- Opportunities
- Department of Defense
- Department of the Army
- W912ES27SS0001
Electrical Upgrades to Support Future Three-Phase Power Supply Service at Lac qui Parle Dam near Watson, MN
Open, 3 days left
- Deadline
- Nov 19, 5:00 PM CT
- Notice type
- Sources Sought
- Set-aside
- None: open to all businesses
- Industry
- Power and Communication Line and Related Structures ConstructionNAICS 237130, Construction
- Place of performance
- Watson, MN
- Buying office
- W07V Endist St PaulOffice W912ES, Department of the Army
- Solicitation number
- W912ES27SS0001
- Product or service code
- Y1PZ
- Posted
- Nov 10, 2026
- Source
- SAM.govVersion 1, last change seen Nov 16, 2026, 4:30 AM UTC
Notice text
SOURCES SOUGHT NOTICE Electrical Upgrades to Support Future Three-Phase Power Supply Service - Lac qui Parle Dam near Watson, MN Notice ID: W912ES27SS0001 Issuing Office: U.S. Army Corps of Engineers (USACE) - St. Paul District Response Due Date and Time: 19 Nov 2026, 5:00pm (central time) 1.0 General Information Primary Point of Contact: Name: Justin Rose Title: Contract Specialist Email: justin.h.rose@usace.army.mil Secondary Point of Contact: Name: Sharon Frank-Scheierl Title: Contracting Officer Email: sharon.m.frank-scheierl@usace.army.mil NAICS Code: 237130, Power and Communication Line and Related Structures Construction Small Business Size Standard: $45 million Place of Performance: Lac qui Parle Dam, Watson, MN 56295. 2.0 Disclaimer This Sources Sought notice is issued in accordance with Revolutionary FAR Overhaul (RFO) Federal Acquisition Regulation (FAR) 15.201 for market research and planning purposes only and does not constitute a solicitation or a promise to issue a solicitation in the future. This notice does not commit the U.S. Government to contract for any supply or service whatsoever. The Government will not award a contract based on responses to this notice. The Government is not responsible for any costs incurred by respondents in the preparation of information for submission in response to this notice. All information received in response to this notice that is marked as proprietary will be handled accordingly. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. All responsible sources may submit a capability statement, which shall be considered by the agency. 3.0 Project Description & Background The USACE - St. Paul District is conducting market research to identify qualified sources capable of performing electric upgrades at Lac qui Parle Dam near Watson, MN. Anticipated Scope of Work: The anticipated work is intended to prepare the dam for future three-phase gate-actuator upgrades while maintaining operation of existing 120/240-volt, single-phase actuators. The construction contractor’s anticipated work includes furnishing all labor, tools, equipment, supervision, testing, and incidental work necessary to: Maintain/refeed the single phase 120/240-volt transformer located on the southeast side of the dam for lighting, gage house, and toilet area; Supply and install multiple utility poles (likely from the south heading north); Supply and install three (3) 480-volt transformers and metering equipment on final utility pole near dam; Connection from an existing 480-volt, three-phase source to a new service/distribution panel; Existing conduit and conductors will be demolished and cut (removal of demolished conduit will be completed by USACE); Existing single-phase feed to the dam will be disconnected by the contractor, the contractor may salvage the wire; Coordinate easements with the U.S. Army Corps of Engineers (and Lac qui Parle County for any work is off USACE property); Coordinate metering, transformers, power access, and other needs with USACE and MN Valley Light and Power (local utility service); Testing, grounding, submittals, and applicable state inspection; Potential for tree and brush removal. Objective: USACE is seeking market feedback on: The availability of qualified small businesses; Appropriate NAICS and size standard; Feasibility of a small-business set-aside; Likely construction duration, lead times, and site/utility coordination constraints. Schedule Flexibility: The Government anticipates coordinating the work with the serving utility. Any resulting solicitation will identify the anticipated period of performance, access procedures, outage coordination requirements, and site-visit information. Estimated Magnitude for Construction: The estimated magnitude of this project is between $30,000.00 and $70,000.00. The Government is seeking information to assess market capability, small-business interest, appropriate acquisition strategy, and potential schedule or utility-coordination concerns. 4.0 Information Requested from Interested Parties Interested firms are invited to submit a capability statement of no more than two (2) pages, not including attachments like letters of commitment. The Government is requesting only the minimum information necessary to determine capability, in accordance with RFO FAR 10.001. Your response must include the following information: Firm name, address, primary point of contact (name, title, phone, email); SAM UEI/CAGE and business-size/socioeconomic status under the selected NAICS; Please certify your firm's status for NAICS 237130: Small Business (SB), 8(a) Business Development, HUBZone, Service-Disabled Veteran-Owned Small Business (SDVOSB), Woman-Owned Small Business (WOSB), or Other than Small Business Confirmation of capacity to perform licensed electrical construction work in Minnesota; At least two (2) relevant projects, with a brief description and approximate value; Whether the firm can self-perform the principal electrical work; Interest in a site visit, if one is contemplated; Any material concerns with the anticipated scope, schedule, utility coordination, outage requirements, or permitting/inspection. Capability and Experience Capability Narrative: A brief narrative describing your firm's capabilities, special qualifications, certifications, and equipment relevant to performing the work described in Section 3.0 above. Relevant Project Experience: Provide at least two (2) examples of projects completed within the last five (5) years that are similar in size, scope, and complexity to this requirement. For each project, provide: * Project Title and Location * Contract Number and Type * Initial and Final Contract Value and Completion Dates Period of Performance * Role (Prime Contractor or Subcontractor) and percentage of work self-performed. * A brief narrative describing the project and how it relates to the scope of this notice. * A customer point of contact (Name, Title, Phone, Email). 5.0 Submission Instructions Responses are due no later than the date and time specified in this notice. Submit responses electronically to the Primary and Secondary Points of Contact. The email subject line shall read: "Sources Sought Response: Notice ID W912ES27SS0001 - [Your Company Name]" or similar. Marketing materials are not requested and will not be reviewed. Do not submit a proposal.
As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.
Contacts
- Justin Rose, JUSTIN.H.ROSE@USACE.ARMY.MIL, 6512905422
- Sharon M. Frank-Scheierl, Sharon.M.Frank-Scheierl@usace.army.mil, 6512900518
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 16, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Other open notices in power and communication line and related structures construction
| Notice | Set-aside | Place | Due |
|---|---|---|---|
| USFK C4I Communication Tower and Facility Maintenance CY27Department of the Army | Not stated | Not stated | Nov 18Due tomorrow |
| Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for InformationDepartment of the Air Force, sources sought | None | Kirtland AFB, NM | Nov 193 days left |
| 504-21-703 Training and Admin Support Space ConstructionDepartment of Veterans Affairs, presolicitation | SDVOSB | Amarillo, TX | Nov 215 days left |
| FCI Marion - Emergency Repair Tornado DamageFederal Prison System / Bureau of Prisons | Small business | Marion, IL | Dec 317 days left |
| DLA DWCF B1907 Backup Power Generator, Yokosuka, JapanDepartment of the Army, sources sought | Not stated | JPN | Dec 1125 days left |
| FTG247 Replace UPS at IDT1, Fort Greely, AlaskaDepartment of the Army, presolicitation | Small business | Fort Greely, AK | Dec 1226 days left |
| P210 Electric Power Plant and Electrical Distribution System at Chabelley Airfield, DjiboutiDepartment of the Navy, presolicitation | Not stated | DJI | Dec 1832 days left |
| Kautz Road Substation Construcion, Uip Subproject 2- KrsDepartment of Energy | None | Batavia, IL | Dec 1832 days left |
Get new notices from Department of the Army by email
Each morning we send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.