work; you complete it for each change request if you win the work. Read.
5 more files from a ZIP archive, 5 read
- SAP_J&A_Appleton FInal.pdfSole-source justification naming Appleton Marine as the only source for the forward and aft crane technical work; you read it, and the Coast Guard signed it. Read.
- SAP_J&A_EVAC Final.pdfSole-source justification naming Evac as the only source for the EVAC sewage system technical work; you read it, and the Coast Guard signed it. Read.
- SAP_J&A_MarineFAST Final.pdfSole-source justification naming Scienco/FAST as the only source for the FAST sewage system technical work; you read it, and the Coast Guard signed it. Read.
- SAP_J&A_TeamTec Final.pdfSole-source justification naming TeamTec as the only source for the incinerator technical work; you read it, and the Coast Guard signed it. Read.
- SAP_J&A_Vestdavit Final.pdfSole-source justification naming Vestdavit as the only source for davit technical work; it names model PLR-3600, while the specification's manual is for PAP-9000, so you should confirm the model. You read it; the Coast Guard signed it. Read.
Download the archive from SAM.gov.
Not stated in what we read
- Overall contract value: Not stated. The pricing sheet has no totals.
- Funding: the solicitation says funds are not presently available and no award is made until they are. When funds will be available is not stated, and the government may cancel the solicitation.
- Pages 18 to 21 of the solicitation and pages 31 to 161 of the specification were not provided. Solicitation page 22 lists '(k) Security clearance' with no detail, so whether a clearance is needed is not known.
- Attachments 3, 7 and 9, and the 23 Nov 2026 justification SAP_JA_SH_Group Final 23NOV26.pdf (a scanned image), could not be reviewed. You must read them yourself; Attachment 7 is the non-disclosure agreement needed for the technical package.
- Delivery dates for Government-furnished property: Not stated. The specification lists parts the government will furnish but not when.
- The subcontracting percentage limit under FAR 52.219-14, and calendar dates for critical inspection reports (due within the first 25% of the work period): Not stated.
Notice text
The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, for the dockside of the USCGC STORIS in accordance with this solicitation and attached specifications. 23NOV2026 - Added Justification and Approval document titled: SAP_JA_SH_Group Final 23NOV26.
As published on SAM.gov.
Contacts
- Amy A. Kelm, amy.a.kelm@uscg.mil, 5716071552
- Sherri Ore, sherri.s.ore@uscg.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at U.S. Coast Guard for the same kind of work (NAICS 336611, service code J999) in Washington that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| USCGC Terrapin DD FY2026 Pop: 9/15/2026 - 11/18/2026Platypus Marine Inc · 70Z08026CPBPL0032 | $1,087,552 | Nov 24, 2026ended | WA |
| To 20 2026 Healy Ipp Training and TravelGe Energy Power Conversion USA Inc. · 70Z08526FLREP0068 | $637,321 | Nov 30, 2026within a month | WA |
| To Add CRS 061, 062, 063, 064, 066, 068, 076, 077, 085, 086, 088, 090, 091, 092, 094 and 095 to Midgett FY26 DS Repairs. CR-64 Activate WI-39.Vigor Marine LLC · 70Z08526FLREP0136 | $580,378 | Dec 1, 2026within a month | WA |
| CGC Fir DS FY 26Lake Union Drydock Company · 70Z08526FIBCT0093 | $3,099,051 | Nov 11, 2026ended | WA |
| USCGC Swordfish & USCGC Osprey DD FY26Platypus Marine Inc · 70Z08026CPBPL0015 | $2,247,966 | Dec 9, 2026within a month | WA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 21, 12:00 PM PT26 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 336611, ship building and repairing, soonest deadline first.
- US Coast GuardAnchor windlass repair on USCGC Neah Bay, Cleveland, OH
- Department of the NavyPort boat davit OEM service at Sasebo, Japan
- Department of the NavyShip repair on USNS City of Bismarck, Busan, South Korea
- Department of the NavyShip repairs on USS Lewis B. Puller in Malaga, Spain
- Department of the ArmyArmy Watercraft Systems Roundtable
- Department of the NavyWatch supervisor chair parts for the Navy
- Department of the NavyPearl Harbor Naval Shipyard 2027 Technology Showcase
- Department of the NavyDive boat repair and preservation, Puget Sound, WA
Free · at most one email a morning
Get new notices from US Coast Guard by email
Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy