Drydock repairs for cutter Patoka, homeport Greenville, MS
The Coast Guard wants a contractor to drydock and repair the cutter USCGC PATOKA, including hull, shafting, rudder, tank and coating work.
Official title: DRYDOCK REPAIRS FOR THE CGC PATOKA
- Deadline
- Jan 4, 2027, 2:00 AM ET
- 40 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: CG-Sea-C22
What they're buying
It is an indefinite delivery contract for work planned from about 13 April to 22 June 2027, open only to small businesses.
Top catches
“Response deadline: 2027-01-04T02:00:00-05:00” SAM.gov record
The notice text says 2:00 pm Eastern on 4 January 2027, but the SAM.gov record says 2:00 AM. Aim to send before 2:00 AM Eastern on 4 January unless the contracting officer confirms 2:00 PM in writing.
“the Contractor shall not be required to make any deliveries under this contract after 18 May 2027.” 70ZU0227QIBCT0003 COMBINED SYNOPSIS CGC PATOKA.docx
The period runs to 22 June 2027, but the requirements clause says deliveries need not be made after 18 May 2027. Ask which date governs before you plan crews and materials.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 5 of 8 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Drydock, undock and block the tender and the barge, with pre-award dock calculations and an alternate blocking plan if you change the docking plan.
- Preserve 100 percent of the underwater body, freeboard hull plating, decks, rudders and spud wells, with coating quality control logs on forms QA-1 to QA-5.
- Ultrasonic testing and leak tests of hull plating, appendages and voids, with critical inspection reports due within the first 25 percent of the contract period for listed items.
- Overhaul propulsion shaft seals and renew inflatable seals, remove, inspect and reinstall shafts, propellers and rudder assemblies, and renew rudder stock housings.
- Renew piping insulation at the listed locations, and renew one 72 by 72 inch watertight hatch on the barge main deck, forward.
- Seal 10 deck covering areas totaling 1,200 square feet, shrink-wrap the boat davit winch and buoy crane, and install a compressed air line to the shaft seals tested to 150 psi.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Two different closing times. The notice text says 2:00 pm Eastern on 4 January 2027, but the SAM.gov record says 2:00 AM. Aim to send before 2:00 AM Eastern on 4 January unless the contracting officer confirms 2:00 PM in writing.
- Two different end dates. The period runs to 22 June 2027, but the requirements clause says deliveries need not be made after 18 May 2027. Ask which date governs before you plan crews and materials.
- Drawings need JCP certification. Some references are export controlled, and only JCP-certified vendors with a JCP number can get them. The last day to request drawings is 17 December 2026, so check your status now.“Only those vendors that are JCP certified and have a JCP number will be able to obtain drawings and references.” 70ZU0227QIBCT0003 COMBINED SYNOPSIS CGC PATOKA.docx
- Heavy package with strict page limit. The quote must include a narrative of no more than 10 pages, a schedule plan, three past contracts, proof of insurance, a subcontractor list and pre-award drydock calculations. Pages over the limit are removed unread, so write tightly.“Pages exceeding the limitations will be removed from the quote by the Contracting Officer and returned to the Quoters to ensure that they are not evaluated.” 70ZU0227QIBCT0003 COMBINED SYNOPSIS CGC PATOKA.docx
- Pricing sheet is blank and broken. Every line price on the pricing sheet is 0, and the composite labor rate line shows errors. Ask the Contracting Officer in writing for a corrected sheet before you price the job.“O-00A | Composite Labor Rate | #REF! | Hour | #VALUE!” Attachment 1 Pricing Sheet PATOKA (WLR 75E).xlsx
- Vessel size does not match. The notice calls the cutter a 225-foot buoy tender, but the specification describes a 75-foot class tender and a 130-foot barge. Confirm the vessel and dock sizes before you price the drydock work.“FY27 Drydock Availability 225’ Buoy Tender homeported in Greenville, MS” Notice text
Key terms
| Who can bid | Small businesses only (total small business set-aside)NAICS 336611, Ship Repair, small business size standard of 1,300 employees.70ZU0227QIBCT0003 COMBINED SYNOPSIS CGC PATOKA.docx |
|---|---|
| Contract period | About 13 April 2027 to 22 June 2027A later clause says you need not make any deliveries after 18 May 2027. See the second catch.70ZU0227QIBCT0003 COMBINED SYNOPSIS CGC PATOKA.docx |
| How they choose | Lowest evaluated price among acceptable quotesTechnical capability and past performance are pass or fail.70ZU0227QIBCT0003 COMBINED SYNOPSIS CGC PATOKA.docx |
| How to submit | Email to Jayne.gluck@uscg.mil and Sandra.a.martinez@uscg.milPrice, technical and past performance go in separate emails, each under 10 MB.Notice text |
| Questions due | 21 December 2026, 2:00 PM ESTSubmit each question on a separate Attachment 4 form. Amendment 0001 answers some questions.70ZU0227QIBCT0003 COMBINED SYNOPSIS CGC PATOKA.docx |
| Contract type | Indefinite delivery requirements contract with task ordersSubject to availability of funds. The Government orders work by task order, email or other means.70ZU0227QIBCT0003 COMBINED SYNOPSIS CGC PATOKA.docx |
How to respond
- Confirm the closing time in writing with both contacts, because the SAM.gov record says 2:00 AM and the notice says 2:00 PM Eastern on 4 January 2027.
- Email price, technical and past performance in separate emails to Jayne.gluck@uscg.mil and Sandra.a.martinez@uscg.mil, each under 10 MB.
- Complete Attachment 1 in full, sign the PDF, also send the spreadsheet, do not round prices, and keep your quote valid for 120 days.
- Include a copy of your fire safety plan with your bid, plus drydock certification, pre-award calculations, proof of insurance, a subcontractor list, and three past contracts on the Attachment 3 form, which we could not review, so read it yourself.
- Keep the technical narrative to 10 pages on 8.5 by 11 inch paper with 1-inch margins, number every page, and label each page USCGC PATOKA, Dry dock Repairs FY26, RFQ 70ZU0227QIBCT0003.
Attached files
From SAM.gov. Download links open the original files.
- 70ZU0227QIBCT0003 COMBINED SYNOPSIS CGC PATOKA.docxThe main solicitation with the deadline, contract terms and quote rules. Read it in full, because the copy we received stops partway through the clauses. Read in part.
- Attachment 4 Request for Clarifications PATOKA.docxA form for written questions, with one question per form and your firm's name on it. You fill it in only if you ask questions. Read.
- Attachment 3 - Past Performance Information Form.docx Could not be read.
- SF1449 CGC PATOKA COVER.pdf Scanned image, not read.
- Attachment 2 Work Specification PATOKA (WLR 75E).pdfThe work specification you must price and perform. Pages 1 to 29 and 251 to 272 were provided, so you must read pages 30 to 250 yourself. Read in part (pages 1–29 and 251–272 of 272).
- Attachment 1 Pricing Sheet PATOKA (WLR 75E).xlsxThe price form you must complete, with a signed PDF copy and a spreadsheet copy. The copy we received shows zeros and errors. Read.
- A00001 PATOKA.pdfAmendment 0001, dated 11/13/2026, which answers questions. You must read it, because it may change terms, and the question list it refers to was not included. Read.
- AMEND 001 ATTACHMENT.docx Could not be read.
Not stated in what we read
- Estimated value or total contract price: the pricing sheet has no totals and the notice gives no dollar figure.
- Amendment 0001 answers: the question list and the AMEND 001 attachment could not be reviewed, so any changes in them are unknown.
- Shipyard name and address: the SAM.gov place of performance is not stated, and the notice names only the contractor's facility.
- Insurance and bonding minimums: the text requires proof of insurance but gives no dollar amount.
- Which Government-furnished parts arrive: some items may be supplied by the vessel or the C4IT ServiceCenter, and others are only items the Government may provide.
- Unreviewed files: specification pages 30 to 250, the rest of the solicitation clauses, and the scanned SF1449 cover page could not be reviewed, so you must read them.
Notice text
DESCRIPTION OF WORK: The contractor to provide all necessary materials, equipment, personnel as necessary to perform Drydock repairs to the U.S. Coast Guard Cutter USCGC PATOKA (WLB 203) FY27 Drydock Availability 225’ Buoy Tender homeported in Greenville, MS, all in exact accordance with this solicitation and the attached specification. See Attachment 2. Your quotation must arrive no later than 04 January, 2027 at 2:00 pm Eastern Time; Quotations should be sent via electronic mail (e-mail) to Jayne.gluck@uscg.mil Contract Specialist and Sandra.a.martinez@uscg.mil. Contracting Officer.
As published on SAM.gov.
Contacts
- Sandra A. Martinez, Sandra.A.Martinez@uscg.mil, 5716071896
- Jayne Gluck, Jayne.Gluck@uscg.mil, 7576284658
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 4, 2027, 2:00 AM ET40 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 336611, ship building and repairing, soonest deadline first.
- US Coast GuardAnchor windlass repair on USCGC Neah Bay, Cleveland, OH
- Department of the NavyPort boat davit OEM service at Sasebo, Japan
- Department of the NavyShip repair on USNS City of Bismarck, Busan, South Korea
- Department of the NavyShip repairs on USS Lewis B. Puller in Malaga, Spain
- Department of the ArmyArmy Watercraft Systems Roundtable
- Department of the NavyWatch supervisor chair parts for the Navy
- Department of the NavyPearl Harbor Naval Shipyard 2027 Technology Showcase
- Department of the NavyDive boat repair and preservation, Puget Sound, WA
Free · at most one email a morning
Get new notices from US Coast Guard by email
Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy