500 kW rooftop solar for Building 56, San Joaquin, CA
You would design and install a 500 kW AC rooftop solar system on Building 56 at Defense Distribution San Joaquin, California, and modify the building's electrical system to connect it.
Official title: Electric Power Resiliency Building 56
- Deadline
- Dec 9, 1:00 PM ET
- 13 days left
- Who can bid
- Small businesses
- Size standard for NAICS 238210: $19 million in average annual receipts · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: DLA Distribution
What they're buying
Only small businesses may bid, and responses are due Wednesday, December 9, 2026 at 13:00:00-05:00.
Top catches
“Amendment 0001 is being issued to add Attachment 2, which is the Statement of Work.” Notice text
The Statement of Work (Attachment 2) was added by an amendment and re-uploaded after a faulty upload, and it was not included in the material provided here. Download it from SAM.gov and read it before you price the job, since it likely holds the detailed requirements.
“correct Block 8 from 12/07/2026 to 12/09/2026” Notice text
Amendment 0003 corrected the due date on the cover page from 12/07/2026 to 12/09/2026. Use 12/09/2026 at 13:00:00-05:00 and confirm it on SAM.gov, since older copies may show the earlier date.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system.
- Install a 500 kW AC roof-mounted solar photovoltaic system on Building 56.
- Meet or exceed all local, State and utility requirements, and pass the listing and qualification tests for the PV system hardware and services.
- Comply with California Building Codes and standards, the California Solar Initiative program, and CEC technical and installation specifications and guidelines.
- Connect to the existing substation: 12470/408V, 3000KVA transformer, with 4000A bus bar switchgear and four existing 1200A frame circuit breaker spaces available.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Statement of Work not reviewed. The Statement of Work (Attachment 2) was added by an amendment and re-uploaded after a faulty upload, and it was not included in the material provided here. Download it from SAM.gov and read it before you price the job, since it likely holds the detailed requirements.
- Deadline changed by amendment. Amendment 0003 corrected the due date on the cover page from 12/07/2026 to 12/09/2026. Use 12/09/2026 at 13:00:00-05:00 and confirm it on SAM.gov, since older copies may show the earlier date.
- Undefined document versions. You must follow the most recent version of each document, but the notice does not list those documents. Ask the contracting office which standards apply and include the cost of meeting them in your price.“All design and installation shall comply with the most recent version of each document.” Notice text
- Contractor owns the final design. You are responsible for the final PV design, based on roof conditions, roofing materials, and the components you select. Plan for design and engineering work and the risk that your design choices add cost.“The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor.” Notice text
Key terms
| Who can bid | Small businesses only (total small business set-aside)The size standard for NAICS 238210 is not stated in the provided text.SAM.gov record |
|---|---|
| Contract type | Commercial products or commercial services, combined synopsis/solicitation under part 12Notice text |
How to respond
- Download Attachment 2, the Statement of Work, from the SAM.gov notice. It was not included in the material provided here, so you must read it yourself.
- Confirm the response deadline of Wednesday, December 9, 2026 at 13:00:00-05:00 using Amendment 0003 and the SAM.gov record.
- Where to send your offer and in what format: Not stated in the notice text.
- Confirm that your company qualifies as small under NAICS 238210 before you bid, because this is a total small business set-aside.
Not stated in what we read
- Contract period or performance schedule.
- Estimated value or budget.
- How and where to submit the offer, and the required format.
- Basis for award, including whether price or other factors decide the award.
- Whether a site visit is required or offered.
- Deadline for written questions to the contracting office.
Notice text
Amendment 0003 is being issued to change the original SF1449 cover page to correct Block 8 from 12/07/2026 to 12/09/2026 as provided for in the rest of the solicitation. Amendment 0002 is being issued to correct faulty upload of Attachment 2.Amendment 0001 is being issued to add Attachment 2, which is the Statement of Work. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at the Defense Distribution San Joaquin California.
Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaic system for building 56. but not limited to: The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed the listing and qualification tests.
All design and installation shall comply with the most recent version of each document. The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor. The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required. The PV systems shall be consistent with and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines.
There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame size circuit breaker spaces are available.
As published on SAM.gov.
Contacts
- PAUL HOLBERT, paul.holbert@dla.mil, 6146935733
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 17, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 9, 1:00 PM ET13 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238210, electrical contractors and other wiring installation contractors, soonest deadline first.
- Department of Veterans AffairsElectrical equipment testing at Cleveland VA, OH
- Forest ServiceSolar battery replacement at Frenchman Work Center, CA
- Department of the Air ForceSwitchgear and cable upgrades at Bolling AFB, DC
- Department of the Air ForceElectrical system repairs for the U.S. Air Force
- Department of the ArmyGenerator power survey for disasters, Pittsburgh, PA
- Forest ServiceFiber optic conduit at Womble Work Center, Mount Ida, AR
- Department of Veterans AffairsProject No. 583-22-106- Replace Electrical Panels & Expand Distribution.
- Transportation Security AdministrationFiber Lease for Pittsburgh Inernational Airport - Notice of Intent to Sole Source
Free · at most one email a morning
Get new notices from Defense Logistics Agency by email
Each morning we'll send the new solicitations and sources-sought notices from Defense Logistics Agency, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy