Replace gate valve frame at Flag Lake, Barksdale AFB, LA
You would replace two rusted vertical frame pieces and one horizontal brace on the Flag Lake water control gate valve at Barksdale AFB, Louisiana, within a 90-day period of performance.
Official title: Gate Valve Frame Replacement
- Deadline
- Nov 27, 1:00 PM CT
- 2 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Barksdale AFB, LA
- Buyer: FA4608 2 Cons LGC
What they're buying
The government supplies the new frame parts, and you supply labor, tools, and lawful off-base disposal of the removed steel.
Top catches
“2026-11-27T13:00:00-06:00” SAM.gov record
The SAM record uses a -06:00 offset, which is standard time, but the notice says Central Daylight Time. These differ by one hour, so send early and ask the contracting officer which time governs.
“Lowest three (3) offers will undergo technical evaluation.” Combined Synopsis Solicitation - FA4608QS053.pdf
Only the three lowest-priced quotes get technical evaluation, unless three or fewer arrive. A strong Technical Plan may never be read if your price is not among the lowest three, so price carefully.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 3 of 3 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Temporarily remove the electric motor-driven actuator and top headrail, then unbolt the old frame from the concrete headwall.
- Install the government-supplied replacement vertical frame rails and horizontal brace, with manufacturer hardware.
- Field-drill bolt holes so the retained headrail fits the new vertical pieces, then reinstall the headrail and actuator.
- Reattach the frame to the headwall to the gate manufacturer specifications.
- Run a joint operational check with the Government point of contact: full open to full close, no binding, proper seal at closure.
- Haul away and lawfully dispose of all removed material, including three pieces of corroded steel angle iron, off base. Leave the site as clean as you found it.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline time zone conflict. The SAM record uses a -06:00 offset, which is standard time, but the notice says Central Daylight Time. These differ by one hour, so send early and ask the contracting officer which time governs.
- Price decides technical review. Only the three lowest-priced quotes get technical evaluation, unless three or fewer arrive. A strong Technical Plan may never be read if your price is not among the lowest three, so price carefully.
- Service Contract Act wages required. Price labor at the wage and fringe rates in Attachment 2 for the job title that matches the tasks, since the notice does not name one. If no title fits, ask the contracting officer how to classify the work before you bid, and note the attachment also requires health and welfare of $5.92 per hour.“Offerors must review Attachment 2, Wage Determination.” Combined Synopsis Solicitation - FA4608QS053.pdf, page 2
- Email only, holiday-week deadline. Your quote must go by email, and the deadline is Friday, 27 November, the day after Thanksgiving. The notice makes you responsible for confirming the quote arrived on time, so send early and get a reply confirming receipt.“Quotes must be submitted via email to the Contract Specialist and Contracting Officer listed below” Combined Synopsis Solicitation - FA4608QS053.pdf, page 1
- Government supplies the new parts. Do not price the new frame rails, brace, or manufacturer hardware, because the government provides them. The notice does not say when or where you pick them up, so ask before you schedule the work.“The replacement vertical frame rails and the horizontal brace will be provided by the government, including connecting hardware as provided by the manufacturer.” Attachment 1 - Statement of Work.pdf, page 1
- Base passes need a written request. Workers needing base access or vehicle passes must be listed in a written request from you to the contracting officer. Failure to comply with these requirements may result in withholding of final payment, so start early.“The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base.” Combined Synopsis Solicitation - FA4608QS053.pdf, page 8
Key terms
| Who can bid | Any business. No set-aside used.Full and open competition. Your quote must include your SAM Unique Entity Identifier (UEI) number.SAM.gov record |
|---|---|
| Contract period | 90 daysStart date and whether days are calendar or working days are not stated.Combined Synopsis Solicitation - FA4608QS053.pdf, page 1 |
| How they choose | Best value based on price and technicalPrice ranks offers first. Only the three lowest-priced offers get technical review.Combined Synopsis Solicitation - FA4608QS053.pdf, page 1 |
| How to submit | Email to the Contract Specialist and Contracting OfficerEmail only. No portal or mail option is named.Combined Synopsis Solicitation - FA4608QS053.pdf, page 1 |
| Contract type | Commercial services, one line itemCLIN 0001, quantity 1, unit Each. Contract type is not named.Combined Synopsis Solicitation - FA4608QS053.pdf, page 1 |
How to respond
- Email both the Contract Specialist, Michael Lipscomb (michael.lipscomb.2@us.af.mil), and the Contracting Officer, Thomas Hutchins (thomas.hutchins.2@us.af.mil), by 1:00 PM CDT on Friday, 27 Nov 2026. Send early because the notice states the time zone two ways.
- Put your company name, address, telephone, email, and SAM Unique Entity Identifier (UEI) number on the quote.
- Include a written statement that you agree to all terms, conditions, provisions, and any amendments.
- Include a Technical Plan of no more than two pages on how you will replace the two vertical pieces and one brace, plus your price for CLIN 0001. The plan should not restate the government requirements.
- Your prices must stay firm for 60 calendar days from the due date.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 2 - Wage Determination.pdfLouisiana wage determination 2015-5191, revision 32, dated 8/22/2026, for Bossier, Caddo and De Soto counties. You must read it to price labor and fringe benefits; its page headers show FA460827P0001, not the solicitation number. Read.
- Combined Synopsis Solicitation - FA4608QS053.pdfThe solicitation itself, with the due date, email rules, evaluation method, and clauses. You must read it and follow its instructions for your quote. Read.
- Attachment 1 - Statement of Work.pdfThe statement of work covering the work, cleanup, disposal, and the operational test. You must read it and price the work it describes. Read.
Not stated in what we read
- Estimated value or budget for this work.
- Start date for the 90 days, and whether the days are calendar or working days.
- The cutoff date for questions to the contracting officer.
- How and when you receive the government-supplied frame parts.
- Which Attachment 2 job title fits this work.
- Payment timing after you invoice in Wide Area WorkFlow (WAWF).
Notice text
The purpose of this requirement is to replace two (2) rusted vertical frame pieces and one (1) horizontal brace of the original gate valve assembly. Work requires temporarily removing an existing electric motor-driven actuator and retained top headrail, unbolting the frame from its primary lower concrete headwall connection, field-drilling bolt holes to align and secure the retained headrail to the new vertical components, and reattaching the reassembled structure to the concrete headwall strictly in accordance with original gate manufacturer specifications.
Following reinstallation of the headrail and motor actuator, the Contractor shall verify that the gate valve is fully operational, traveling freely and without obstruction between the fully open position and achieving a proper seal upon complete closure. The contractor shall provide all logistics, labor, tools, and the lawful disposal of all materials and removed components IAW Attachment 1, Statement of Work, Dated 01 Sep 2026.
As published on SAM.gov.
Contacts
- SSgt Michael Lipscomb, michael.lipscomb.2@us.af.mil, 3184566840
- Mr. Thomas Hutchins, thomas.hutchins.2@us.af.mil, 3184563729
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 27, 1:00 PM CT2 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 811310, commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance, soonest deadline first.
- Department of Veterans AffairsHood, fire system and extinguisher service, Little Rock, AR
- US Coast GuardReplace crane turntable bolts at Cape May, NJ
- Department of the ArmyHalon fire bottle testing at Jacksonville Air Guard, FL
- Department of the NavyFlow meter verification at Pearl Harbor shipyard, HI
- Department of the ArmyMaterial handling and industrial equipment repair
- Department of the Air ForceRepair of Sciaky spot welder at Tinker AFB, OK
- Department of the NavyFire extinguisher hydrostatic testing at Iwakuni, Japan
- Department of the ArmyDiesel rotary UPS maintenance at USAG Humphreys
Free · at most one email a morning
Get new notices from Department of the Air Force by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy