Upgrade and sustain VTC and A/V system, Hanscom AFB, MA
Upgrade and sustain the video conference and A/V system in Conference Room 203, Building 1624, Hanscom AFB, MA, including two new 98-inch displays.
Official title: ES BLDG 1624 RM 203 VTC & A/V Upgrade - FY27 RFQ
- Deadline
- Dec 4, 3:00 PM ET
- 8 days left
- Who can bid
- Small businesses
- Size standard for NAICS 238210: $19 million in average annual receipts · Who qualifies
- Last time
- $212K
- Likely Northern Electric Inc
- Place
- Hanscom AFB, MA
- Buyer: FA2835 AFLCMC Hanscom Pzi
What they're buying
The firm-fixed-price work runs one base year plus four option years, and quotes are due Friday, December 4, 2026.
Top catches
“Active bidders must email the Contracting Officer with their Company Name, CAGE Code, and Joint Certification Program (JCP) verification to receive a secure copy.” Combined Synopsis Solicitation-Room 203 VTC Upgrade_Signed.pdf, page 11
Attachment 9 (TEMPEST red/black guidance) is not on SAM.gov, and you need it to price the separation work. Email the contracting officer now with your company name, CAGE code and JCP verification, since the Q&A sets the request deadline at 3 business days before closing (likely Tuesday, December 1).
“DO NOT submit quotes through SAM.gov. Late quotations may not be considered.” Combined Synopsis Solicitation-Room 203 VTC Upgrade_Signed.pdf, page 3
Send your full quote by email to both the contract specialist and the contracting officer, using the subject line 2027-PZI-1710 - Quotation - [Company Name]. Do not upload quotes to SAM.gov, and late quotes may not be considered.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 8 of 12 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Replace the classified and unclassified VTC codec with a DISA-approved, no-radio unit that works with the existing system.
- Replace the classified camera with a two-port PTZ camera. The SOW suggests a QSC NC-20-60 or an equal business-class camera.
- Install two new 98-inch commercial displays on the existing GFE mounts, and two monitors at the operator desk.
- Replace the touch panels and rack UPS, update the logo and clock, and reconfigure or replace the AV cabinet with cables and power strips.
- Deliver signal flow diagrams (PDF and large format), wiring schematics, uncompiled Crestron code on disc, and training for at least two people.
- Sustain the system: two preventive maintenance visits a year, about 16 service hours a year, a 1-hour response to service calls on weekdays 0800 to 1800 ET, and a 1-year warranty on new equipment (option-year warranty priced separately per the Q&A).
Who did it before
$212K
on the contract that likely holds this work now: Northern Electric Inc. It ended Oct 16, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- TEMPEST guidance needs a separate request. Attachment 9 (TEMPEST red/black guidance) is not on SAM.gov, and you need it to price the separation work. Email the contracting officer now with your company name, CAGE code and JCP verification, since the Q&A sets the request deadline at 3 business days before closing (likely Tuesday, December 1).
- Quotes go by email, not SAM.gov. Send your full quote by email to both the contract specialist and the contracting officer, using the subject line 2027-PZI-1710 - Quotation - [Company Name]. Do not upload quotes to SAM.gov, and late quotes may not be considered.
- Questions closed; no extension expected. The question cut-off on November 24 and the November 20 site visit have passed, so you cannot ask new questions or attend. The Government does not expect to extend the due date, so plan to submit by Friday, December 4 at 3:00 PM ET.“The Government does not anticipate extending the proposal due date at this time.” Q A FINAL_v2.xlsx
- CUI requires an SPRS score on file. Attachment 9 and the site diagrams are controlled unclassified information, so DFARS 252.204-7012 applies. Before you bid, confirm you have a NIST SP 800-171 Basic Assessment score in SPRS, and check that any subcontractor does too.“must have an active NIST SP 800-171 Basic Assessment score recorded in SPRS.” Q A FINAL_v2.xlsx
- Wage determinations not reviewed. I could not review Attachments 10 and 11, the Davis-Bacon and Service Contract Act wage determinations. You must read both before you price labor: Davis-Bacon covers installation under CLIN 0001, and the service contract wages cover sustainment under CLIN 0002 and the options.“Service Contract Labor Standards (SCLS) (FAR 52.222-41) govern all ongoing preventative maintenance, sustainment, and troubleshooting work under CLIN 0002 and Option CLINs 1002–4002.” Q A FINAL_v2.xlsx
- Massachusetts licensed electrician required. Hardwired AC line-voltage changes must be done by a licensed Massachusetts Journeyman or Master Electrician. Confirm you have this license in house or through a licensed subcontractor, and price that work in.“Hardwired AC line-voltage modifications must be performed by a licensed MA Journeyman or Master Electrician.” Q A FINAL_v2.xlsx
Key terms
| Who can bid | Small businesses only (100% total set-aside)Small under NAICS 238210 (size standard $19.0 million). Active SAM.gov registration, CAGE code and UEI are required.Combined Synopsis Solicitation-Room 203 VTC Upgrade_Signed.pdf, page 11 |
|---|---|
| Contract period | 1 base year plus 4 option yearsEach period is 365 days, starts after award, and has no break in service. Five years in total.Combined Synopsis Solicitation-Room 203 VTC Upgrade_Signed.pdf, page 2 |
| How they choose | Lowest price technically acceptableTechnical is pass or fail. Past performance must be acceptable or neutral. Lowest evaluated total price wins.Combined Synopsis Solicitation-Room 203 VTC Upgrade_Signed.pdf, page 4 |
| How to submit | Email to both contacts, not through SAM.govSubject line: 2027-PZI-1710 - Quotation - [Company Name]. Send four volumes.Combined Synopsis Solicitation-Room 203 VTC Upgrade_Signed.pdf, page 3 |
| Questions due | Tuesday, November 24, 2026, 3:00 PM ET (closed)The question window has closed, so no new questions can be asked.Combined Synopsis Solicitation-Room 203 VTC Upgrade_Signed.pdf, page 3 |
| Contract type | Firm-fixed-pricePrice each CLIN as a firm lump sum. The bid schedule says prices include travel and FOB destination at Hanscom.Combined Synopsis Solicitation-Room 203 VTC Upgrade_Signed.pdf, page 1 |
| Site visit | Friday, November 20, 2026, 10:00 AM ET (passed)Voluntary. Registration was due Tuesday, November 17, 2026, 3:00 PM ET.Combined Synopsis Solicitation-Room 203 VTC Upgrade_Signed.pdf, page 2 |
How to respond
- Email contracting officer David Conquergood at david.conquergood.1@us.af.mil with your company name, CAGE code and JCP verification to request Attachment 9. The Q&A sets this request deadline at 3 business days before closing, likely Tuesday, December 1, 2026.
- Build your quote in four volumes: I Technical (narrative and cut sheets), II Past Performance (2 to 3 references from the last 3 years), III Price on Attachment 2 with firm-fixed-price entries to two decimal places, and IV Representations, Certifications, CAGE code and UEI.
- Email the complete quote to kamryn.anderson@us.af.mil and david.conquergood.1@us.af.mil by Friday, December 4, 2026, 3:00 PM ET, with subject line 2027-PZI-1710 - Quotation - [Company Name]. Do not submit through SAM.gov.
- Keep your SAM.gov registration active at submission and at award. Your quote must stay valid for at least 90 calendar days after the due date.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 3 Poly Studio X50 NR (No Radio) Setup Sheet.pdf Scanned image, not read.
- Attachment 11 Service Contract Act WD 2015-4047.pdf Not read: over our length limit.
- Attachment 7 Cisco TelePresence Precision Camera Technical Specs.png Could not be read.
- Q A FINAL_v2.xlsxGovernment answers to bidder questions that change several SOW points. Read it. Notice does not say whether it was posted as a formal amendment. Read.
- Attachment 5 Cisco Room Kit EQ PTZ 4K Installation Guide Webcam and Sound Bar.pdfPartly provided (pages 1-11 and 17-21 of 21). Reference installation guide that the Q&A calls baseline only. You could not review pages 12-16, so read the full file on SAM.gov. Read in part (pages 1–11 and 17–21 of 21).
- Attachment 2 Government Bid Schedule.pdfPricing form with six firm-fixed-price CLINs. You must fill it in and return it as Volume III of your quote. Read.
- Attachment 10 Davis Bacon Wage Determination - General Decision Number MA20260001 05-18-2026.pdf Not read: over our length limit.
- Combined Synopsis Solicitation-Room 203 VTC Upgrade_Signed.pdfThe main solicitation with dates, submission rules, evaluation, clauses and contacts. Read it closely, and complete the representations and certifications in your quote. Read.
- Attachment 8 Cybex KVM Switch Product Manual.pdfVertiv KVM switch manual. Reference only; read it, no form to sign. Read.
- Attachment 4 Cisco Collaboration Devices Audio Integration Setup Guide.pdfCisco guide for connecting external audio over USB. Reference only; read for context, no form to sign. Read.
- Attachment 1 Statement of Work v2 Project 2027.pdfStatement of work listing the required upgrades, current equipment and service rules. You price and deliver to this list. No form to sign. Read.
- Attachment 6 Installation guide for the PTZ 4K Camera.pdfInstallation guide for the Cisco PTZ 4K camera. Reference only per the Q&A; read it, no form to sign. Read.
Not stated in what we read
- Estimated contract value. The notice does not state it.
- Whether funds are available. The notice says funds are not presently available, and the Q&A expects funding and award within 30 to 45 days after closing.
- The content of Attachments 9, 10 and 11, including the wage rates. Attachment 9 requires a separate request and Attachments 10 and 11 were not reviewed.
- Whether the Q&A file was posted as a formal amendment on SAM.gov, which the notice says is how answers will be issued.
- What changed from the previous notice 2026-PZI-0023, which the notice mentions without detail.
- The current contractor and how the existing system is maintained.
Notice text
The Contractor shall furnish all equipment, materials, labor, installation, integration, programming, testing, documentation, training, preventive maintenance, technical support, repair and replacement support, and other services required to upgrade, modernize, and sustain the Video Teleconferencing (VTC) and Audiovisual (A/V) system in Conference Room 203, Building 1624, Hanscom AFB, MA. All work shall be performed in accordance with Attachment 1, Statement of Work. Site Visit Registration Due: Tuesday, November 17, 2026, 3:00 PM ET Site Visit Walkthrough: Friday, November 20, 2026, 10:00 AM ET Questions Due Cut-Off: Tuesday, November 24, 2026, 3:00 PM ET Quotation Due Date: Friday, December 4, 2026, 3:00 PM ET The previous Notice ID 2026-PZI-0023
As published on SAM.gov.
Contacts
- David Conquergood, david.conquergood.1@us.af.mil
- Kamryn Anderson, kamryn.anderson@us.af.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Air Force for the same kind of work (NAICS 238210, service code N059) in Massachusetts that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| This Procurement Is for the Structured Cabling and Install of Four Conference Rooms and Six Already Existing Video Teleconference (VTC) Kits, Along With All Their Ancillary Equipment in Building…Northern Electric Inc · FA283526P0030 | $212,400 | Oct 16, 2026ended | MA |
| The Objective Is to Implement a Fiber-to-the-Desk (FTTD) Solution to Provide Secure Network Connectivity to Support Current and Future Mission Activities.Demarc Telecom & Utility, LLC · FA283526P0019 | $231,646 | Aug 21, 2026ended | MA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 4, 3:00 PM ET8 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238210, electrical contractors and other wiring installation contractors, soonest deadline first.
- Department of Veterans AffairsElectrical equipment testing at Cleveland VA, OH
- Forest ServiceSolar battery replacement at Frenchman Work Center, CA
- Department of the Air ForceSwitchgear and cable upgrades at Bolling AFB, DC
- Department of the Air ForceElectrical system repairs for the U.S. Air Force
- Department of the ArmyGenerator power survey for disasters, Pittsburgh, PA
- Forest ServiceFiber optic conduit at Womble Work Center, Mount Ida, AR
- Department of Veterans AffairsProject No. 583-22-106- Replace Electrical Panels & Expand Distribution.
- Transportation Security AdministrationFiber Lease for Pittsburgh Inernational Airport - Notice of Intent to Sole Source
Free · at most one email a morning
Get new notices from Department of the Air Force by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy