- Opportunities
- Department of Veterans Affairs
- 36C26127Q0047
Flooring and wall base replacement at McClellan, CA
The VA wants a contractor to replace flooring, stair treads and wall base in three McClellan Park buildings (98, 209 and 949), about 43,008 SF of flooring, with asbestos abatement in Building 209.
Official title: FY27 NRM Replace Flooring in McClellan VA Northern California Health Care System McClellan CA Project 612A4 27 020
- Deadline
- Dec 8, 3:00 PM PT
- 12 days left
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Mcclellan, CA
- Buyer: 261-Network Contract Office 21 (36C261)
What they're buying
It is a firm-fixed-price, SDVOSB-only set-aside, and Amendment 0003 sets the period of performance at 300 calendar days from notice to proceed.
Top catches
“HOUR & DATE for Receipt of Offers is EXTENDED to: 12-08-2026 3:00PM PST” 36C26127Q0047 Amendment 0003.pdf, page 1
Amendment 0003 sets the quote due date to Tuesday, December 8, 2026, at 3:00 PM PT. The SF 1442 date of November 17 and the December 2 date in Amendment 0002 no longer apply, so plan around the latest date.
“Quoters must be verified in SBA Small Business Search the time submission offer and prior to award.” 36C26127Q0047_Sol.pdf, page 1
Only verified service-disabled veteran-owned small businesses can quote. Check your SBA Small Business Search listing now and again before award, because verification is required at quote time and before award.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 13 of 30 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Remove and legally dispose of existing flooring, stair treads and wall base in Buildings 98, 209 and 949. Quantities are estimates: about 43,008 SF flooring, 750 SF stair treads and 9,610 LF wall base.
- Test and abate asbestos in Building 209 using certified inspectors and a C-22 licensed abatement subcontractor, with an asbestos work plan.
- Install new carpet tile, luxury vinyl tile, resilient stair treads and rubber wall base. Default base is RB-1, and exam rooms and offices use RB-2 per the updated drawings.
- Remove and replace subfloors, carpet tack strips, carpet padding and vinyl or rubber adhesive as needed.
- Move and store VA furniture with a professional moving company, and provide up to 10 Conex containers placed in the Building 911 parking lot.
- Schedule Building 98 work on weekends, phased by area, and do all other work in normal hours of 7:30 AM to 4:00 PM PT, Monday to Friday, unless the COR and CO approve after-hours work in writing.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Quote due date moved several times. Amendment 0003 sets the quote due date to Tuesday, December 8, 2026, at 3:00 PM PT. The SF 1442 date of November 17 and the December 2 date in Amendment 0002 no longer apply, so plan around the latest date.
- Verify SDVOSB status before quoting. Only verified service-disabled veteran-owned small businesses can quote. Check your SBA Small Business Search listing now and again before award, because verification is required at quote time and before award.
- Cap on work to non-similar subs. Under the amended limitations on subcontracting clause, you may not pay more than 85 percent of the amount paid by the Government, excluding materials, to subcontractors that are not similarly situated. Confirm which subcontractors count as similarly situated before you set your subcontract plan and price.“it will not pay more than 85 percent of the amount paid by the Government for contract performance” 36C26127Q0047 Amendment 0003.pdf, page 4
- Bid bond now, bonds after award. A bid bond must be included with your quote before the deadline. Performance and payment bonds are due within 10 calendar days after award, so talk to your surety now.“A bid guarantee in the form of a bid bond must be submitted with your Quote before the deadline.” Notice text
- Contract length changed to 300 days. Amendment 0003 overrides the 160-day period in the notice text and SF 1442. Price your labor, equipment and overhead for 300 calendar days from notice to proceed.“Updates the Period of Performance on Page 1, of SF 1442 item F. of the Solicitation to 300 calendar days from” 36C26127Q0047 Amendment 0003.pdf, page 1
- Asbestos work in Building 209. Building 209 contains asbestos, and the 1996 and 2017 reports are scanned images that could not be reviewed here. Read those reports on SAM.gov and price testing and abatement from them before you quote.“ACM has been reported to exist in Building 209.” Updated SOW Replace Flooring in McCellan_20261105_.pdf, page 2
Key terms
| Who can bid | Service-disabled veteran-owned small businesses only (total set-aside)Quoters must be verified in SBA Small Business Search at quote time and before award.Notice text |
|---|---|
| Contract period | 300 calendar days from notice to proceed (NTP)Amendment 0003 changed this from 160 days. The notice text and SF 1442 still say 160 days.36C26127Q0047 Amendment 0003.pdf, page 1 |
| How they choose | Price onlyOne contract goes to the responsible quoter whose conforming quote is most advantageous on price.Notice text |
| How to submit | Email your quote to Mr. Rosario Chaidez at Rosario.chaidez1@va.govInclude a bid bond with the quote. Number of copies: Not stated.36C26127Q0047_Sol.pdf, page 1 |
| Questions due | Closed: November 3, 2026, 12:00 PM PTThe RFI window has passed. Answers to RFIs are in a file you must review on SAM.gov.Notice text |
| Estimated value | Between $1 million and $2 million (magnitude of construction)This is a range for the magnitude of construction, not a stated estimate.36C26127Q0047_Sol.pdf, page 1 |
| Contract type | Firm-fixed-price constructionPrice is fixed for the work described in the solicitation.Notice text |
| Site visit | Held October 23, 2026, 10:00 AM PT; not mandatoryThe visit has passed. The sign-in roster was posted as Amendment 0001.36C26127Q0047_Sol.pdf, page 1 |
How to respond
- Email your quote to Mr. Rosario Chaidez at Rosario.chaidez1@va.gov so it arrives by 3:00 PM PT on Tuesday, December 8, 2026. Number of copies: Not stated.
- Include a bid guarantee in the form of a bid bond with your quote.
- Complete and submit VAAR 852.219-75 (Deviation Oct 2026) from Amendment 0003 with your quote.
- Complete the SF 1442 offer section, including the amendment acknowledgment for Amendments 0001 through 0003, and sign it. Whether the Price Breakdown Worksheet must be submitted: Not stated.
- Confirm your SBA Small Business Search verification is current before you send the quote and again before award.
Attached files
From SAM.gov. Download links open the original files.
- 98_209_949 FLOORING SF.xlsx Not read: over our length limit.
- 36C26127Q0047_Sol.pdfMain solicitation, read only in part (pages 1 to 7 and 61 to 65); pages 8 to 60 were not provided, so read the full document on SAM.gov. It includes the SF 1442 offer form, which you must complete and sign. Read in part (pages 1–7 and 61–65 of 65).
- 18. Site Visit Flyer 36C26127Q0047.pdfSite visit flyer, read in full. It gives the site visit details and the RFI rules, and needs no action now. Read.
- 2. SOW ATTACHMENT_Reference Drawings.pdfEarlier drawing set dated April 28, 2026, read only in part (pages 1 to 5 and 10 to 18). It is replaced by the November 2026 drawings but shows the same areas, so read it for reference only. Read in part (pages 1–5 and 10–18 of 18).
- 16._VHA ICRA PROJECT.pdf Not read: over our length limit.
- 13. RB-2_WALL BASE.pdf Not read: over our length limit.
- 36C26127Q0047 Amendment 0001.pdfAmendment read in full. It posts the site visit sign-in roster and needs no action from you. Read.
- 9. LVT-2_LUXURY VINYL TILE.pdfProduct data sheet for the LVT-2 luxury vinyl tile, read in full. It applies to the area the drawings mark LVT-2, so price it where that area is shown. Read.
- 14. RST_RESILIENT STAIR TREADS.pdf Not read: over our length limit.
- 6. CPT-1_CARPET.pdf Not read: over our length limit.
- 1. SOW ATTACHMENT_Specifications_.pdfSpecifications, read only in part (pages 1 to 12 and 263 to 268); pages 13 to 262 were not provided. They set product, installation and warranty requirements, and you must follow them. Read in part (pages 1–12 and 263–268 of 268).
- 06 10 00 Rough Carpentry.pdf Not read: over our length limit.
- 36C26127Q0047 Amendment 0003.pdfLatest amendment, read only in part (pages 1 to 7 and 18 to 23). It sets the new due date, the 300-day period and the updated clauses, and the SF 30 asks you to sign and return it. Read in part (pages 1–7 and 18–23 of 23).
- Updated SOW ATTACHMENT_Reference Drawings 20261106.pdfUpdated reference drawings, read only in part (pages 1 to 5 and 10 to 19). They show the flooring types, wall base and the Building 98 weekend phasing plan, and you must price to them. Read in part (pages 1–5 and 10–19 of 19).
- 8. LVT-1_LUXURY VINYL TILE.pdfProduct data sheet for the LVT-1 luxury vinyl tile, read in full. It sets the product you must price for the default vinyl areas. Read.
- 20261117_RFI Responses Replace Flooring MCC.pdf Not read: over our length limit.
- Updated SOW Replace Flooring in McCellan_20261105_.pdfUpdated statement of work, read in full. It sets the work, schedule, submittal and records rules, and you must price and follow it. Read.
- 3. SOW ATTACHMENT_Bldg 209 McClellan Lead-Asbestos REP 2017.pdf Scanned image, not read.
- 12. RB-1_MILLWORK_WALL_FINISHING_SYSTEMS.pdf Not read: over our length limit.
- 19. Price Breakdown Worksheet.docxBlank cost worksheet by division with overhead, profit and bonds. Fill it in to build your price; whether you must submit it is not stated. Read.
- 20. Requests for Information RFI_ Form.docxBlank RFI form. The RFI window closed on November 3, 2026, so you cannot use it now. Read.
- 5. Schluter_vinpro-data-sheet.pdf Not read: over our length limit.
- 36C26127Q0047 Amendment 0002.pdfEarlier amendment, read in full. It set a December 2, 2026 due date, which Amendment 0003 now replaces. Read.
- 11. PCRA 612A4-27-020 Replace Flooring in McCellan.pdf Not read: over our length limit.
- 4. SOW ATTACHMENT_1996 BW Asbestos Survey Bldgs 209.pdf Scanned image, not read.
- 7. ILSM 612A4-27-020 Replace Flooring in McCellan.pdf Not read: over our length limit.
- 17. WD CA20260007 dtd 9 3 2026.pdf Not read: over our length limit.
- 15. Tarkett Wall Base Made in USA.pdf Not read: over our length limit.
- 10. MANN-0263 Made in the USA Supply Chain PDF v7_Digital.pdf Not read: over our length limit.
- Site Visit Sign-in 612A4 27 020 _ 10 23 2026.pdf Scanned image, not read.
Not stated in what we read
- Davis-Bacon wage rates in Wage Determination CA20260007 could not be reviewed here. Read it before you price labor.
- Asbestos locations and quantities in Building 209, because the 1996 and 2017 reports are scanned images with no readable text.
- Contents of the November 17, 2026 RFI responses and the Excel flooring square-footage spreadsheet, neither of which could be reviewed. They may change quantities or answers.
- Carpet manufacturer warranty length: the specifications say both ten and 25 years, so the required term is unclear.
- Liquidated damages or other late-completion penalties, and payment terms. These are not in the pages provided.
- Whether the Price Breakdown Worksheet must be submitted with the quote, and how many quote copies are required.
Notice text
The Purpose of Amendment 0003 is to update the solicitation and add and remove the following: 1.Extend the Quote Due date to December 8, 2026, at 3:00PM (PT) 2. Add Updated and Revised SOW, SOW Attachments and drawings, Specifications 06 10 00 Rough Carpentry, and an Excel spreadsheet of bldg.’s SF.VA Responses to RFIs received. 3. Updates the Period of Performance on Page 1, of SF 1442 item F. of the Solicitation to 300 calendar days from NTP. 4.
Add /remove and update Various RFO clauses/Provisions, and VAAR Clauses/Provisions (Deviations dated Oct 2026) and remove outdated ones. 5. VAAR Clause 852.219-75 (Deviation Oct 2026) attached in this amendment 0003 is the version to submit with your quote. See attached Amendment 0003 document for all details. All other terms and conditions remain unchanged and in full force and effect. The purpose of Amendment P0002 is to extend Quote due date to December 2, 2026 at 3:00PM(PT).
All other terms and conditions remain unchanged and in full force and effect. The Purpose of Amendment P0001 is to post the Site Visit Sign-in roster list of vendors that attended the site visit that took place at 10AM (PT) October 23, 2026. All other terms and conditions remain unchanged and in full force and effect. Main Description and Details: This is a combined synopsis/solicitation for commercial construction prepared in accordance with part 12.
This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation No. 36C26127Q0047, Project No. 612A4-27-020, Replace Flooring at VA McClellan This is a firm-fixed-price construction requirement. The period of performance is: 160 calendar days after NTP. The place (s) of performance are Three (3) Total: (1) McClellan VA Clinic, Building 98, 5342 Dudley Blvd, McClellan Park, 95652,(2) McClellan VA, Administrative Building 209, 3230 Peacekeeper Way, McClellan Park, CA 95652, and (3) McClellan VA, Administrative Building 949, 3401 Beech St. McClellan Park, CA 95652 All requests for information (RFI) regarding this RFQ must be submitted in writing and receive no later than November 3, at 12:00 PM PT. All RFIs must be submitted via email to Mr. Rosario Chaidez at e-mail: Rosario.chaidez1@va.gov. This procurement is a total service-disabled veteran-owned small business (SDVOSB) set-aside.
NAICS Code is 236220 – Commercial and Institutional Building Construction; Small Business Size Standard: $45.0M. Bid bonds, payment and performance bonds are required under this solicitation and resultant contract. A bid guarantee in the form of a bid bond must be submitted with your Quote before the deadline. A team of Government Technical personnel in accordance with Revolutionary FAR Overhaul (RFO) 12. 203 will evaluate the quotes received. Basis of Award will be price only.
The Government intends to award one (1) contract as a result of this solicitation. The Government seeks to award that responsible Vendor whose quote, conforming to the solicitation, is determined to be the most advantageous to the Government considering Price only. Davis-Bacon Act Wage Determination Decision No. CA20260007 dated 9/3/2026 is attached and applies to this requirement.
As published on SAM.gov.
Contacts
- Rosario Chaidez, rosario.chaidez1@va.gov, 9169234548
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 8, 3:00 PM PT12 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 236220, commercial and institutional building construction, soonest deadline first.
- Department of Veterans AffairsFY27 NRM (PROJ 573-24-110) BB - Expand Cardiology Service
- Department of the Air ForceFitness building supplies, Homestead Air Reserve Base, FL
- Department of Veterans AffairsVISN 2 EHRM Industry Day
- Department of the ArmyNorth Region Small Business MATOC, Mobile District J&A Capacity Increase
- Department of Veterans AffairsRoom prep for new PET/CT scanner, St. Louis, MO
- Department of Veterans AffairsFlooring, cove base and paint at VA OIG offices, New York
- Departmental OfficesTwo crew quarters buildings and site work, Rawlins, WY
- Department of the ArmyProgressive Design-Build (PDB) - RENOVATE HQ AFMC B/10262 PH 2 at WPAFB
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy