HQ building electrical and HVAC upgrades, Oklahoma City, OK
The FAA is buying mechanical and electrical upgrades in the Headquarters Building at the Mike Monroney Aeronautical Center in Oklahoma City, OK, with six optional add-on items for ductwork, lighting controls, raceways, carpet and paint, fire alarm, and emergency radio coverage.
Official title: Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK.
- Deadline
- Dec 4, 4:00 PM CT
- 8 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Oklahoma City, OK
- Buyer: 6973GH Franchise Acquisition Svcs
What they're buying
The base contract runs 887 calendar days after notice to proceed.
Top catches
“5:00 pm, Central Time on Friday, December 4,” Amendment 0008.pdf, page 3
SAM.gov shows 4:00 PM on December 4, but Amendment 0008 says 5:00 PM Central. Plan to submit by 4:00 PM Central and ask the contracting officer in writing which time applies.
“will eliminate the offeror from consideration for contract award” Amendment 0002.pdf, page 6
To be eligible, you and both proposed subcontractors need High, Moderate, or Satisfactory past performance confidence. Little or No Confidence removes you from award, so check your references and subcontractor records before you commit.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 21 of 40 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Base bid: mechanical and electrical upgrades in the HQ building, including new electrical rooms, an emergency generator with gas service, and VAV box and AHU-1 valve work.
- Six additive bid options: HVAC ductwork, lighting controls, in-slab raceway conductors, carpet and wall base with paint, fire alarm upgrade, and new ERRCS emergency radio coverage.
- Hydronic system drain, flush, strainer cleaning and refill, plus hydrostatic testing at 1.5 times design pressure, minimum 100 psi, held 15 minutes.
- Waste plan within 15 days after notice to proceed, and diversion of at least 55 percent of non-hazardous waste by weight.
- Pre-work and post-work test and balance for the air handling units.
- Surplus soil sampling and testing, with approval before any soil leaves the site; unsuitable soil goes to a special-waste landfill.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Two different due times. SAM.gov shows 4:00 PM on December 4, but Amendment 0008 says 5:00 PM Central. Plan to submit by 4:00 PM Central and ask the contracting officer in writing which time applies.
- Past performance can disqualify you. To be eligible, you and both proposed subcontractors need High, Moderate, or Satisfactory past performance confidence. Little or No Confidence removes you from award, so check your references and subcontractor records before you commit.
- Key personnel must be your staff. Your construction project manager and superintendent each need seven years in that role and two completed multi-discipline projects in the past seven years, and both must be employed by you. If they do not meet this, your technical volume is rated unacceptable, so confirm each person's record before you submit.“Must be employed by the offeror” L.12 TECHNICAL ACCEPTABLE - UNACCEPTABLE EVALUATION OF KEY PERSONNEL.pdf, page 1
- Performance period conflicts. Addendum 01 sets 887 calendar days after notice to proceed, but a Q&A question cites a 365-day limit. The Q&A answer points back to Addendum 01, so price 887 days unless the contracting officer confirms otherwise in writing.“complete the entire Work ready for occupancy and use not later than 887 days after issuance of Notice to Proceed.” Addendum 01 Full Document.pdf, page 2
- After-hours work and outage notice. Demolition is limited to 6 PM to 6 AM on weekdays, and other work outside 6 AM to 6 PM needs advance approval. Outages need seven working days notice, so price the after-hours and weekend labor.“Prior to any outage or shutdown, seven (7) working days notification must be made” Addendum 01 Full Document.pdf, page 4
- Bonds due soon after award. The form says performance and payment bonds are required, with 7 calendar days after award to furnish them. Ask your surety now whether it can issue both bonds on that timeline.“The offeror agrees to furnish any required performance and payment bonds.” Solicitation Offeror and Award Construction.pdf, page 2
Key terms
| Who can bid | Open to all businesses; no set-asideThe NAICS 236220 size standard is based on dollars, per Q&A 90.SAM.gov record |
|---|---|
| Contract period | 887 calendar days after notice to proceedYou must begin within 10 calendar days of the award notice. A Q&A question cites a 365-day limit.Addendum 01 Full Document.pdf, page 2 |
| How to submit | Electronically, Volume II technical and Volume IV cost and priceThe email address or portal is not stated in the text provided.Questions Answer Log 6-2-26.pdf, page 8 |
| Questions due | Closed: 5:00 p.m. CT, June 3, 2026Amendment 0004 set a firm cut-off. No further questions are considered after that time.Amendment 0004.pdf, page 2 |
| Contract type | Construction; lump-sum base bid plus six optional itemsBid options are additive and may be awarded in any order, per Q&A 25.Questions Answer Log 6-2-26.pdf, page 12 |
| Site visit | Held April 23, 2026; no new visit statedQ&A 91 asks whether subcontractors had to attend the mandatory site visit, and the answer is not clear.HQ BUILDING MECHANICAL AND ELECTRICAL UPGRADES SITE VISIT SIGN IN.pdf, page 1 |
How to respond
- Where to send: Not stated in the text provided. Confirm the submission address or portal with the contracting officer, Cynthia Cooper, at 405-954-2601 before the deadline.
- Volume II technical proposal: submit electronically, with key personnel resumes on SIR Attachment 17 (up to 25 pages, optional). It is due Friday, December 4, 2026, and the earlier time of 4:00 PM Central is the safer target.
- Volume I: complete and notarize Attachments 15 and 16 and include them with your proposal, per Q&A 135.
- Volume IV cost and price: complete Attachment 1, Section B and Attachment 14 even if your price did not change. Due Friday, December 18, 2026, 5:00 PM Central.
Attached files
From SAM.gov. Download links open the original files.
- Amendment 0008.pdfAmendment 0008 changes the proposal rules, adds the key personnel requirement, and sets the new technical and cost due dates. Read it in full; it governs. Read.
- Amendment 0003 Attachment 2 - Addendum 02 COMPLETE.pdfAddendum 02 with specification 017419 and mechanical drawing and schedule changes; only pages 1 to 10 and 18 to 19 were provided, so you must read the rest on SAM.gov. Read in part (pages 1–10 and 18–19 of 19).
- Amendment 0005.pdfAmendment 0005 extends the proposal due date to June 10, 2026; this date was later superseded, so no action is needed beyond awareness. Read.
- Amendment 0006.pdfAmendment 0006 issues questions and answers 1 through 192; you should review the answers, since they are binding context for pricing. Read.
- Amendment 0008 Attachment 1 Section B.xlsxRevised Section B price schedule with the base bid and six options; you must fill in and return it with your cost proposal. Read.
- Amendment 0002.pdfAmendment 0002 sets the past performance rating rules that decide eligibility; you must read it closely. Read.
- Attachment 5 Chapter 33 Construction Safety.pdf Not read: over our length limit.
- Attachment 16 OCAT 00310 Anti Non-Collusion Affidavit.pdf Not read: over our length limit.
- Attachment 15 OCAT 00320 Business Relationship Affidavit _002_.pdf Not read: over our length limit.
- Attachment 7 Payment Bond.pdf Not read: over our length limit.
- Attachment 17 Resume for Key Personnel.pdfForm for the construction project manager and superintendent with project details; you must complete it for each person you propose. Read.
- HQ BUILDING MECHANICAL AND ELECTRICAL UPGRADES SITE VISIT SIGN IN.pdfSign-in sheet from the April 23, 2026 site visit; it is a record only and needs no action. Read.
- Attachment 9 Operational Control Docs.pdf Scanned image, not read.
- Attachment 11 Past Performance Survey.docx Not read: over our length limit.
- Addendum 01 Full Document.pdfAddendum 01 with the summary of work, hours, outage, and environmental rules; you must read and price from it. Read.
- Attachment 12 Client Authorization Letter.pdfSample letter that your past clients sign to authorize the government to contact them; you must obtain one from each client you list. Read.
- Amendment 0003 Attachment 3 - Asbestos Abatement Information.pdfFloor plans of asbestos-containing floor tile areas to be abated by the owner before you start; you should read it to plan your sequence. Read.
- ATTACHMENT 3 2025.02.20_FAA_HQB MEP UPGRADES_100 CD_PROJECT MANUAL.pdf Not read: over our length limit.
- Attachment 8 Performance Bond.pdf Not read: over our length limit.
- Attachment 14 Major Cost Element Breakdown.xlsx Older version, not read.
- Amendment 0003 Attachment 1 - QA Log.pdf Not read: over our length limit.
- Amendment 0003 Attachment 4 - HQB Furniture Information.pdf Not read: over our length limit.
- Solicitation Offeror and Award Construction.pdfMain solicitation cover and offer form with the 120-day acceptance rule and bond requirement; you must sign the offer page with the amendments acknowledged. Read.
- Amendment 0003.pdfAmendment 0003 cover sheet; the text in the provided copy is garbled, so you must read the original on SAM.gov. Read.
- Amendment 0003 Attachment 5 - HQB Requested Photos.pdf Scanned image, not read.
- 6973GH-26-R-00082.pdf Not read: over our length limit.
- L.12 TECHNICAL ACCEPTABLE - UNACCEPTABLE EVALUATION OF KEY PERSONNEL.pdfKey personnel evaluation rules that make your technical volume acceptable or unacceptable; you must meet these before submitting. Read.
- Attachment 10 Past Performance Experience Form.docxForm for each past project you cite as relevant experience; you must complete it for each reference. Read.
- Amendment 0001 with Updated Clauses.pdf Not read: over our length limit.
- ATTACHMENT 2 HQB MEP UPGRADES_100 CD_DESIGN ANALYSIS.pdf Could not be read.
- ATTACHMENT 6 WAGE DETERMINATION.pdf Not read: over our length limit.
- Attachment 13 Contractor Release.pdfFinal payment release form; it is submitted only after the work is done, so you only need to read it now. Read.
- Amendment 0008 Attachment 14 Major Cost Element Breakdown.xlsx Not read: over our length limit.
- Attachment 1 Section B - Supplies or Services-Prices.xlsxOriginal price schedule; it is replaced by the Amendment 0008 version, so use that one for your pricing. Read.
- ATTACHMENT 4 FAA_HQB MEP UPGRADES_100 CD_DRAWINGS (1).pdf Not read: over our length limit.
- Amendment 0004.pdfAmendment 0004 replaces the first two solicitation pages, closes questions, and sets the earlier due dates; you must read it and return the new pages 1 and 2 with your proposal. Read.
- Updated QA Log 6-5-26.pdf Not read: over our length limit.
- Amendment 0007.pdfAmendment 0007 adds Addendum 03, the hydronic piping, testing, and seismic changes; read it and price the changes. Read.
- Questions Answer Log 6-2-26.pdfQuestions and answers log with many scope and pricing clarifications; only pages 1 to 9 and 12 to 15 were provided, so you must read the rest on SAM.gov. Read in part (pages 1–9 and 12–15 of 15).
- Addendum 03.pdfAddendum 03 with hydronic system drain, refill, and testing rules and asbestos-area carpet changes; you must price these changes. Read.
Not stated in what we read
- How proposals are judged and whether price is weighed, scored, or used as a pass-fail test.
- The estimated contract value; the total in Attachment 1 has no amount.
- Whether a bid bond (offer guarantee) is required; item 13B is unclear and Q&A 92 mentions a bid bond.
- The address or portal where proposals must be sent.
- Amendment 0001 text, including the minimum offer acceptance period, is not in the text provided.
- Attachment 2 (design analysis) could not be read and Attachment 9 is scanned, so you must review them on SAM.gov.
Notice text
SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors Amendment 0001 is hereby issued to to provide the Site Visit Attendees, provide Addendum 01 to the Specifications and Drawings included with this SIR, incorporate new AMS Clause 3.6.2-50, Implementation of E.O. 14398(INTERIM April 2026) and incorporate revised AMS Clauses 3.6.1-4 Small Business Subcontracting Plans (INTERIM April 2026) and 3.10.1-15, Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026), revise the Minimum Offer Acceptance Period on Page 1, Block 11 of the SIR and AMS Clause 3.2.2.3-2, Minimum Offer Acceptance Period, revise the date for submission of Questions and extend the closing date of the SIR. Amendment 0002 is hereby issued to revise Provision M.3 RELEVANT EXPERIENCE AND PAST PERFORMANCE EVALUATION (REVISED MAY 15, 2026).
Amendment 0003 is hereby issued to incorporate Amendment 0003, Attachment 1 - Questions and Answers, Attachment 2 - Addendum 02, Attachment 3 - Asbestos Abatement Information, Attachment 4 - HQB Furniture Information, and Attachment 5 - HQB Requested Photos. Amendment 0004 is hereby issued to remove Pages 1 and 2 of the Original SIR, Solicitation, Offer and Award, and incorporate New Pages 1 and 2, Solicitation, Offer and Award (Construction, Alteration, or Repair) attached.
In addition, Amendment 0004 provides New Questions and Answers 160 through 165 (attached), establishes a firm cut-off date for submission of questions and extends the proposal due date to June 5, 2026. NOTE: OFFERORS ARE TO SUBMIT NEWLY INCORPORATED PAGES 1 AND 2, SOLICITATION, OFFER AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR) WITH THEIR PROPOSAL. Amendment 0005 is hereby issued to extend the proposal due date to June 10, 2026. Amendment 0006 is hereby issued to provide Questions and Answers 1 through 192, including new Questions and Answers 166 through 192.
The proposal due date remains June 10, 2026. Amendment 0007 is hereby issued to incorporate Addendum 03, HQB Mechanical and Electrical Upgrades – SIR - 6973GH-26-R-00082, dated June 5, 2026. Amendment 0008 is hereby issued to revise Provision L.3 INSTRUCTIONS FOR PREPARATION AND SUBMISSION OF PROPOSALS, add new Provision L.12 TECHNICAL ACCEPTABLE/UNACCEPTABLE EVALUATION OF KEY PERSONNEL and request revised Cost Price Proposals. NOTE: New Volume II Technical Proposals are due on December 4, 2026 and Revise Cost/Price Proposals are due on December 18, 2026.
As published on SAM.gov.
Contacts
- Cynthia Cooper, Cynthia.Cooper@faa.gov, 4059542601
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 4, 4:00 PM CT8 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 236220, commercial and institutional building construction, soonest deadline first.
- Department of Veterans AffairsFY27 NRM (PROJ 573-24-110) BB - Expand Cardiology Service
- Department of the Air ForceFitness building supplies, Homestead Air Reserve Base, FL
- Department of Veterans AffairsVISN 2 EHRM Industry Day
- Department of the ArmyNorth Region Small Business MATOC, Mobile District J&A Capacity Increase
- Department of Veterans AffairsRoom prep for new PET/CT scanner, St. Louis, MO
- Department of Veterans AffairsFlooring, cove base and paint at VA OIG offices, New York
- Departmental OfficesTwo crew quarters buildings and site work, Rawlins, WY
- Department of the ArmyProgressive Design-Build (PDB) - RENOVATE HQ AFMC B/10262 PH 2 at WPAFB
Free · at most one email a morning
Get new notices from Federal Aviation Administration by email
Each morning we'll send the new solicitations and sources-sought notices from Federal Aviation Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy