Submarine repair and maintenance at several Navy sites
The Navy is setting up a multiple-award contract for outside firms to do repair, maintenance and modernization work on all submarines at Navy shipyards and bases.
Official title: Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Contract (MAC) for Outsourcing Work on Availabilities on all Submarines
- Deadline
- Dec 31, 5:00 PM ET
- 36 days left
- Who can bid
- Small businesses, in part
- Part of the work is set aside. Size standard for NAICS 336611: 1,300 employees · Who qualifies
- Last time
- $13M
- Likely HII Fleet Support Group LLC
- Place
- Not stated
- Buyer: Team Submarine
What they're buying
Work runs through 1 September 2030, with three option years to 1 September 2033, and responses are due 31 December 2026.
Top catches
“Existing MAC IDIQ contract holders (Requirement 1) electing to compete for Requirement 2 and/or Requirement 3” Notice text
The notice suggests that only existing Requirement 1 contract holders may compete for Requirement 2 and 3. If you do not already hold a Requirement 1 award, ask the Navy whether you can still bid on those requirements before you spend time on them. Likely, not stated outright.
“the Navy will require contractors to possess capability and capacity to meet technical requirements for critical systems to be eligible for Lot 1 scope” Notice text
Lot 1 work requires demonstrated capability and capacity for critical systems, and it is not stated as set aside for small businesses. Decide whether you can show that experience before you bid on Lot 1.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Drydock submarine repairs, maintenance and alterations at the listed shipyards and bases
- Preservation, structural and non-destructive testing, shipboard work, electrical services, component repair and engineering support
- Repair and restoration of select critical components
- Requirement 1 covers submarine availabilities under the existing contract; Requirement 2 covers SSBN and SSGN availabilities; Requirement 3 covers SSN availabilities at Kings Bay, Bangor, New London and Point Loma
- Lot 1 (critical) work involves critical systems such as vertical launch systems, ship control components, torpedo tubes, bow planes, sonar dome, large vertical array, shipboard hydraulics, normal fuel oil tanks and lube oil systems
Who supplied it lately
$13M
on a recent contract for the same kind of product: HII Fleet Support Group LLC. It ends Nov 28, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Requirement 2 and 3 entry limits. The notice suggests that only existing Requirement 1 contract holders may compete for Requirement 2 and 3. If you do not already hold a Requirement 1 award, ask the Navy whether you can still bid on those requirements before you spend time on them.
- Lot 1 needs proven critical-systems capacity. Lot 1 work requires demonstrated capability and capacity for critical systems, and it is not stated as set aside for small businesses. Decide whether you can show that experience before you bid on Lot 1.
- Separate proposal for each requirement. You must submit a separate formal proposal for each requirement you want, and each one must strictly follow the solicitation. Budget time to prepare several complete proposals, not one.“shall submit a formal proposal in strict compliance with the solicitation requirements for each applicable requirement they seek an award of” Notice text
- Rolling admissions may change the deadline. The SAM.gov record gives one response deadline, but the notice also describes rolling admissions for Requirement 1. Confirm whether Requirement 1 offers are due on 31 December 2026 or later before you plan your timeline.“provides for a rolling admissions period for Requirement 1” Notice text
- Option years are not guaranteed. The 2030 to 2033 option years apply only if the Navy exercises them. Price your offer so that the base period alone is worth pursuing.“if all options are exercised” Notice text
Key terms
| Who can bid | Partial small business set-asideThe notice sets Lot 2 aside for small businesses. Lot 1 is not stated as set aside.SAM.gov record |
|---|---|
| Contract period | Base period to 1 Sep 2030; three option years to 1 Sep 2033Each option year runs one year and applies only if exercised.Notice text |
| Contract type | Multiple-award indefinite-delivery, indefinite-quantity contractWork is ordered through delivery orders.Notice text |
How to respond
- Where to send: Not stated. The notice names no portal, email address or mailing address.
- Format: Not stated. The notice asks for a formal proposal for each requirement you seek, in strict compliance with the solicitation.
- What to include: Not stated in this notice. Get the current solicitation from SAM.gov, because the notice says to review it for changes and it lists no attachments.
- By when: Thursday, December 31, 2026, 17:00 (-05:00 offset), as shown in the SAM.gov record. Confirm whether rolling admissions change this date for Requirement 1.
Not stated in what we read
- Estimated value and any minimum or maximum ordering amounts
- How to submit the proposal, including the portal, email or address
- How proposals will be evaluated and how awards will be made
- Deadline for questions
- Whether a firm without a Requirement 1 award can compete for Requirement 2 or 3
- Contract type for pricing, and whether wage rates or price escalation apply
Notice text
Multiple-award contract indefinite-delivery indefinite-quantity (MAC IDIQ) for discrete production, non-discrete production and other production work to support Navys four public shipyards, Trident Refit Facilities (TRFs) at Kings Bay and Bangor (TRFKB and TRFB), Naval Submarine Base New London (SUBASE New London) and Naval Base Point Loma (NBPL) in accomplishing repair, maintenance, and modernization of all submarines. The initial solicitation N00024-25-R-4321 established a MAC IDIQ framework for procuring work during Chief of Naval Operations (CNO) availabilities on SSNs.
This baseline capability is now designated as Requirement 1. This solicitation N00024-27-R-4320 provides for a rolling admissions period for Requirement 1 and also incorporates two new requirements designated as Requirement 2 and Requirement 3.Requirement 2 consists of procuring work during availabilities on SSBNs and SSGNs at designated Submarine Maintenance Repair Facilities. Participating locations include Norfolk Naval Shipyard (NNSY), Puget Sound Naval Shipyard (PSNS), Pearl harbor Naval Shipyard (PHNSY), Portsmouth Naval Shipyard (PNSY), Trident Refit Facilities (TRFs) at Kings Bay and Bangor (TRFKB and TRFB), Naval Submarine Base New London (SUBASE New London) and Naval Base Point Loma (NBPL).
Requirement 3 consists of procuring work during availabilities on SSNs specifically at TRFKB, TRFB, SUBASE New London, and NBPL. Existing MAC IDIQ contract holders (Requirement 1) electing to compete for Requirement 2 and/or Requirement 3 shall submit a formal proposal in strict compliance with the solicitation requirements for each applicable requirement they seek an award of. The specific requirements will be defined at the delivery order level, and will encompass efforts such as preservation, structural/non-destructive testing, shipboard work, electrical services, component repair, and engineering support.
Efforts include performing drydock submarine repairs, maintenance and alterations at NNSY, PSNS and IMF, PHNSY and IMF, PNSY, TRFKB, TRFB, SUBASE New London, and NBPL and performing the repair and restoration of select critical components. Offerors are not required to have their own drydock. Work would be performed under delivery orders anticipated to be completed among MAC IDIQ awardees over a base period ending on 1 September 2030 with three additional option years concluding on 1 September 2033, previously established under N00024-25-R-4321 if all options are exercised.
The contract periods were established as follows: Base Period - Contract award through 1 September 2030; Option Year 1 - 2 September 2030 through 1 September 2031;Option Year 2 - 2 September 2031 through 1 September 2032; Option year 3 - 2 September 2032 through 1 September 2033.Any new awards made because of this Request for Proposal (RFP) will follow the same contract ordering period periodicity as provided above. The Navy will include rolling admissions provisions enabling the Navy to annually announcement an interim competition for the purpose of adding additional contractors to the MAC IDIQ.
The Navy has categorized each of these requirements (1, 2 and 3) to be procured under the MAC IDIQ into two tiers: Critical (Lot 1) and Non-Critical (Lot 2), as defined as follows: Critical (Lot 1) requirements consist of efforts that involve critical systems. Due to the nature of critical systems onboard the submarine the likelihood that delays in completing the work associated with these systems will have a significant impact on the overall availability schedule, the Navy will require contractors to possess capability and capacity to meet technical requirements for critical systems to be eligible for Lot 1 scope.
To complete this work, awardees are expected to have the knowledge, skills, and experience necessary to compete for multiple concurrent complex availabilities on critical systems. Critical systems (Lot 1), although not all inclusive, the following is a list of the most common critical systems. All systems listed imply areas of the system and equipment requiring work certifications that are not subject to special emphasis program controls (e.g., submarine safety program (SUBSAFE), fly by wire (FBW), deep submergence systems/scope of certification (DSS/SOC).Vertical Launch Systems (VLS)Ship control systems components Torpedo tube Bow planes Sonar Dome Large vertical array Shipboard hydraulics systems Normal fuel oil tank and systems Lube oil systems on-Critical (Lot 2) requirements consist of efforts that do not involve critical systems but may include systems and equipment requiring work certifications.
Lot 2 scope is expected to require fewer specialized contractor capabilities, both in terms of personnel and equipment. The Navy intends to issue Non-Critical (Lot 2) efforts under a Small Business Set-Aside.All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency.
DISCLAIMER: Prior Questions and Answers documentation provided with this RFP is for information purposes only. Interested parties should carefully review the current solicitation for any changes.
As published on SAM.gov.
Contacts
- Angel Jaeger, angel.jaeger.civ@us.navy.mil
- Kennedi Wilson, Kennedi.n.wilson.civ@us.navy.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Navy for the same kind of product (NAICS 336611, product code 1905) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| C460C, Provide Labor, Materials, Subcontractor, Other Direct Costs in Support of Requirement.HII Fleet Support Group LLC · N5523624F9961 | $13,014,465 | Nov 28, 2026within a month | CA |
| DDG 51 Class Lead Yard SupportBath Iron Works Corporation · N0002424C2313 | $196,934,405 | Nov 30, 2026within a month | ME |
| C460C, Provide Labor, Materials, Subcontractor, Other Direct Costs in Support of RequirementHII Fleet Support Group LLC · N5523624F9964 | $8,327,128 | Dec 3, 2026within a month | CA |
| C460C, Provide Labor, Materials, Subcontractor, Other Direct Costs in Support of Requirement.HII Fleet Support Group LLC · N5523624F9962 | $8,321,141 | Dec 5, 2026within a month | CA |
| C460C, Provide Labor, Materials, Subcontractor, Other Direct Costs in Support of Requirement.HII Fleet Support Group LLC · N5523624F9963 | $4,971,054 | Dec 5, 2026within a month | CA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 31, 5:00 PM ET36 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 336611, ship building and repairing, soonest deadline first.
- US Coast GuardAnchor windlass repair on USCGC Neah Bay, Cleveland, OH
- Department of the NavyPort boat davit OEM service at Sasebo, Japan
- Department of the NavyShip repair on USNS City of Bismarck, Busan, South Korea
- Department of the NavyShip repairs on USS Lewis B. Puller in Malaga, Spain
- Department of the ArmyArmy Watercraft Systems Roundtable
- Department of the NavyWatch supervisor chair parts for the Navy
- Department of the NavyPearl Harbor Naval Shipyard 2027 Technology Showcase
- Department of the NavyDive boat repair and preservation, Puget Sound, WA
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy