Solar battery replacement at Frenchman Work Center, CA

Replace the failed lithium-ion battery bank in the off-grid solar system at the Frenchman Work Center near Chilcoot, California, and recycle the old batteries.

Official title: Forest Service - Solar Batteries Frenchman Work Center

Deadline
Nov 27, 4:00 PM PT
6 days left
Who can bid
Small businesses
Size standard for NAICS 238210: $19 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
CA
Buyer: USDA-FS, Csa Southwest 6

What they're buying

The work must finish within 30 calendar days after notice to proceed.

Top catches

Two different due dates
“The due date for receipt of quotes is hereby extended to Friday, November 27, 2026, at 16:00 (4:00 PM) local time.” C05 - Amendment A00002 - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 1

Amendment A00002 sets Friday, November 27, 2026 at 4:00 PM, but the SF 1442 still lists 11/20/2026 at 11:00 AM. Plan for the later date, since the question period closed on November 13, 2026.

Email only, no links
“Do not submit links to external drives or websites containing your documents; all files must be attached directly to your quote submission email.” C04 - Attachment 1 - Solicitation - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 15

Send the four required documents as separate PDF files attached directly to your email to the Contracting Officer. Acknowledge both amendments too, because failure to do so may render a quote non-responsive.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 18, 2026 from the notice and 9 of 10 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Disconnect and remove the 14 failed lithium-ion batteries, racking, control wiring and bus bar connections. Recycle them and give the government proof of recycling within 5 days.
  • Supply and install new batteries rated 2,100 Ah at 48V that fit the existing trailer. RFI 22 says the bank must be at least 100 kWh.
  • Make the batteries charge and discharge from 15°F to 100°F in an unheated trailer. The system must handle surge from a 230V air compressor motor (15 A full load amps).
  • Connect the batteries to the existing OutBack FM80 charge controllers, GS8048A inverters and MATE 3 controller. Provide off-site and on-site battery voltage and state-of-charge monitoring with no recurring fees.
  • Train Forest Service staff on monitoring, operation and maintenance. Deliver the single-line wiring diagram, battery product data, O&M manual, warranty papers and schedule.
  • Provide a 10-year manufacturer battery warranty from final acceptance. For one year, a certified technician must arrive on site within 24 hours for critical outages and within 72 hours for other defects.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Two different due dates. Amendment A00002 sets Friday, November 27, 2026 at 4:00 PM, but the SF 1442 still lists 11/20/2026 at 11:00 AM. Plan for the later date, since the question period closed on November 13, 2026.
  • Email only, no links. Send the four required documents as separate PDF files attached directly to your email to the Contracting Officer. Acknowledge both amendments too, because failure to do so may render a quote non-responsive.
  • Bond or deposit at $35,000. If your quote is $35,000 or more, you must provide a 100% payment bond on SF 25A or a 100% deposit after award, within the 10 calendar days the SF 1442 lists. The SF 1442 also marks an offer guarantee as required, which the RFI answers do not support, so price the bond or deposit cost into your quote.“for quotes of $35,000.00 or more.” C05 - Amendment A00002 - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 2
  • Battery must meet Buy American. The battery must comply with the Buy American requirements, and you must send country-of-origin documents for the exact battery and configuration you quote. The Discover Helios 'or equal' was rejected for lacking this proof.“documentation verifying the country of origin in accordance with the solicitation's Buy American clauses.” C05 - Amendment A00002 - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 3
  • Own generator; water not guaranteed. The station generator may not be used for daily work, so price your own portable generators, fuel and tool power. Government water and restrooms may be cut off without notice, and Attachment 7 says the contractor is responsible for water, electricity and restrooms, so price backup water and sanitation.“of these facilities is not guaranteed and may be suspended without advance notice.” C05 - Amendment A00002 - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 4
  • California C-10 licensed installer required. The installation must be completed by a properly licensed C-10 electrical contractor, which can be a subcontractor. Warranty service must also be done by a licensed electrical contractor or under one, with manufacturer-trained staff, so confirm licenses and training before you quote.“The installation is required to be completed by a properly licensed and qualified” C05 - Amendment A00002 - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 7

Key terms

Who can bidSmall businesses only (total small business set-aside)NAICS 238210; size standard $19 million.C04 - Attachment 1 - Solicitation - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 4
Contract period30 calendar days after notice to proceedWork must start within 10 calendar days of notice to proceed.C05 - Attachment 2 - Statement of Work - Updated Via A00002.pdf, page 3
How they chooseBest value, not necessarily lowest priceTechnical rating comes first. Price must be fair and reasonable, and past performance must be acceptable or neutral.C04 - Attachment 1 - Solicitation - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 14
How to submitEmail four separate attached PDF files to the Contracting OfficerSend to Tanya.Torres@usda.gov. Do not send links to file-sharing sites.C04 - Attachment 1 - Solicitation - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 15
Questions dueClosed: November 13, 2026, 11:00 AM PacificNo new questions can be asked now.C04 - Attachment 1 - Solicitation - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 10
Estimated valueBetween $25,000 and $100,000This is a project size range only. No contract price estimate is stated.Notice text
Contract typeFirm-fixed price, one awardThree lump-sum items (mobilization, battery removal and recycling, battery procurement and installation). You must price all three.C04 - Attachment 1 - Solicitation - 127EAW27Q0002 - Solar Batteries Frenchman Work Center.pdf, page 10
Site visitNo organized visit. You must inspect on your own.Self-visits are allowed with prior notice, but interior trailer access is not guaranteed (RFI 3).Notice text

How to respond

  1. Sign and return the acknowledgments for Amendment A00001 and Amendment A00002, using SF 30 or blocks 19 and 20a to 20c of the SF 1442.
  2. Prepare four separate PDF files: (1) the signed SF 1442 with amendment acknowledgments; (2) the Schedule of Items (Attachment 3) with unit prices and totals for all three items; (3) the technical approach (up to 5 pages), key personnel (up to 3 pages), performance schedule (up to 3 pages) and three past projects; (4) a bid guarantee only if required.
  3. Include your California C-10 subcontractor's license information with the quote, as RFI 9 requires.
  4. Email all four files as attachments, with no links, to Tanya.Torres@usda.gov before Friday, November 27, 2026 at 4:00 PM local time.

Attached files

Not stated in what we read

  • The exact estimated contract price. Only a project size range is given.
  • Award date and notice-to-proceed date. The RFI answers say only that the goal is to finish this calendar year before winter.
  • Plumas County electrician and other labor wage rates. Pages 9 to 58 of the Davis-Bacon wage determination were not provided, so you must read the full document.
  • Attachment 4 (Pictures) could not be reviewed because it is a scanned image. You must open it on SAM.gov, since it shows the trailer and equipment labels.
  • The limit on work you may subcontract under FAR 52.219-14, which the notice incorporates. The provided text does not state the percentage.
  • Whether pre-award site access will be approved and when. RFI 3 gives a COR email for access, but the solicitation bars contact with the COR except through the Contracting Officer.

Notice text

Date 11/17/2026 Amendment A00002 is posted. Contractors are required to acknowledge Amendment A00002. Please see the attachments for further information. --------------------------- Date 11/13/2026 Amendment A00001 is posted. Contractors are required to acknowledge Amendment A00001. Please see the attachments for further information. --------------------------- Solar Batteries Frenchman Work Center 127EAW27Q0002 Plumas National Forest This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAW27Q0002 is issued as a Request for Quotation (RFQ) for the Solar Batteries Frenchman Work Center project at Plumas National Forest, California. The goal of this project is to replace the existing batteries in the Frenchman Work Center Solar System and recycle the old batteries. The applicable North American Industry Classification Standard Code is 238210 - Electrical Contractors and Other Wiring Installation Contractors. The small business size standard is $19 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Disclosure of Magnitude of the Construction Project: Between $25,000 and $100,000 See all attachments for additional information. IMPORTANT NOTES: An organized site visit will not be held. In no event shall failure to inspect the site constitute grounds for a claim after award.

As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 18, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Forest Service by email

Each morning we'll send the new solicitations and sources-sought notices from Forest Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy