Campground demolition at Tonto National Forest, AZ

Remove buildings, toilets, entry stations, fish cleaning stations, septic systems and about 24,000 square yards of asphalt at eight campgrounds in the Tonto Basin and Globe ranger districts, and haul debris off Forest land.

Official title: Forest Wide Decommissioning Project

Due Dec 7, 1:00 PM CT · Small business · Roosevelt, AZ

What they're buying

Work must finish within 150 days after notice to proceed, and Jones Water is an option item.

Top catches

Questions due tomorrow
“are due no later than November 20th, 2026, at 1:00 PM Central Standard Time” C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf, page 9

Questions must reach the contracting officer by 1:00 PM Central Standard Time on November 20, 2026, the day after today. The amendment did not move this date, so send any scope questions now.

Price every line, option included
“contractors must submit pricing for all items on Attachment 2 – Schedule of Items.” C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf, page 9

The government will award one contract and says your offer must price all items, including the Jones Water option. Missing prices lead to exclusion, so fill in every unit price and total in the Schedule of Items.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 6 of 10 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Demolish flush and vault toilets, entry stations, and fish cleaning stations, and return the ramadas to the Forest Service.
  • Pump and remove septic tanks and vault waste at a licensed facility, and cap water, sewer and power lines.
  • Pulverize asphalt to 12 inches in place at Schoolhouse, Windy Hill and Indian Point (9,000, 10,000 and 5,000 square yards).
  • Remove concrete pads, sidewalks, curbs, wheel stops, and metal and concrete rubble, and recycle or dispose of them outside Forest land.
  • Backfill voids with compacted fill to natural grade. The contractor must supply the water for compaction.
  • Jones Water option: remove vault toilets, culverts, retaining walls, signposts, picnic tables, billboard, and barricades.

Who did it before

$107K

on the contract that likely holds this work now: Rodgers, Steven R. It ends Mar 31, 2027.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • Questions due tomorrow. Questions must reach the contracting officer by 1:00 PM Central Standard Time on November 20, 2026, the day after today. The amendment did not move this date, so send any scope questions now.
  • Price every line, option included. The government will award one contract and says your offer must price all items, including the Jones Water option. Missing prices lead to exclusion, so fill in every unit price and total in the Schedule of Items.
  • Asbestos license state conflicts. The specifications require a New Mexico asbestos license in one place and an Arizona license in another. Ask the contracting officer which state applies, and confirm you or your abatement subcontractor can hold that license before you price asbestos work.“The contractor (or subcontractor) shall be licensed by the state of New Mexico as an Asbestos Abatement Contractor.” C04_Attachment 3 - Specifications.pdf, page 16
  • Asphalt removed or left in place. The notice says asphalt pavement is removed and disposed outside the Forest, but the Statement of Work says it is pulverized and left in place. These methods price very differently, so ask which applies before you price the 24,000 square yards.“Pulverized material is to remain in-place.” C04_Attachment 1 - Statement of Work.pdf, page 5
  • Bonds due after award. Performance and payment bonds are required and must be furnished within 10 calendar days after award, and the form appears to require an offer guarantee too. No bond or guarantee amount is stated, so talk to your surety before you commit to a price.“THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?” C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf, page 1
  • Fish station counts disagree. The Statement of Work and Specifications count six fish cleaning stations, but the Schedule of Items lists five, with Burnt Corral at one instead of two. Several Schedule units also look wrong, so ask the contracting officer to confirm counts and units before you price.“Cholla will require the removal of two existing fish cleaning stations.” C04_Attachment 1 - Statement of Work.pdf, page 9

Key terms

Who can bidSmall businesses only (total small business set-aside)The size standard for NAICS 238910 is not stated in the notice.SAM.gov record
Contract period150 calendar days after notice to proceedAmendment 0001 also sets fixed dates of December 14, 2026 to December 13, 2027.C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf, page 9
How they chooseHighest technically rated offer at a fair price, not the lowest pricePast performance must be acceptable or neutral, and the government says tradeoffs will not be conducted.C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf, page 13
How to submitEmail three separate PDFs to troy.mccullough@usda.govThe three PDFs are the SF 1442 offer, the price proposal, and the technical proposal.C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf, page 9
Questions dueFriday, November 20, 2026, 1:00 PM Central Standard TimeEmail troy.mccullough@usda.gov with the solicitation name and number as the subject line. The amendment did not change this date.C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf, page 9
Contract typeFirm-fixed price commercial construction contractDavis-Bacon wage rules apply, but the wage determination could not be read.Sol_127EAX27Q0013_Amd_0001.pdf, page 1
Site visitNovember 16, 2026, 10:00 am local time (this date has passed)Contact Kossigan Apedjinou at (480) 973-0553. The notice does not say whether the visit was mandatory.C04_127EAX27Q0013 - Forest Wide Campground Decommissioning.pdf, page 9

How to respond

  1. Email any questions to troy.mccullough@usda.gov by 1:00 PM Central Standard Time on November 20, 2026, with the solicitation name and number as the subject line.
  2. Prepare three separate PDFs: the signed SF 1442 offer with Amendment 0001 acknowledged in block 19, a filled-in price proposal covering every base and option line, and a technical proposal with past performance.
  3. Keep the technical proposal within the page limits: work plan up to 10 pages, key personnel up to 3 pages, and performance schedule up to 6 pages. List three similar projects from the last three years.
  4. Email all three PDFs to troy.mccullough@usda.gov by Monday, December 7, 2026, 1:00 PM Central Time.
  5. Not stated: the email subject line for the offer and the bid guarantee amount.

Attached files

Not stated in what we read

  • Wage rates: Attachments 4, 5, 7 and 8 (directional maps, Google Earth maps, Schoolhouse drawing and the wage determination) could not be reviewed because they are scanned. You must read them yourself, including the Davis-Bacon wage determination.
  • Estimated contract value; the Schedule of Items has no prices or totals.
  • Bid guarantee amount, and whether one is required, since the checkbox on the form is unclear.
  • Whether the November 16, 2026 site visit was mandatory and whether another site visit will be offered.
  • Which state's asbestos abatement license governs the work, Arizona or New Mexico.
  • The size standard for NAICS 238910 and any liquidated damages for late completion.

Notice text

AMENDMENT 0001 - Extends Offer Due Date to December 7th, 2026 @1300 Central Time The Tonto National Forest is looking to achieve a more sustainable recreation program. Through this project, several recreation areas will be decommissioned in the Tonto Basin Ranger District (RD), and Globe RD. The decommission of campgrounds at the Tonto Bassin RD is the base bid and at Globe RD, it is an option bid. The intent of this work is to remove and safely dispose outside of the National Forest boundaries, recreational accommodations that include but not limited to Entry station buildings, toilets buildings, sidewalks, asphalt pavement, fish cleaning stations, septic system, and parking lots.

As published on SAM.gov. Attachments are listed there; FedLook does not read them yet.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at Forest Service for the same kind of work (NAICS 238910, service code P500) in Arizona that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Forest Service by email

Each morning we'll send the new solicitations and sources-sought notices from Forest Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy