1. Opportunities
  2. Department of Agriculture
  3. Forest Service
  4. 1240LU27Q0001

Duplex roof and wall panel replacement, Powell, ID

You would remove and replace the roofs, water-damaged structural insulated panels and some structural members of a two-unit, 3-bedroom staff housing duplex at Powell Ranger Station, Idaho.

Official title: GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest

Deadline
Dec 11, 5:00 PM PT
16 days left
Who can bid
Small businesses
Size standard for NAICS 236118: $45 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Kamiah, ID
Buyer: USDA-FS, Csa Intermountain 9

What they're buying

The work must be finished by November 30, 2027, and the job is a total small business set-aside.

Top catches

Two different due dates
“Response deadline: 2026-12-11T17:00:00-08:00” SAM.gov record

The SAM.gov record shows 12/11/2026 at 5:00 p.m. (-08:00). The solicitation cover still shows 11/13/2026 at 1700, which has passed. Confirm the current due date with the contract specialist before you plan your quote.

Amendments change key terms
“Period of Performance is changed.” Notice text

Amendment 01 changed the period of performance, and Amendment 02 added questions and answers and photos. Neither file was reviewed here. Read both on SAM.gov before you price, because they override the original solicitation.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 3 of 8 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove and replace the existing roof(s), water-damaged structural insulated panels (SIPs), and some structural roof and wall members.
  • Install new SIP wall and roof panels (6-1/2 inch walls, 10-1/4 inch roofs), metal roof panels, flashing, and sealants.
  • Price every base line on the Schedule of Items: mobilization, superstructure, exterior enclosure, roofing, interior construction, plumbing, mechanical, and electrical.
  • Haul demolished materials off Forest Service land and follow the construction waste plan, including landfill tipping fees.
  • Replace wiring devices and LED lighting, including exterior pole lights, as specified in Division 26.
  • Option item 0002, interior painting, must be priced separately. The government may exercise it within 90 calendar days after award.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Two different due dates. The SAM.gov record shows 12/11/2026 at 5:00 p.m. (-08:00). The solicitation cover still shows 11/13/2026 at 1700, which has passed. Confirm the current due date with the contract specialist before you plan your quote.
  • Amendments change key terms. Amendment 01 changed the period of performance, and Amendment 02 added questions and answers and photos. Neither file was reviewed here. Read both on SAM.gov before you price, because they override the original solicitation.
  • 20 percent bid bond required. A bid guarantee of 20 percent of your bid is required because the quote is over $150,000. At the $250,000 to $500,000 range shown, that is $50,000 to $100,000. Arrange a surety bond on SF-24 with power of attorney before you submit.“Bid Guarantee (FAR 52.228-1): 20% required if quote is in excess of $150,000.” C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 1
  • Wage rates not readable. The wage determination is a scanned image, and we could not review it. You must read it before you price any labor. Its rates set what workers must be paid.“DBA WD ID20260002, Dated 05/18/2026, Idaho County, ID” C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 5
  • Price all trades, not just roofing. The work summary covers the roof and panels, but the schedule also prices plumbing, mechanical, and electrical. The specifications include lighting and wiring devices. Price every line, and ask if any trade is not in scope.“pricing for ALL line items listed in Attachment (2) – Schedule of Items.” C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 4
  • Every technical factor needed. Your technical proposal must respond to all three factors: performance schedule and approach, experience and project management, and past performance. A proposal missing any one factor will not be considered further.“Initial proposals which do not include responses to any one of the technical factors will not be considered further.” C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 19

Key terms

Who can bidSmall businesses only (total small business set-aside)NAICS 236118, small business size standard $45 Million.Notice text
Contract period12/01/2026 to 11/30/2027Work must be complete by November 30, 2027. Amendment 01 changed this period, and we could not review it.C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 3
How they chooseBest value, comparative evaluation, firm-fixed priceTechnical factors and past performance are weighed against price. The government says formal tradeoff procedures will not be conducted.C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 19
How to submitEmail to PPS.proposals@usda.govFiles must be Microsoft Word, Microsoft Excel, or Adobe PDF. The subject line must be the solicitation name and number.C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 21
Questions dueNovember 3, 2026, 5:00 p.m. PDT (passed)Amendment 02 includes questions and answers, but we could not review it.C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 24
Estimated value$250,000 to $500,000 (price range)Shown on the solicitation cover. No government estimate is stated.C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 1
Contract typeFirm-fixed price, commercial constructionThe contract is a commercial construction contract.C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 19
Site visitOrganized visit October 29, 2026, 10:00 a.m. PDT (passed)A Teams pre-quote meeting was set for October 28, 2026, 2:00 p.m. PDT. Both dates have passed.C04 Attachment 1 - Solicitation Powell Duplex.pdf, page 21

How to respond

  1. Read Amendment 01 and Amendment 02 on SAM.gov first. They were not in the files reviewed here.
  2. Email your quote to PPS.proposals@usda.gov by Friday, December 11, 2026, 5:00 p.m. (-08:00), as shown in the SAM.gov record.
  3. Use the solicitation number 1240LU27Q0001 as the email subject. Send Word, Excel, or PDF files, each clearly labeled.
  4. Include the signed SF-1442 with blocks 14 to 20c completed, the Schedule of Items with every line priced, a scanned SF-24 bid bond with power of attorney, and written responses to all three technical factors.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Current due date and period of performance after Amendments 01 and 02, which were not reviewed.
  • Wage rates in wage determination DBA WD ID20260002, which is a scanned image that could not be read.
  • Drawings (Attachment 4) and specification pages 38 to 142, which were not reviewed.
  • Whether the October 28 and October 29, 2026 meeting and site visit were changed by an amendment.
  • Liquidated damages, delay penalties, and payment timing. Only electronic invoicing through IPP is stated.
  • Government estimate for the work. Only a price range is shown.

Notice text

This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 1240LU27Q0001 is issued as a Request for Quotation (RFQ) for the Powell Duplex Improvements on the Nez Perce – Clearwater National Forest. The project consists of removing and replacing the existing roof(s), water damaged Structurally Insulated Panels (SIP), some structural members in the roof and walls of an existing residential duplex.

The existing demolished materials shall be disposed of off Forest Service lands in accordance with all State and federal laws. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 236118. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside. All responsible sources may submit a quotation which will be considered by the agency.

Amendment 01 - Summary: Due date for quotes is extended. Period of Performance is changed. Amendment 02 - Summary: Due date for quotes is extended, Questions/Answers, Photos of Duplex.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Forest Service by email

Each morning we'll send the new solicitations and sources-sought notices from Forest Service, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy