- Opportunities
- Department of Defense
- Department of the Army
- W911KF25SC002A0018
Replace seven low-level cranes at Anniston Army Depot, AL
The Army wants seven low-level cranes replaced in Building 400 at Anniston Army Depot, Alabama, including removal of old cranes, new rails, installation, and load testing.
Official title: Low Level Cranes- CSO
- Deadline
- Nov 30, 10:00 AM CT
- 4 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- $336K
- Likely Sievert Electric Service and Sales Company
- Place
- Anniston, AL
- Buyer: W6QK ACC Anad
What they're buying
This is a Phase 1 solution submitted by email and due Monday, November 30, 2026, and no contract period or award is promised.
Top catches
“AoI Phase 1 Close Date: November 30, 2026, at 10:00 AM CDT.” Amendment - No.3.pdf, page 1
Amendment No. 3 says 10:00 AM CDT, but the SAM.gov record shows -06:00, which is one hour later. Plan to have your response in before 10:00 AM CDT, the earlier time.
“The requirement has been revised to provide a new cab because drawings for the existing cab are not available.” Low Level Cranes Industry Questions.pdf, page 2
The cab crane was changed from a retrofit of an existing cab to a new cab and crane at the Southwest end. Price a new crane with a new cab and pendant backup, not a retrofit.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 5 of 12 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Remove existing low-level cranes and dispose of them on the Depot as ANAD directs. The Q&A says eight cranes must be removed.
- Furnish and install seven new cranes: three 20-ton (one cab-operated), two 10-ton at about 95 ft, two 10-ton at about 51 ft, and seven 5-ton auxiliary hoists.
- Supply new rails and replace rails within each crane. Verify on site the 480-volt, 3-phase, 60 hertz power before ordering.
- Meet speed limits: main hoists up to 12 ft/min, auxiliary hoists up to 23 ft/min, trolley up to 80 ft/min, bridge up to 120 ft/min.
- Provide remote control on six cranes, with a physical pendant and two radio transmitters per crane. The cab-operated crane also needs a pendant backup.
- Run no-load and full-load acceptance tests in front of ANAD staff using your own labor and equipment. ANAD has a 30-ton test weight. Provide operator and maintenance training.
Who supplied it lately
$336K
on a recent contract for the same kind of product: Sievert Electric Service and Sales Company. It ends Dec 22, 2026.
Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.
What to watch for
- Deadline time zone conflict. Amendment No. 3 says 10:00 AM CDT, but the SAM.gov record shows -06:00, which is one hour later. Plan to have your response in before 10:00 AM CDT, the earlier time.
- Cab crane is now a new crane. The cab crane was changed from a retrofit of an existing cab to a new cab and crane at the Southwest end. Price a new crane with a new cab and pendant backup, not a retrofit.
- Email only, exact subject line. Solutions go only by email to two contacts, with the subject line exactly as written. Solutions received after the deadline are not evaluated, so send early and confirm receipt.“The email subject line must state: CSO-AoI A0018 Low Level Cranes.” CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf, page 4
- Seven or eight cranes to remove. The area of interest counts seven cranes, but the Q&A says eight must be removed and disposed of on the Depot. Price eight removals and confirm the count with the contracting officer.“removing a total of eight (8) cranes” Low Level Cranes Industry Questions.pdf, page 3
- Electrical drawings conflict. The Q&A says electrical drawings are attached, but another answer says drawings for the existing disconnects and controls are not available. Several drawing files could not be read, so review them yourself before pricing electrical work.“Drawings for the existing disconnects and controls are not available.” Low Level Cranes Industry Questions.pdf, page 4
- Response costs are not paid. The Government does not pay for your costs to respond, and award is not promised. Decide how much effort to spend before you start.“in no way obligates the Government for any costs incurred by the Offeror associated with developing a response” CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf, page 1
Key terms
| Who can bid | Open to interested parties; selected firms must be registered in SAM.govSet-aside: Not stated in the SAM.gov record.CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf, page 4 |
|---|---|
| How they choose | Merit-based: technical merit and delivery are equal; price must be fair and reasonableNot a lowest-price contest. Award is not guaranteed and depends on funds.CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf, page 3 |
| How to submit | Email your written solution to the two listed contactsSubject line must be CSO-AoI A0018 Low Level Cranes.CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf, page 4 |
| Questions due | Closed: 11/02/2026, 10:00 AM CDTAmendment No. 3 says no additional questions will be accepted.CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf, page 4 |
| Contract type | Commercial Solutions Opening (CSO) Phase 1 area of interestA later request for proposal or award is not guaranteed.CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf, page 1 |
| Site visit | Voluntary; was 10/28/2026 at 9:00am (passed)The RSVP date of 10/21/2026 has passed. The Government will not conduct an additional site visit.CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf, page 3 |
How to respond
- Write your Phase 1 solution and send it by email to Heather P. Robinson (heather.p.robinson.civ@army.mil) and Zena Johnson (zena.s.johnson.civ@army.mil).
- Use the subject line CSO-AoI A0018 Low Level Cranes.
- Send it before 10:00 AM CDT on Monday, November 30, 2026. Solutions received after the deadline are not evaluated.
- Clearly identify and fully describe any deviations, alternative approaches, or alternative delivery schedules. Page limits: Not stated.
- Required pricing detail and forms: Not stated. If selected, you must be registered in SAM.gov.
Attached files
From SAM.gov. Download links open the original files.
- Amendment - No.3.pdfAmendment 3 posts the industry Q&A, closes questions, and confirms the November 30, 2026 deadline. Read only; no form to sign. Read.
- Ind. Q. Image Low Level Cranes End View.jpg Could not be read.
- CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdfThe main Phase 1 notice with the equipment list, evaluation factors, and email submission rules. You respond by emailing a written solution; no form is listed. Read.
- Amendment - No 2- released.pdfAmendment 2 extended the deadline to November 30, 2026, and says answers will come later. Read only; the date is confirmed by Amendment 3. Read.
- Amendment - No 1- released.pdfAmendment 1 set a November 16, 2026 deadline, which later amendments replaced. Read only. Read.
- Ind. Q. 5 Image Crane Structure Rail Size.jpg Could not be read.
- Ind. Q. Image All Cranes End View.jpg Could not be read.
- Low Level Cranes- North Bay-.pdf Scanned image, not read.
- Drawings 2.png Could not be read.
- Drawings 1.png Could not be read.
- Drawings 3.png Could not be read.
- Low Level Cranes Industry Questions.pdfGovernment answers to 27 industry questions that change scope and details. Read it closely; it has no form to sign. Read.
Not stated in what we read
- Estimated value and funding amount: Not stated.
- Performance period, installation schedule, and shutdown dates: Not stated. The Government will provide shutdown windows, likely weekend nights.
- Phase 1 page limits, required pricing detail, and required forms: Not stated.
- Set-aside status and size standard: Not stated.
- Structural assessment is pending. Drawings, images, and a scanned North Bay file could not be reviewed, so you must read them yourself.
- Whether a later request for proposal will follow: Not stated.
Notice text
Low Level Cranes
As published on SAM.gov.
Contacts
- Zena Johnson, zena.s.johnson.civ@army.mil, 15206696059
- Heather P. Robinson, heather.p.robinson.civ@army.mil, 5715880969
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who has supplied this lately
Contracts at Department of the Army for the same kind of product (NAICS 333923, product code 3950) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| S2P2: VFDS for Bridge Cranes: Solicitation: W911S226U2385Sievert Electric Service and Sales Company · W911S226PA244 | $336,000 | Dec 22, 2026within a month | IL |
| Ripd-25-3-08 Section-4Kussmann Crane Inc · W519TC25P2365 | $696,641 | Dec 31, 2026in 1 month | IL |
| Winch, Drum, Power Op, NSN: 3950-20-010-1538G.T. Machining & Fabricating LTD. · W912CH26P0030 | $130,657 | Oct 17, 2026ended | Not stated |
| S2P2: MK 33 Loader Hoist: Solicitation: W911S226U2981Adam N Eve Safety LLC · W911S226PA464 | $103,320 | Oct 16, 2026ended | NJ |
| Shenango Hoist ReplacementTCB Veteran, LLC · W911WN26PA003 | $129,098 | Sep 30, 2026ended | PA |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 30, 10:00 AM CT4 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 333923, overhead traveling crane, hoist, and monorail system manufacturing, soonest deadline first.
- Defense Logistics AgencyFour fairlead rollers for DLA Distribution
- Department of the NavyTwo hoist blocks for USS Essex, San Diego, CA
- Defense Logistics AgencyNine chain hoists for DLA Distribution
- Defense Logistics AgencyTwo middle boom extensions for DLA San Joaquin
- Defense Logistics AgencySafe cable assemblies for DLA Cherry Point
- Defense Logistics Agency3 hydraulic power modules for DLA San Joaquin
- Defense Logistics AgencyLuff hoist wire ropes for Portsmouth Naval Shipyard, ME
- Defense Logistics AgencyPower drum winches, 7 units, for DLA San Joaquin
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy