- Opportunities
- Department of Energy
- 2026-PTG-FACPR
Fire alarm panel replacement at Berkeley Lab, CA
Lawrence Berkeley National Laboratory wants a design-build firm to design and replace the fire alarm control panels and backup batteries in Buildings 2, 26, 33 and 76 with Siemens Desigo equipment.
Official title: Fire Alarm Control Panel Replacement Project (FACPR)
- Deadline
- Jan 8, 2027, 5:00 PM PT
- 43 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- CA
- Buyer: Berkeley Natl Lab - DOE Contractor
What they're buying
The work runs from award through March 7, 2028, on an estimated value of about $700,000 to $1,400,000.
Top catches
“Proposals from firms that did not attend will not be evaluated.” _FACPR_RFP (11.12.26).pdf, page 9
Proposals from firms that did not attend are not evaluated. Send attendee names, emails and citizenship to Carlos Guerrero by end of business Monday, November 30, 2026.
“An EMR higher than 1.00 in any of the three years will result in an Unacceptable rating for this factor.” B_FACPR_RFP_Attachment B - Factor Resoponse (11.12.26).pdf, page 2
An EMR above 1.00 in any of the three years gives an Unacceptable rating on the safety factor. Check your three most recent EMR figures before you decide to bid.
Read by AI (Claude Haiku) on Nov 18, 2026 from the notice and 6 of 9 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Replace the fire alarm control panels in Buildings 2, 26, 33 and 76 with Siemens Desigo equipment. No substitutions are allowed.
- Replace the backup battery systems. Remove decommissioned cards, legacy assemblies and legacy lead-acid or gel-cell battery packs.
- Act as Engineer of Record. Produce PE-stamped 50, 75, 95 and 100 percent design packages, with battery sizing for 24 hours standby plus 15 minutes in alarm and voltage drop calculations.
- Install new conduit and conductors. Building 2 needs at least five new 2-inch RMC conduits. Building 26 needs three new 2-inch RMC pathways.
- Reconnect to the existing StarLink cabinets, the EMCS and lighting controls. Test and commission 100 percent of fire alarm field devices and sequences of operation.
- Coordinate each outage with the LBNL-provided fire watch. Cut over one building at a time with a 7-day buffer, then deliver PE-stamped as-built drawings.
Who supplied it lately
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Attendance at site visit is mandatory. Proposals from firms that did not attend are not evaluated. Send attendee names, emails and citizenship to Carlos Guerrero by end of business Monday, November 30, 2026.
- EMR must not exceed 1.00. An EMR above 1.00 in any of the three years gives an Unacceptable rating on the safety factor. Check your three most recent EMR figures before you decide to bid.
- Email format and subject line rules. Send the technical and price proposals as separate files, each clearly labeled, with the RFP number and document title in the email subject. LBNL may reject any proposal that is not properly delivered.“The submittal email must include the RFP number and document title in the subject line.” _FACPR_RFP (11.12.26).pdf, page 11
- Price must cover wages and after-hours work. Your fixed lump sum must include prevailing wages, after-hours and holiday work, NETA testing and bonds. The price form bars exclusions and conditions, and an offer that conditions its price may be found non-responsive.“Applicable prevailing wages (federal and California, whichever is higher)” C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdf, page 4
- Six-month notice makes schedule tight. Occupants must get six months of written notice before any cutover, and buildings are cut over one at a time. Check whether design, review and six-month notice can all fit before March 7, 2028.“Occupants must receive written notice at least six months before any cutover.” _FACPR_RFP (11.12.26).pdf, page 6
- California fire protection engineer must stamp. All fire alarm drawings need review, stamp and written approval from a California-licensed Fire Protection Engineer. Confirm you have a California PE and FPE for the design before you bid.“from a California-licensed Fire Protection Engineer (FPE) remain mandatory prior to submittal.” A_Statement of Work for Subcontract 7889840 (10.12.26).pdf, page 13
Key terms
| Who can bid | Open to all responsible firms. Not set aside for small business.Small businesses may compete directly or as lower-tier subcontractors. You must hold an active California contractor license and attend the mandatory site visit._FACPR_RFP (11.12.26).pdf, page 5 |
|---|---|
| Contract period | From subcontract award through March 7, 2028Planned award is Friday, February 12, 2027. Your bid must give durations for design and construction._FACPR_RFP (11.12.26).pdf, page 5 |
| How they choose | Best value, not lowest priceTechnical factors together are more important than price. Price is evaluated for realism and completeness, not weighted._FACPR_RFP (11.12.26).pdf, page 12 |
| How to submit | Email to Peter Gajda at ptgajda@lbl.gov, or a file transfer site such as DropboxSend the technical and price proposals as separate files, labeled as such._FACPR_RFP (11.12.26).pdf, page 11 |
| Questions due | Thursday, December 10, 2026, 5:00 PM Pacific TimeQuestions go by email to the Procurement Representative only. Answers go to all offerors without names._FACPR_RFP (11.12.26).pdf, page 9 |
| Estimated value | About $700,000 to $1,400,000This is a planning figure only. It is not a floor, a ceiling, or a commitment._FACPR_RFP (11.12.26).pdf, page 5 |
| Contract type | Firm-fixed-price design-build subcontract with separate line itemsPrices are fixed for each building's design and construction. Separate lines are also needed for Siemens equipment._FACPR_RFP (11.12.26).pdf, page 6 |
| Site visit | Mandatory, Thursday, December 3, 2026, 9:30 AM to 11:30 AM Pacific TimeRegister attendees with Carlos Guerrero by end of business Monday, November 30, 2026. Bring a hard hat, safety glasses, hi-vis vest and hard-toed footwear._FACPR_RFP (11.12.26).pdf, page 9 |
How to respond
- Email Carlos Guerrero (cguerrero@lbl.gov) by end of business Monday, November 30, 2026 with attendee names, emails and citizenship. Attend the mandatory conference and site inspection on Thursday, December 3, 2026 at 9:30 AM Pacific Time, meeting at Building 33.
- Send any questions by email to Peter Gajda (ptgajda@lbl.gov) by 5:00 PM Pacific Time on Thursday, December 10, 2026. Do not contact other lab staff about the project.
- Prepare a Technical Proposal of no more than 20 pages, plus a separate Price Proposal using Attachment C with every blank cell filled in. Include Factor 1 to Factor 4 responses, the cover page and the proposed schedule.
- Email both files to Peter Gajda at ptgajda@lbl.gov, or send them through a file transfer site such as Dropbox. Put the RFP number and document title in the subject line. The deadline is 5:00 PM Pacific Time on Friday, January 8, 2027.
Attached files
From SAM.gov. Download links open the original files.
- C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdfThe price form. You must fill in every blank, list lower-tier subcontractors, sign it, and submit it as your Price Proposal. Read.
- F_Insurance Certificate Instructions (10.09.26).pdfRules for insurance certificates and endorsements. You submit these before site work starts, and you should read them now to check your coverage. Read.
- _FACPR_RFP (11.12.26).pdfThe main solicitation. Read it in full, because it sets the proposal rules, the schedule and the evaluation method. Read.
- E_GPs for Fixed Price Design-Build (10.9.26).pdfGeneral provisions of the subcontract, reviewed for pages 1 to 4 and 6 to 9 only. Page 5 was not provided. You must read these terms because the offer includes accepting them. Read in part (pages 1–4 and 6–9 of 9).
- D_Subcontract_FACRP (11.12.26).pdf Not read: over our length limit.
- G_Representations and Certifications Form.pdf Not read: over our length limit.
- A_Statement of Work for Subcontract 7889840 (10.12.26).pdfThe statement of work with technical scope, design and construction rules, and outage requirements. Read it. You do not sign it. Read.
- B_FACPR_RFP_Attachment B - Factor Resoponse (11.12.26).pdfThe factor response form for the technical volume. You must answer every factor and include the requested documents. Read.
- H_Small Business Subcontracting Plan (9.29.26).pdf Not read: over our length limit.
Not stated in what we read
- The notice to proceed date is not stated, so the schedule cannot be checked against the March 7, 2028 end date.
- The sample subcontract (D_Subcontract_FACRP+(11.12.26).pdf) was left out for length and could not be reviewed. You must read it on SAM.gov.
- The Representations and Certifications form and the Small Business Subcontracting Plan were left out for length and could not be reviewed. You must read them on SAM.gov.
- The prevailing wage rates in General Wage Decision CA20260018 Mod 8 are not in the text provided. You must read the decision to price labor.
- The 2024 conceptual design report and the fire alarm as-builts are offered through a Google Drive link in the RFP. They were not reviewed here.
- How long each building's fire alarm outage will last is not stated. The RFP asks you to propose these durations.
Notice text
The University of California, Lawrence Berkeley National Laboratory requests proposals for design-build services for the design and construction of the Fire Alarm Control Panel Replacement Project ("FACPR" or "the Project"). The Project covers Buildings 2, 26, 33, and 76. Under this subcontract, the Design-Build Subcontractor will provide all professional design, engineering, procurement, installation, changeover, and commissioning services needed to replace the fire alarm control panels and backup battery systems.
The Siemens Desigo system has been selected as LBNL's campus-standard fire alarm platform for this Project, no substitutions will be considered. Using one common platform supports compatibility with the existing mix of field devices, loops, and conventional circuits, and simplifies maintenance, training, and future parts availability across the site. The existing fire alarm wiring in the four buildings will generally remain in place. This Project replaces the central control equipment, not the complete building fire alarm systems.
Fire alarm annunciation and notification devices and the StarLink cabinets themselves are not being replaced under this Project; StarLink cabinets will be relocated only as needed to follow the panels.
As published on SAM.gov.
Contacts
- Peter Gajda, ptgajda@lbl.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 8, 2027, 5:00 PM PT43 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238210, electrical contractors and other wiring installation contractors, soonest deadline first.
- Department of Veterans AffairsElectrical equipment testing at Cleveland VA, OH
- Forest ServiceSolar battery replacement at Frenchman Work Center, CA
- Department of the Air ForceSwitchgear and cable upgrades at Bolling AFB, DC
- Department of the Air ForceElectrical system repairs for the U.S. Air Force
- Department of the ArmyGenerator power survey for disasters, Pittsburgh, PA
- Forest ServiceFiber optic conduit at Womble Work Center, Mount Ida, AR
- Department of Veterans AffairsProject No. 583-22-106- Replace Electrical Panels & Expand Distribution.
- Transportation Security AdministrationFiber Lease for Pittsburgh Inernational Airport - Notice of Intent to Sole Source
Free · at most one email a morning
Get new notices from Department of Energy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy