Electrical and data wiring for cubicles, Madison, WI
USDA needs a licensed electrician to hardwire five cubicles and one hotel desk workstation into existing wall outlets at Madison, WI, including two outlets and two data ports per station, cleanup, and completion paperwork.
Official title: Electrical Installation of 5-Station Cubicle and One Single Hotel Desk Arrangement
- Deadline
- Nov 25, 1:00 PM CT
- 4 days left
- Who can bid
- Small businesses
- Size standard for NAICS 238210: $19 million in average annual receipts · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Madison, WI
- Buyer: USDA Ars Afm Apd
What they're buying
Only small businesses may quote, and the work must finish within 30 days after award.
Top catches
“Bids due date : 18-NOV-26 changed to 25-NOV-26” C05 Sol_1232SA27Q0021_Amd_0001.pdf, page 1
The due date changed from 18 November 2026 at 1700 CT to 25 November 2026 at 1300 CT. Plan your quote around the amended date and time only.
“Offeror must have experience with electrical and data wiring standards and be a licensed electrician.” C04 Sol_1232SA27Q0021.pdf, page 9
Your firm must be a licensed electrician, or use one, with experience in electrical and data wiring standards. The hardwiring must be done by a licensed electrician that you provide. Confirm the license and experience before you quote.
Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 4 of 4 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Hardwire five cubicle workstations and one hoteling workstation into existing wall outlets, using a licensed electrician.
- Two duplex electrical outlets per station, integrated into the cubicle spine or panel.
- Two RJ45 data ports per station with raceway and faceplates. Agency IT runs and connects the data cables.
- Run wires through the spine or corner sections of the cubicles.
- Remove packaging, debris and waste, and clean the site.
- Provide completion documentation, including a signed acceptance form, and fix any deficiencies at no added cost.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline moved by amendment. The due date changed from 18 November 2026 at 1700 CT to 25 November 2026 at 1300 CT. Plan your quote around the amended date and time only.
- Licensed electrician required. Your firm must be a licensed electrician, or use one, with experience in electrical and data wiring standards. The hardwiring must be done by a licensed electrician that you provide. Confirm the license and experience before you quote.
- Evaluation method conflicts. The amendment says lowest price technically acceptable, but it also says best value and lists price, a technically sound plan and a certified electrician factor under a clause it calls not applicable. Ask the contracting officer which method applies before you set your price.“Award will be made to the offeror representing the best value to the Government.” C05 Sol_1232SA27Q0021_Amd_0001.pdf, page 8
- No quote delivery method given. The notice gives an email address only for questions. It does not say where or how to send your quote. Ask the contracting officer for the delivery method and format well before 1300 CT on November 25.“Questions shall be submitted via email to shane.pope@usda.gov” C05 Sol_1232SA27Q0021_Amd_0001.pdf, page 11
- Wage determination sets labor cost. The Service Contract Act wage determination for this contract applies to the work. The notice lists $37.00 for electrician maintenance for information only. Read the wage determination on SAM.gov, since the copy here could not be read, and price labor to it.“Service Contract Act WD #: 2015-4897 apply to this solicitation” C05 Sol_1232SA27Q0021_Amd_0001.pdf, page 2
- DEI certification with penalties. Submitting an offer certifies that you comply with federal anti-discrimination laws, and a knowing false statement can bring False Claims Act liability. The amendment lists a different clause under the same number, so confirm with the contracting officer which certification applies before you submit.“By submission of its offer, the offeror certifies that:” C04 Sol_1232SA27Q0021.pdf, page 9
Key terms
| Who can bid | Small businesses only (total small business set-aside)NAICS 238210; size standard $19.0 million.Notice text |
|---|---|
| Contract period | Finish within 30 days after awardEarly completion is accepted. The notice does not mention option years.C05 Sol_1232SA27Q0021_Amd_0001.pdf, page 10 |
| How they choose | Lowest price technically acceptableThe amendment also uses best value language. See the catches.C05 Sol_1232SA27Q0021_Amd_0001.pdf, page 9 |
| Questions due | No later than 2 days before closing (likely November 23, 2026)Email shane.pope@usda.gov and put the solicitation name and number in the subject line.C05 Sol_1232SA27Q0021_Amd_0001.pdf, page 11 |
| Contract type | Firm fixed price purchase orderThe original request said task order. The amendment says purchase order.C05 Sol_1232SA27Q0021_Amd_0001.pdf, page 8 |
How to respond
- Ask the contracting officer how to deliver your quote, since the notice does not say. Email shane.pope@usda.gov no later than 2 days before closing, with solicitation number 1232SA27Q0021 in the subject line.
- Price line item 0001 for all of the work: the electrical installation for five cubicles and one hotel desk, including the electrical connection, licensed electrician, waste removal, cleanup, and completion documentation. The notice says quotes without pricing for all items may be excluded.
- Show a sound, compliant approach, your electrician's license and experience, and a detailed explanation of any requirement you cannot meet.
- Hold your prices firm for 90 calendar days after the closing date.
- Submit by 1300 CT on Wednesday, November 25, 2026. The notice does not state a submission method, so confirm it before then.
Attached files
- C04a SOW 1232SA27Q0021.pdfThe statement of work that defines the electrical work, outlets, data ports and cleanup. You must read it and price to it; you do not sign it. Read.
- C05 Sol_1232SA27Q0021_Amd_0001.pdfAmendment 0001, dated 11/20/2026, which changes the deadline, set-aside and evaluation terms and overrides earlier text. Block 28 is marked, so the contractor must sign and return the form. Read.
- C04b SCA WD 2015-4897_1232SA27Q0021.pdfThe Service Contract Act wage determination for Madison. The text in this copy could not be read, so you must review it on SAM.gov before pricing labor. Read.
- C04 Sol_1232SA27Q0021.pdfThe original request for quotation dated 11/04/2026. Its terms apply only where the amendment does not change them. Read it for certifications and clauses. Read.
Not stated in what we read
- Estimated value or budget for the work.
- How and where to deliver the quote, and in what format.
- Whether the earlier rule to price against a GSA schedule still applies after the change to an open market buy.
- Whether a site visit is required; clause 52.237-1 Site Visits is listed without a date.
- Whether the contract has any option years.
- The wage rates in the Madison wage determination, since the copy here could not be read.
Notice text
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1232SA27Q0021 is issued as a Request for Quotation (RFQ) for Cubicle Electrical Wiring and Data Wiring. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238210 The small business size standard is $19.0 million This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Shane Pope, shane.pope@usda.gov, 9708513735
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 21, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 25, 1:00 PM CT4 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238210, electrical contractors and other wiring installation contractors, soonest deadline first.
- Department of the ArmyElectrical substation maintenance at Fort Buchanan, PR
- Department of the ArmyRelocate customer repeater system at Watervliet Arsenal, NY
- Department of Veterans AffairsAutomatic Transfer Switch (ATS) Preventive Maintenance and Repair Services, and Isolation Power Panel Inspection
- Defense Health Agency (DHA)Emergency wiring at Naval Medical Center Portsmouth, VA
- Department of Veterans AffairsBrooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction
- Department of Veterans AffairsProximity sensors for automatic doors, Fayetteville VA, NC
- Forest ServiceUSDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements
- Forest ServiceSolar battery replacement at Frenchman Work Center, CA
Free · at most one email a morning
Get new notices from Agricultural Research Service by email
Each morning we'll send the new solicitations and sources-sought notices from Agricultural Research Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy