HVAC unit replacement at radar sites in NV and AZ
Replace two wall-mounted HVAC units and their controls at each of three National Weather Service radar sites: Battle Mountain, NV; Phoenix (Mesa), AZ; and Happy Jack (Flagstaff), AZ.
Official title: J--HVAC Unit Replacement
- Deadline
- Dec 1, 2:00 PM PT
- 6 days left
- Who can bid
- Small businesses
- Size standard for NAICS 238220: $19 million in average annual receipts · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: Dept of Commerce NOAA
What they're buying
On-site work must finish within 90 days after notice to proceed, and the full job within 240 days of award.
Top catches
“The quoter must submit the following by 2:00pm Pacific Time on November 20, 2026 via email to jack.huckleby@noaa.gov & jenna.taulman@noaa.gov: QUOTES RECEIVED AFTER THE TIME AND DATE AS SPECIFIED IN BLOCK EIGHT (8) OF THE SF 1449 MAY NOT BE ACCEPTED.” Sol_1305M327Q0010.pdf, page 41
The first notice said November 20 at 2:00 PM Pacific. Amendments 0002 and 0003 moved the deadline to Tuesday, December 1, 2026 at 2:00 PM Pacific. Your email must reach both addresses before that time.
“meet the small business size standard of the NAICS code associated with this RFQ is 236220” Sol_1305M327Q0010.pdf, page 41
The SAM record and cover page list NAICS 238220 with a $19.0M size standard, but Section 6 names NAICS 236220. Question 4 got only a See Question 1 answer. Check your size eligibility under both codes before you bid.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 7 of 12 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Safely remove and dispose of the existing Bard units, two per site, at Battle Mountain, Phoenix and Flagstaff.
- Furnish and install two Bard or equal wall-mounted, self-contained, air-cooled 6-ton units per site, 230/208/3 phase, 11.0 EER, that fit the existing concrete openings.
- Furnish and install a digital thermostat with at least 2 cooling stages, or equal, and replace thermostat wiring to the new units.
- Replace electrical wiring back to the junction box behind the units at a minimum. You may run new wiring to the electrical panel.
- Install a Bard MC 4002 lead/lag controller or equal, integrate AC alarms with the NEXRAD alarm system, and add compressor fail and dirty filter alarms.
- Verify operation, provide the schedule, SDS, warranty and biobased documents, and remove all debris from the site.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline moved to December 1. The first notice said November 20 at 2:00 PM Pacific. Amendments 0002 and 0003 moved the deadline to Tuesday, December 1, 2026 at 2:00 PM Pacific. Your email must reach both addresses before that time.
- NAICS code conflicts across notice. The SAM record and cover page list NAICS 238220 with a $19.0M size standard, but Section 6 names NAICS 236220. Question 4 got only a See Question 1 answer. Check your size eligibility under both codes before you bid.
- Full payment protection within 10 days. Within 10 days of award you must give a payment bond or irrevocable letter of credit for 100 percent of the contract price. It must cover the performance period plus one year. Price that cost into your quote.“The payment protection shall provide protection for the full contract performance period plus a one-year period.” Sol_1305M327Q0010.pdf, page 13
- Revised SOW says 6-ton units. Earlier SOW versions say 5 ton. The revised SOW dated November 23, 2026 says 6 ton and adds a thermostat and new wiring. Price the revised scope, since amendments override earlier documents.“that has two 6 ton BARD wall” SOW_1305M327Q0010_v2_0003.pdf, page 1
- Equipment lead time counts toward 240 days. On-site work has 90 days after the notice to proceed, but Factor 1 measures the schedule from receipt of equipment. The Q&A says the whole job, including ordering equipment, must finish within 240 days of award. Build equipment lead time into your schedule.“On site work shall be completed within ninety (90) calendar days after receiving the Notice to Proceed” SOW_1305M327Q0010_v2_0003.pdf, page 4
- Copied SOW text rated unacceptable. Your technical volume must show your own schedule with dates and two past HVAC projects. Copying or paraphrasing the SOW is rated Unacceptable. Keep all price out of Volume I.“Simply copying or paraphrasing SOW language will be rated Unacceptable.” Sol_1305M327Q0010.pdf, page 42
Key terms
| Who can bid | Small businesses only (total small business set-aside)Amendment 0001 says the set-aside is open to all qualifying small businesses, not only service-disabled veteran-owned firms.SAM.gov record |
|---|---|
| Contract period | 240 days from award; on-site work within 90 days of notice to proceedEquipment ordering and receipt count toward the 240 days.SOW_1305M327Q0010_v2_0003.pdf, page 4 |
| How they choose | Lowest price among technically acceptable quotesTwo pass/fail technical factors. Price is checked for completeness and reasonableness but not scored.Sol_1305M327Q0010.pdf, page 45 |
| How to submit | Email to jack.huckleby@noaa.gov and jenna.taulman@noaa.govTwo separate volumes, technical and price. Put RFQ 1305M327Q0010 in the subject line.Sol_1305M327Q0010.pdf, page 3 |
| Questions due | Closed: November 6, 2026 at 2:00 PM Pacific TimeAmendment 0003 says no further questions will be addressed.Sol_1305M327Q0010.pdf, page 3 |
| Estimated value | $52,800.00 to $72,800.00 (government price range)The notice calls this a total estimated price range for the procurement. It is not a stated award amount.Sol_1305M327Q0010.pdf, page 41 |
| Contract type | Firm-fixed-price purchase orderEach radar site is its own line item (CLIN 0001, 0002, 0003). Quotes for only some sites will not be accepted.Sol_1305M327Q0010.pdf, page 6 |
| Site visit | November 2, 2026 at 11:00 AM local time (already passed)A site visit was highly encouraged, not required. Quotes are allowed without one.Sol_1305M327Q0010.pdf, page 3 |
How to respond
- Email Volume I (technical quote, PDF, Times New Roman 12 point or larger, tables and graphics 10 point or larger) and Volume II (firm-fixed-price quote, PDF or Excel) to jack.huckleby@noaa.gov and jenna.taulman@noaa.gov.
- Put RFQ 1305M327Q0010 in the email subject line and send before 2:00 PM Pacific Time on Tuesday, December 1, 2026.
- Volume I: your approach, a dated schedule with start and end dates for each phase, and two completed commercial HVAC projects from the past three years. Keep all price out of Volume I.
- Volume II: price for each site (CLIN 0001 Battle Mountain, 0002 Phoenix, 0003 Flagstaff). Include point of contact, CAGE and UEI numbers, SAM registration, authorized negotiators, amendment acknowledgments, and signed representations. Quotes must stay valid for 90 days.
- Ask Jack Huckleby or Jenna Taulman to confirm receipt. The government does not accept responsibility for non-receipt of quotes.
Attached files
From SAM.gov. Download links open the original files.
- Appendix_A_0003.pdf Scanned image, not read.
- Apendix_A_0002.pdf Scanned image, not read.
- Sol_1305M327Q0010.pdfThe original combined solicitation with the SF 1442 offer form, line items, clauses and quoting instructions. Read it, and complete the offer block if you quote on the form. Read in part.
- SOW_1305M327Q0010_docx.pdfThe first SOW, which describes 5-ton units and appears superseded. Read only for background. Read in part.
- SOW_1305M327Q0010_v2_0001.pdfAn earlier revised SOW that appears superseded by the later revisions. Read only for background. Read in part.
- Battle_Mountain_Lander_County__DBA_WD___NV20260086.pdf Not read: over our length limit.
- FLAGSTAFF_DBA_WD___AZ20260043_pdf.pdf Not read: over our length limit.
- Sol_1305M327Q0010_Amd_0001.pdfAmendment 0001 removes two clauses, updates the Phoenix contact and answers 29 questions. Read it; there is no form to fill in. Read in part.
- PHOENIX_DBA_WD___AZ20260039_pdf.pdf Not read: over our length limit.
- Sol_1305M327Q0010_Amd_0002.pdfAmendment 0002 moves the quote due date to December 1, 2026 and restates the quoting instructions. Read it and acknowledge it in your quote. Read in part.
- SOW_1305M327Q0010_v2_0003.pdfThe current SOW dated November 23, 2026, with 6-ton units, a thermostat and wiring work. Read it and price from it; only part of it was provided. Read in part.
- Sol_1305M327Q0010_Amd_0003.pdfAmendment 0003 confirms the due date, closes questions, adds answers, and attaches the updated SOW and Appendix A. Read it and acknowledge it in your quote. Read in part.
Not stated in what we read
- Davis-Bacon wage rates: three wage determination files (NV20260086, AZ20260043, AZ20260039) were left out of this packet. I could not review them, so you must read them before you price labor.
- Site photos and Appendix A: Appendix_A_0003.pdf and Apendix_A_0002.pdf are scanned images with no extractable text. I could not review them, so you must read them.
- Notice to proceed date: Not stated. The Q&A says it is issued after the contractor confirms equipment and materials, with no date given.
- Fire/smoke device: the Q&A answer on who supplies and tests it is unclear, while the SOW says a field-supplied device is required.
- Thermostat and controller: the revised SOW lists a thermostat and a Bard MC 4002 controller under the same item 3.3, while the Q&A says no controller exists today. Whether both are required is not clear.
Notice text
HVAC Unit Replacement Amendment 0003
As published on SAM.gov.
Contacts
- HUCKLEBY, JACK, JACK.HUCKLEBY@NOAA.GOV
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 1, 2:00 PM PT6 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238220, plumbing, heating, and air-conditioning contractors, soonest deadline first.
- Department of Veterans AffairsControls Preventive Maintenance
- Department of Veterans AffairsChiller System Maintenance
- Department of the ArmyReplace two air handling units at Watervliet Arsenal, NY
- Bureau of Engraving and PrintingReplace air pollution oxidizer at Fort Worth, TX
- Departmental OfficesFire sprinklers and alarms at Honaunau park dorm, HI
- Departmental OfficesHeating leak repair at refuge visitor center, Homer, AK
- Department of Veterans AffairsBrine tank maintenance and salt delivery, Loma Linda, CA
- Department of Veterans AffairsAnnual Chiller Maintenance & Remote 24/7 Monitoring
Free · at most one email a morning
Get new notices from National Oceanic and Atmospheric Administration by email
Each morning we'll send the new solicitations and sources-sought notices from National Oceanic and Atmospheric Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy