Electrical substation maintenance at Fort Buchanan, PR
The Army wants a small business to maintain and repair electrical substations and distribution systems at Fort Buchanan, Puerto Rico, under a firm fixed price contract.
Official title: Electrical Substation Maintenance and Repairs
- Deadline
- Nov 23, 10:00 AM ET
- 2 days left
- Who can bid
- Small businesses
- Size standard for NAICS 238210: $19 million in average annual receipts · Who qualifies
- Last time
- $289K
- Likely Lord Construction Group Inc
- Place
- Fort Buchanan, PR
- Buyer: W6QM MICC-Fort Buchanan (RC)
What they're buying
The request for quote is not expected until about 30 November 2026, yet responses are due 23 November 2026, so confirm what is due and when.
Top catches
“The RFQ will be issued on or about 30 November 2026.” Notice text
The notice says the RFQ will be issued around 30 November 2026, but responses are due 23 November 2026. Ask the contacts what you are expected to submit by 23 November and get the answer in writing.
“required to perform the services outlined in the PWS.” Notice text
The notice says the services are defined in the PWS, but no files are attached. Ask the contacts for the PWS before you price any work.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Annual preventive maintenance on electrical systems
- Electrical diagnostics
- Utility coordination with LUMA
- Vegetation control
- Unscheduled service response
- Corrective repairs using OEM or approved parts
Who did it before
$289K
on the contract that likely holds this work now: Lord Construction Group Inc. It ends Mar 25, 2027.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Deadline comes before the RFQ. The notice says the RFQ will be issued around 30 November 2026, but responses are due 23 November 2026. Ask the contacts what you are expected to submit by 23 November and get the answer in writing.
- Scope is in a PWS not attached. The notice says the services are defined in the PWS, but no files are attached. Ask the contacts for the PWS before you price any work.
- Check the $19 Million size limit. Only small businesses can bid, and the size standard for this code is $19 Million. Confirm that your company meets this limit before you spend time on a quote.“The size standard is $19 Million.” Notice text
- Very short turnaround. The notice was posted Friday afternoon, and responses are due Monday morning. Plan for a very short turnaround and contact the officers early if you need more time.“Posted: 2026-11-20 13:25:06” SAM.gov record
Key terms
| Who can bid | Small businesses only (100% set-aside)The set-aside is total small business. Check your size against the $19 Million standard.Notice text |
|---|---|
| How they choose | Competitive quotes; evaluation method not statedThis notice does not say how the winning quote will be chosen.Notice text |
| Contract type | Firm fixed priceThe price is fixed for the work, so you carry the cost risk.Notice text |
How to respond
- Ask Eileen Rivera or Felix Marrero whether anything is due by 10:00 AM (UTC-05:00) on 23 November 2026, since the RFQ is not expected until about 30 November.
- Ask for the PWS, which the notice says defines the services but is not attached.
- Watch for the RFQ on or about 30 November 2026 and read its submission instructions. The notice does not say how or where to send a quote.
- Confirm your size against the $19 Million standard for NAICS 238210 before you prepare a price.
Not stated in what we read
- Estimated value of the contract
- Contract period, including any option years
- How and where to submit a quote
- How the winning quote will be selected
- Whether a site visit is required
- The PWS content and the quantities of services and repairs
Notice text
THIS A PRE-SOLICITATION NOTICE. The Mission & Installation Contracting Command (MICC)-Fort Buchanan has a Request for Quote (RFQ) No. W912C327QA001 for Electrical Substation Maintenance and Repairs. A Firm Fixed Price contract will be awarded for this requirement. The RFQ will be issued on or about 30 November 2026. The RFQ will be issued as 100% set-aside small business on a competitive basis. All responsible sources are invited to submit a quote under this solicitation. The North American Industry Classification System (NAICS) code applicable to this requirement is 238210, Electrical Contractors and Other Wiring Installation Contractors. The size standard is $19 Million. MICC has a requirement for Electrical Substation Maintenance and Repairs, including all necessary administrative functions, personnel, materials, tools, equipment, services, transportation, and insurance required to perform the services outlined in the PWS. The requirement supports Fort Buchanan’s electrical distribution systems serving military and civilian personnel, tenant commands, schools, housing areas, and associated organizations across the installation. Work includes annual preventive maintenance, electrical diagnostics, utility coordination with LUMA, vegetation control, unscheduled service response, and corrective repairs using Original Equipment Manufacturer (OEM) or approved parts. For any request for information on this requirement contact Eileen Rivera at eileen.z.riveradomenech.civ@army.mil and/or Felix Marrero at Felix.r.marrero2.civ@army.mil.
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Eileen RIVERA DOMENECH, eileen.z.riveradomenech.civ@army.mil
- FELIX MARRERO, felix.r.marrero2.civ@army.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Army for the same kind of work (NAICS 238210, service code J061) in Puerto Rico that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Electrical Substation PM ServiceLord Construction Group Inc · W912C323P0008 | $288,585 | Mar 25, 2027in 4 months | PR |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 23, 10:00 AM ET2 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238210, electrical contractors and other wiring installation contractors, soonest deadline first.
- Department of the ArmyRelocate customer repeater system at Watervliet Arsenal, NY
- Department of Veterans AffairsAutomatic Transfer Switch (ATS) Preventive Maintenance and Repair Services, and Isolation Power Panel Inspection
- Defense Health Agency (DHA)Emergency wiring at Naval Medical Center Portsmouth, VA
- Department of Veterans AffairsBrooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction
- Department of Veterans AffairsProximity sensors for automatic doors, Fayetteville VA, NC
- Agricultural Research ServiceElectrical and data wiring for cubicles, Madison, WI
- Forest ServiceUSDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements
- Forest ServiceSolar battery replacement at Frenchman Work Center, CA
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy