- Opportunities
- Department of Defense
- Department of the Army
- W519TC-27-R-A014
Maintenance, supply, transport services at Fort Carson, CO
The Army wants a contractor to run maintenance, supply and transportation support at Fort Carson, CO, under an 8(a) set-aside, for a base year and four option years.
Official title: EAGLE Ft. Carson CO W519TC-27-R-A014
- Deadline
- Jan 4, 2027, 12:00 PM CT
- 40 days left
- Last time
- $124M
- Likely Akima Facilities Operations LLC
- Place
- CO
- Buyer: W6QK ACC-RI
What they're buying
Work covers equipment repair shops, ammunition and fuel supply, unit moves, rail operations, and fleet management of government vehicles.
Top catches
“Solicitation # W519TC-26-R-A055” B08 Att 0001 Performance Work Statement (PWS) Carson - 20AUG26.pdf, page 1
The SAM.gov record shows W519TC-27-R-A014, but the PWS and forms cite W519TC-26-R-A055. Confirm which solicitation governs before you price anything.
“8(a) Set-Aside (FAR 19.8)” SAM.gov record
The record marks this as an 8(a) set-aside under FAR 19.8. Confirm your firm qualifies before you spend time on a bid.
Read by AI (Claude Haiku) on Nov 18, 2026 from the notice and 13 of 19 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Maintenance: run equipment repair shops, do technical inspections, repairs, welding, body work, painting and tire work to Army technical manuals (PWS 5.1 to 5.7; Annex A).
- Supply: retail supply, stock readiness, repairable items, hazardous material control point, fuel operations and ammunition supply point work (PWS 5.19 to 5.22).
- Transportation: unit movements, cargo and freight, container yard, rail operations, and fleet management of government vehicles including scheduled maintenance (PWS 5.26 to 5.34; Annex C).
- Reports and plans: monthly hazardous material and waste reports, a contractor employee list, and a contingency plan. Surge staff are due within 10 days and full capability within 21 days of notice to proceed (PWS 1.3, 1.4; Annex D).
- Staffing: licensed and qualified staff, drug testing, background checks, and overtime only with written approval from the contracting officer in advance (PWS 1.3 and 1.4.1.4).
- Not in scope: maintenance, supply and transportation tasks now done by an Ability One contractor (PWS 1.2.1.1).
Who did it before
$124M
on the contract that likely holds this work now: Akima Facilities Operations LLC. It ends Nov 26, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Solicitation numbers do not match. The SAM.gov record shows W519TC-27-R-A014, but the PWS and forms cite W519TC-26-R-A055. Confirm which solicitation governs before you price anything.
- Check 8(a) eligibility first. The record marks this as an 8(a) set-aside under FAR 19.8. Confirm your firm qualifies before you spend time on a bid.
- No interim clearances for Secret work. Staff who need a SECRET clearance must have it before starting work, and failure to get one is not an excuse for non-performance. Price the risk of losing or delaying cleared staff.“The Government will not sponsor interim clearances.” B08 Att 0001 Performance Work Statement (PWS) Carson - 20AUG26.pdf, page 13
- Teaming totals must reconcile. Your teaming matrix labor and fee total must equal the cost price matrix subtotal, or the proposal is non-compliant. Do not add or delete rows, and the participation percentages must total 100%.“then per L.5.1.7(a), the Offeror's proposal will be non-compliant.” B08 Att 0005 Cost Price Matrix 26AUG2026.xlsx
- Wage determination file not reviewed. The DOL wage determination file (WD_2015-5417_Rev34) was not included, so it could not be reviewed. The PWS refers to Service Contract Act rates, so this file likely sets your labor pay floor; read it before you set labor rates.“or Service Contract Act (SCA) respectively or at the rate(s) proposed and accepted for SCA positions.” B08 Att 0001 Performance Work Statement (PWS) Carson - 20AUG26.pdf, page 15
- Some file types are blocked. The attached list blocks file types such as zip, xml, html and exe. Do not zip proposal files or use blocked types; check the full list before you upload.“*.zip” B08 Att 0010 Blocked File Extensions.pdf, page 1
Key terms
| Who can bid | 8(a) set-aside (FAR 19.8)The record marks this as an 8(a) set-aside. The cost forms also ask for a BOA holder and its subcontractors.SAM.gov record |
|---|---|
| Contract period | Base year plus four option years (OY1 to OY4)The length of the base year and each option year is not stated in the text provided.B08 Att 0005 Cost Price Matrix 26AUG2026.xlsx |
| Contract type | Cost-plus-fixed-fee for three divisions; firm-fixed-price for transition-in and PMO laborPer the cost price matrix. Other direct costs are priced as a separate line.B08 Att 0005 Cost Price Matrix 26AUG2026.xlsx |
How to respond
- Confirm the solicitation number on SAM.gov first. The record says W519TC-27-R-A014, but the attachments say W519TC-26-R-A055.
- Send any questions using the Industry Q&A template. Its columns are attachment number, company and POC name, question reference, RFP text and question. The question deadline is Not stated.
- Fill in the cost price matrix and teaming matrix. Where to send the proposal is Not stated in the text provided. Do not zip files or use blocked file types.
- For each subcontractor, collect a signed Letter of Consent and a Performance Questionnaire for the prime and each sub at 20% or more. The proposal is due Monday, 2027-01-04 at 12:00:00 (-06:00).
Attached files
From SAM.gov. Download links open the original files.
- B08 Att 0006 SF1408 Preaward Survey of Prospective Contractor Accounting System.pdf Not read: over our length limit.
- B08 Att 0030 Industry QandA Template.xlsxA blank template for questions to the government. Use it only if you have questions. Read.
- B08 Att 0011 Contract References Spreadsheet.xlsx Not read: over our length limit.
- B08 Att 0003 Performance Questionnaire.pdfA past performance form for the prime and each sub at 20% or more. You must complete it, and it covers any negative performance problems. Read.
- B08 Att 0005 Cost Price Matrix 26AUG2026.xlsxThe price sheet with labor, other direct cost and option lines. You must fill in the prices; the labor lines are blank. Read.
- B08 Att 0029 PWS Annex F - Publications and Forms.pdfA list of Army regulations and forms the contractor must follow. Read only. Read.
- B08 Att 0001 Performance Work Statement (PWS) Carson - 20AUG26.pdfThe performance work statement describing the tasks. Read it; pages 17 to 49 were not provided. No form to sign. Read in part (pages 1–16 and 50–60 of 60).
- B08 Att 0010 Blocked File Extensions.pdfA list of file types blocked from submission. Read it and avoid these types. Read.
- B08 Att 0007 DOL WD_2015-5417_Rev34.pdf Not read: over our length limit.
- B08 Att 0002 Staffing and Labor Mix 20260723.xlsx Not read: over our length limit.
- B08 Att 0024 PWS Annex A - Maintenance PRS.pdfPerformance standards for maintenance work, including timing and quality targets. Read only. Read.
- B08 Att 0025 PWS Annex B - Supply PRS.pdfSupply performance standards. The file is password protected and could not be opened, so you must read it yourself. Read.
- B08 Att 0015 Subcontractor Cost Information Submission.pdfA form a subcontractor fills in only if it sends its cost information directly to the government. Read.
- B08 Att 0027 PWS Annex D - Environmental Requirements.pdfEnvironmental duties such as hazardous waste, pesticide and spill rules, and reporting. Read only. Read.
- B08 Att 0028 PWS Annex E - Definitions Acronyms and Abbreviations.pdfA glossary of terms and acronyms used in the work. Read only as needed. Read.
- B08 -- W519TC-27-R-A014.pdf Not read: over our length limit.
- B08 Att 0026 PWS Annex C - Transportation PRS.pdfTransportation performance standards, including timing and accuracy targets. Read only. Read.
- B08 Att 0004 Letter of Consent.pdfA letter each subcontractor signs to allow the government to discuss its past performance with the prime. It names solicitation W519TC-26-R-A055. Read.
- B08 Att 0009 Purchasing and Invoicing Guide 18SEP26.pdf Not read: over our length limit.
Not stated in what we read
- Award basis, evaluation factors and past performance scoring rules are not in the text provided.
- Length of the base year and each option year, and the start date.
- Estimated value. The cost matrix totals may be your own template or a government estimate; the text does not say.
- Where and how to submit the proposal, and the question deadline.
- PWS pages 17 to 49 were not provided, so government furnished property and some supply services (sections 3 to 5.19.2) could not be reviewed.
- The staffing and labor mix file and the wage determination were not included, and Annex B is password protected. Read them on SAM.gov.
Notice text
Maintenance, Supply, and Transportation services in support of Ft. Carson, Coloardo.
As published on SAM.gov.
Contacts
- Taylor Beam, taylor.d.beam.civ@army.mil
- Chelsea Garrow, chelsea.j.garrow.civ@army.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Army for the same kind of work (NAICS 561210, service code J025) in Colorado that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Maintenance, Supply, and Transportation Services at Fort Carson, Co. This Award Include Clause 252.223-7999 in Accordance With EO14042.Akima Facilities Operations LLC · W52P1J22F0005 | $124,320,233 | Nov 26, 2026within a month | CO |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 4, 2027, 12:00 PM CT40 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 561210, facilities support services, soonest deadline first.
- National Aeronautics and Space AdministrationBrand-name valves and gas booster, Stennis Space Center, MS
- Department of the Air ForceFall arrest system inspections at Fairchild AFB, WA
- Department of the NavyParachute rigger support for Marine training, Yuma, AZ
- Department of the ArmyClothing issue support staff at Fort Belvoir, VA
- Department of the ArmyBase life support and repairs, Kampong Speu, Cambodia
- Department of Veterans AffairsEyewash and shower inspections at VA sites, Los Angeles, CA
- Department of Veterans AffairsHVAC upgrades at VA Loch Raven building, Baltimore, MD
- Department of the Air ForceRange cleaning at Seymour Johnson AFB, Goldsboro, NC
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy