Halon fire bottle testing at Jacksonville Air Guard, FL

You would perform 12-year hydrostatic testing, dip tube inspections and discharge hose O-ring replacement on 33 150-lb Halon fire bottles at the 125 Florida Air National Guard base in Jacksonville, FL.

Official title: Halon Bottle Inspection

Deadline
Nov 27, 12:00 PM ET
2 days left
Who can bid
Small businesses
Size standard for NAICS 811310: $12.5 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
FL
Buyer: W7M2 USPFO Activity Flang 125

What they're buying

It is one firm fixed price job set aside for small businesses, and the due date and work window conflict across the documents.

Top catches

Two different due dates
“20 NOV 2026” Solicitation W50S6Y27RA002.pdf, page 1

The SAM.gov record says Friday, 27 November 2026 at 12:00 PM, UTC-05:00, but the solicitation form says 20 NOV 2026 at 11:00 AM local time, which has already passed. Call contracting officer Katie Jennings at 904-741-7406 to confirm the correct date now.

Work window conflicts with PWS
“04 Dec 2026” Solicitation W50S6Y27RA002.pdf, page 6

The PWS says the work takes 2 to 3 business days, but Section F lists 04 Dec 2026 to 01 Jan 2027 and 30 calendar days. The end date is New Year's Day, when the PWS says no services are performed, so ask which schedule applies before you plan crews.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 2 of 2 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Hydrostatic testing of 33 each 150-lb Halon cylinders and their discharge hose assemblies, per NFPA 10 standards
  • Rebuild valves with new valve stems and O-rings on each bottle
  • Remove existing discharge hose O-rings and install new compatible O-rings
  • Visual and internal inspection of each cylinder dip tube for wear, corrosion, cracking or deterioration
  • Supply nitrogen for repressurization, leak check and system prep, plus all certified labor, shop consumables and tooling
  • Build and maintain a spreadsheet of all serial numbers and the maintenance type done on each

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Two different due dates. The SAM.gov record says Friday, 27 November 2026 at 12:00 PM, UTC-05:00, but the solicitation form says 20 NOV 2026 at 11:00 AM local time, which has already passed. Call contracting officer Katie Jennings at 904-741-7406 to confirm the correct date now.
  • Work window conflicts with PWS. The PWS says the work takes 2 to 3 business days, but Section F lists 04 Dec 2026 to 01 Jan 2027 and 30 calendar days. The end date is New Year's Day, when the PWS says no services are performed, so ask which schedule applies before you plan crews.
  • Specific certifications required. You must prove Amerex distributor status with manufacturer training, a valid USDOT RIN, a closed recovery and reclaim system with halocarbon training, and at least five years on Amerex model 600 extinguishers. Confirm you hold all of these before you bid, since the PWS does not say when proof is due.“Must be an Amerex Distributor” I.A.02. PWS and PRS MXG Halon Bottle KO.pdf, page 8
  • Valve work missing from price item. The PWS requires rebuilding valves with new stems and O-rings on each bottle, but priced item 0001 and Section C cover only hydrostatic testing, dip tube inspection and discharge O-rings. Ask the contracting officer whether valve work is included in the single price before you bid.“Rebuilding valves to include new valve stems and O-rings on each bottle” I.A.02. PWS and PRS MXG Halon Bottle KO.pdf, page 8
  • Past performance examples required. The notice asks for two examples of this type of project from the past 3 years, and past performance is one of three factors. If you cannot show two, your bid will likely score lower on this factor.“Past performance, provide 2 examples of completing this type of project within the past 3 years.” Solicitation W50S6Y27RA002.pdf, page 20
  • Background checks take weeks. Base access checks and card processing may take multiple weeks, and the PWS holds you responsible for delays. Start paperwork for each worker early and plan for Antiterrorism Awareness Level I (AT Level I) training within 15 calendar days of start.“may take multiple weeks and shall factor this lead time” I.A.02. PWS and PRS MXG Halon Bottle KO.pdf, page 4

Key terms

Who can bidSmall businesses only (total set-aside)The form lists a size standard of USD 12,500,000.00 under NAICS 811310.SAM.gov record
Contract periodConflicting: 2 to 3 business days, or 04 Dec 2026 to 01 Jan 2027The PWS gives the first; Section F of the solicitation gives the second.I.A.02. PWS and PRS MXG Halon Bottle KO.pdf, page 1
How they chooseBest value: inspection time, past performance, priceThe relative weight of the three factors is not stated.Solicitation W50S6Y27RA002.pdf, page 20
Contract typeFirm fixed price, one jobItem 0001 is one job priced as a single amount for all 33 bottles.Solicitation W50S6Y27RA002.pdf, page 3

How to respond

  1. Confirm the due date with contracting officer Katie Jennings at 904-741-7406 or katie.jennings@us.af.mil, because the notice shows two different dates.
  2. How to submit your offer: Not stated. The notice does not name a portal, email address or delivery method, so ask Katie Jennings before the deadline.
  3. Price Item 0001 as one firm fixed price for the whole job, including nitrogen, consumables, tooling and any valve work the PWS requires.
  4. Give the time you need to complete the inspection and two past performance examples from the past 3 years, since both are evaluation factors. Be ready to show proof of the required certifications.
  5. If you win, submit your quality control plan within 10 days of award and keep the serial number spreadsheet the PWS requires.

Attached files

From SAM.gov. Download links open the original files.

  • I.A.02. PWS and PRS MXG Halon Bottle KO.pdfThe performance work statement and performance summary that set the work, standards and certifications you must meet; you read it, and there is no form to fill in. Read.
  • Solicitation W50S6Y27RA002.pdfThe solicitation form with the price item, dates, clauses and evaluation factors; you must fill in blocks 12, 17, 23, 24 and 30 and sign block 30. Read.

Not stated in what we read

  • How to submit an offer: portal, email or mail.
  • Estimated value; the total award amount on the form is blank.
  • Deadline for questions about the notice.
  • The map of the Alert area that the PWS refers to; it is not on the attachment list.
  • Paragraph 3.0 on Government-furnished items; the PWS refers to it but the copy provided does not include it.
  • Relative weight of time to complete, past performance and price.

Notice text

Provide all labor, materials, and nitrogen required to perform hydrostatic testing of the cylinder and hose assemblies, conduct internal dip tube inspections, and install new discharge hose O-rings on thirty-three (33) 150-lb Halon bottles.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 21, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy