Luff hoist wire ropes for Portsmouth Naval Shipyard, ME
DLA Maritime Portsmouth wants two replacement luff hoist wire ropes for Portal Crane at Portsmouth Naval Shipyard in Kittery, Maine, one port and one starboard, each at least 530 ft long, with delivery required by 2/1/2027.
Official title: Luff Hoist RRL & LRL Wire ropes
- Deadline
- Nov 30, 1:00 PM ET
- 4 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Kittery, ME
- Buyer: DLA Maritime - Portsmouth
What they're buying
Only small businesses may quote, and both ropes must be priced together because the government plans a single all-or-none award.
Top catches
“Be of right regular lay (LRL) lay type and lay direction.” SOW Hoist Wire Rope.pdf, page 5
The starboard spec says right regular lay but writes LRL, while item 0002 and the RFQ call it left regular lay. Ask the contracting specialist in writing which lay is required before you price item 0002.
“YM3 M8: Single Award for All Items” Notice text
The government plans one all-or-none award for all items. You cannot win only the port or only the starboard rope, so price and deliver both or do not bid.
Read by AI (Claude Haiku) on Nov 18, 2026 from the notice and 3 of 4 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Item 0001: one port luff hoist wire rope, right regular lay, at least 530 ft, one continuous length with no splices.
- Item 0002: one starboard luff hoist wire rope, at least 530 ft, one continuous length with no splices. Confirm the lay direction first (see catches).
- Each rope: ASTM A1023 6 x 36, 1-3/4 inch nominal diameter, pre-formed, bright uncoated, IWRC or steel core, minimum breaking strength 263,644 lbs.
- Open spelter socket (Crosby S-416, P/N 1039842, unpainted) at one end and welded link becket at the other. Socket pull test 79,750 lbs and a Charpy V-notch test report for each socket.
- Breaking strength test per ASTM A931-18 on a sample from the same reel. DCMA must be present for pre-delivery socket work. Code 700 inspects at destination.
- Ship on a metal spool with an extra empty metal spool of equal size, FOB destination, to Portsmouth Naval Shipyard Bldg 170.
Who supplied it lately
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Starboard rope lay conflict. The starboard spec says right regular lay but writes LRL, while item 0002 and the RFQ call it left regular lay. Ask the contracting specialist in writing which lay is required before you price item 0002.
- Single award for both ropes. The government plans one all-or-none award for all items. You cannot win only the port or only the starboard rope, so price and deliver both or do not bid.
- Traceability proof or quote rejected. If you are not the manufacturer, send proof of traceability with your quote, plus the manufacturer's name, location and business size. Missing proof can make your quote technically unacceptable under LPTA.“Failure to provide this information may result in your quotation being determined technically unacceptable.” Notice text
- Delivery date must be met. Your delivery time must meet or beat 2/1/2027 or your quote may be treated as non-responsive. The form also allows award on soonest delivery, so a late date can lose even with a low price.“The below Required Delivery Date (RDD) shall be met or exceeded in order to ensure your offer is considered responsive.” 27Q6006 RFQ Required.docx
- Email-only submission to two inboxes. Send the quote by email to both listed addresses before 1:00 PM ET on 11/30/2026. Keep proof of sending, since the notice gives no other way to deliver a quote.“Please submit quotes via email to: (Jannell.m.moriarty.civ@us.navy.mil), and PNSYSupplyQuotations@us.navy.mil” Notice text
- Socket pour needs qualified crew. The Navy manual says only personnel qualified under its rules may pour sockets, and qualification must be renewed every three years. Pages 44 to 113 of the manual were not provided to us, so read them before you bid.“Assign only personnel who have been qualified in accordance with paragraph 613-1.11.2.2.” NSTM S9086-UU-STM-010 Chapter 613 Rev 5 1JUN18 - Wire and Fiber Rope and Rigging.pdf, page 43
Key terms
| Who can bid | Small businesses only (100% small business set-aside)Size standard for NAICS 333923 is 1,250 employees, as the notice states.Notice text |
|---|---|
| How they choose | Lowest price technically acceptable, single award for all itemsThe RFQ form says award may be based on soonest delivery if no quote meets the required delivery date.27Q6006 RFQ Required.docx |
| How to submit | Email to Jannell.m.moriarty.civ@us.navy.mil and PNSYSupplyQuotations@us.navy.milQuotes must include prices, FOB point, CAGE code, contact details and completed representations.Notice text |
| Contract type | Commercial items purchase, fixed-price termsThe notice cites FAR Part 12 and a fixed-price changes clause.Notice text |
How to respond
- Complete the RFQ form for both items 0001 and 0002. Enter unit and total prices, delivered FOB destination, and a delivery time in calendar days that meets 2/1/2027. Fill in the representations and sign.
- Add the completed 252.204-7016 provision, your CAGE code, point of contact, business size under NAICS 333923, and your payment method (GPC or WAWF). If you are not the manufacturer, add manufacturer details and traceability proof.
- Attach descriptive literature showing how your rope meets each specification. The file format and size limits are not stated.
- Confirm your SAM registration is active. Email the complete quote to Jannell.m.moriarty.civ@us.navy.mil and PNSYSupplyQuotations@us.navy.mil before 1:00 PM ET on Monday, November 30, 2026.
Attached files
From SAM.gov. Download links open the original files.
- 27Q6006 RFQ Required.docxThis is the request for quote form with prices, delivery time, shipping, payment, business size and representations, and you must fill it in and sign it. Read.
- Clauses - Full Text Provisions and Clauses 11-4-2026.docx Not read: over our length limit.
- NSTM S9086-UU-STM-010 Chapter 613 Rev 5 1JUN18 - Wire and Fiber Rope and Rigging.pdfThis is a Navy manual on wire rope sockets and handling that the statement of work refers to, and you must read it; pages 44 to 113 were not provided to us. Read in part (pages 1–43 and 114–136 of 136).
- SOW Hoist Wire Rope.pdfThis is the statement of work with port and starboard rope specifications, inspection, testing, acceptance and submittal rules, and you must read and price to it. Read.
Not stated in what we read
- We could not review the full clause text file (Clauses + Full Text Provisions and Clauses 11-4-2026.docx) or the local clause full text. You must read them yourself.
- Pages 44 to 113 of the Navy manual were not provided, and they contain the socket fabrication rules the statement of work requires. You must read them.
- The DCMA Quality Assurance Letter of Instruction is referenced but is not attached to this notice. Ask the contracting specialist for it.
- The warranty period for corrected deficient items is not stated.
- The quote validity period is blank on the RFQ form and is not stated elsewhere.
- The deadline for questions is not stated.
Notice text
This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with the information in FAR part 12, as supplemented with the additional information included in this notice. This announcement constitutes the only solicitation; a written solicitation will not be issued. PAPER COPIES OF THIS SOLICITATION WILL NOT BE AVAILABLE. This combined synopsis/solicitation SHALL be posted to SAM.gov. The RFQ number is (SPMYM327Q6006). This solicitation documents and incorporates provisions and clauses in effect through FAC 2026-01 March 13, 202, and DFARS Change Notice 20260702.
It is the responsibility of the contractor to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at this address: https://www.ecfr.gov, https://www.acquisition.gov/content/list-sections-affected, and http://www.acq.osd.mil/dpap/dars/change_notices.html The FSC Code is (4010) and the NAICS code is (333923). The Small Business Standard is 1,250 employees. This requirement is being processed utilizing a 100% small business set-aside.
Evaluation criteria is Lowest Price Technically Acceptable (LPTA). SPRS will be used to determine vendor responsibility. Potential contractors will be screened for responsibility in accordance with FAR 9.104. Offerors are required to submit descriptive literature to show how their quotation meets the required specifications. All vendors must complete the attached request for quote paperwork titled, “27Q6006 RFQ Required”. If not the manufacturer, proof of traceability is required to be submitted with the quote.
Failure to provide this information may result in your quotation being determined technically unacceptable. DCMA is required to be present during section 3.3 Pre-Delivery on the statement of work (SOW). The Portsmouth Naval Shipyard requests responses from qualified sources capable of providing: ITEM DESCRIPTION 0001 Port Luff Hoist Wire Rope, Right Regular Lay (RRL) Luff Hoist RRL Wire rope IAW the attached Statement of Work and the requirements for a Quality Assurance Letter of Instruction (DCMA required).
0002 Starboard Luff Hoist Wire Rope, Left Regular Lay (LRL) Luff Hoist LRL Wire rope IAW the attached Statement of Work and the requirements for a Quality Assurance Letter of Instruction (DCMA required). NOTE: OFFERORS MUST COMPLETE THE ATTACHED PROVISIONS 252.204-7016 AND INCLUDE THE COMPLETED PROVISIONS WITH THEIR OFFER. Clause/Provision & Title 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements 52.204-7 System for Award Management 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards 52.204-13 System for Award Management Maintenance 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law 52.211-14 Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment 52.211-15 Defense Priority and Allocation Requirements 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services 52.212-2 Evaluation—Commercial Products and Commercial Services 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services 52.219-6 Notice of Total Small Business Set-Aside 52.219-28 Post-Award Small Business Program Representation 52.222-3 Convict Labor 52.222-19 Child Labor—Cooperation with Authorities and Remedies 52.222-36 Equal Opportunity for Workers with Disabilities 52.222-50 Combating Trafficking in Persons 52.222-90 Addressing DEI Discrimination by Federal Contractors 52.223-11 Ozone-Depleting Substances 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving 52.232-33 Payment by Electronic Funds Transfer—System for Award Management 52.232-34 Payment by Electronic Funds Transfer—Other than System for Award Management 52.232-36 Payment by Third Party 52.232-39 Unenforceability of Unauthorized Obligations 52.232-40 Providing Accelerated Payments to Small Business Subcontractors 52.233-3 Protest after Award 52.233-4 Applicable Law for Breach of Contract Claim 52.240-90 Security Prohibitions and Exclusions Representations and Certifications **See attached clauses and provisions for full text** 52.240-91 Security Prohibitions and Exclusions **See attached clauses and provisions for full text** 52.240-93 Basic Safeguarding of Covered Contractor Information Systems **See attached clauses and provisions for full text** 52.242-15 Stop-Work Order 52.242-17 Government Delay of Work 52.243-1 Changes—Fixed Price 52.246-1 Contractor Inspection Requirements 52.247-34 F.o.b. Destination 52.252-1 Solicitation Provisions Incorporated by Reference **See attached clauses and provisions for full text** 52.252-2 Clauses Incorporated by Reference **See attached clauses and provisions for full text** 52.252-5 Authorized Deviations in Provisions **See attached clauses and provisions for full text** 52.252-6 Authorized Deviations in Clauses **See attached clauses and provisions for full text** DFARS CLAUSES AND PROVISIONS Clause/Provision & Title 252.203-7000 Requirements Relating to Compensation of Former DoD Officials 252.203-7002 Requirement to Inform Employees of Whistleblower Rights 252.203-7005 Representation Relating to Compensation of Former DoD Officials 252.204-7003 Control of Government Personnel Work Product 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support 252.204-7016 Covered Defense Telecommunications Equipment or Services--Representation 252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services--Representation 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services 252.240-7997 NIST SP 800-171 DoD Assessment Requirements.
252.204-7022 Expediting Contract Closeout 252.204-7024 Notice on the use of the Supplier Performance Risk System 252.211-7003 Item Unique Identification and Valuation "Exempted from IUID by Military Service Customer. Supplier should check IUID exemption box in WAWF" 252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors 252.223-7008 Prohibition of Hexavalent Chromium 252.225-7000 Buy American--Balance of Payments Program Certificate—Basic 252.225-7001 Buy American and Balance of Payments Program—Basic 252.225-7002 Qualifying Country Sources as Subcontractors 252.225-7012 Preference for Certain Domestic Commodities 252.225-7048 Export-Controlled Items 252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region–Representation 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region 252.231-7000 Supplemental Cost Principles 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports 252.232-7006 Wide Area WorkFlow Payment Instructions **See attached clauses and provisions for full text** 252.232-7010 Levies on Contract Payments 252.243-7001 Pricing of Contract Modifications 252.244-7000 Subcontracts for Commercial Products or Commercial Services.
252.247-7023 Transportation of Supplies by Sea--Basic 5452.233-9001 Disputes: Agreement To Use Alternative Dispute Resolution (ADR) **See attached clauses and provisions for full text** DLA PROCUREMENT NOTES (See Attachment for Full Text) C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016) C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2023) C04 Unused Former Government Surplus Property (SEP 2021) C14 Repackaging or Relabeling to Correct Deficiencies (MAY 2020) C20 Vendor Shipment Module (VSM) (MAY 2026) E05 Product Verification Testing (MAY 2020) H10 Requires No Access to DLA Controlled Technical Data or Information for Contract Performance (MAY 2024) H18 Defense Priorities and Allocations System (DPAS) (JUL 2026) L06 Agency Protests (DEC 2016) L08 Use of Supplier Performance Risk System (SPRS) in Past Performance Evaluations (JUN 2024) L09 Reverse Auction (OCT 2016) L10 Competing Individual Delivery Orders Through Reverse Auctions (OCT 2016) L31 Additive Manufacturing (JUN 2018) M05 Evaluation Factor for Unused Former Government Surplus Property (SEP 2016) LOCAL CLAUSES (See Attachment for Full Text) YM3 A1: Additional Information YM3 A3: Government Purchase Card Method of Payment Additional Info (When GCPC Payment) YM3 C500: Mercury Control (Supplies) YM3 C528: Specification Changes YM3 D2.2: Marking of Shipments YM3 D4: Preparation for Delivery YM3 D8: Prohibited Packing Materials YM3 E2: Inspection and Acceptance (Destination) YM3 E4: Disposition of Nonconforming Material YM3 F500: Consignment Instructions for Deliveries to the Portsmouth Naval Shipyard YM3 M8: Single Award for All Items This announcement will close (11/30/2026 1pm ET).
The Point of Contact for this solicitation is Jannell Moriarty who can be reached at jannell.m.moriarty.civ@us.navy.mil. All responsible sources may submit a quote which shall be considered by the agency. System for Award Management (SAM). Quoters must be registered in the SAM database to be considered for award. Registration is free and can be completed online at http://www.sam.gov/. If not the actual manufacturer the manufacturer’s name, location, and business size must be provided.
Please submit quotes via email to: (Jannell.m.moriarty.civ@us.navy.mil), and PNSYSupplyQuotations@us.navy.mil All quotes shall include price(s), FOB point, Cage Code, a point of contact, name and phone number, GSA contract number if applicable, business size under the NAICS Code, whether or not your company prefers payment by Government Commercial Purchase Card (GCPC)* or Wide Area Workflow (WAWF). Please note that the Government’s terms for payment for this requirement are Net 30 Days AFTER acceptance of material.
Please note, if selecting GPC, the Government does NOT utilize third party payment entities (Zelle, Venmo, PayPal, etc.) Each response must clearly indicate the capability of the quoter to meet all specifications and requirements. *If selecting GCPC as the preferred method of payment, please be advised that per DFARS 232.7002, a receiving report MUST be entered into WAWF.
As published on SAM.gov.
Contacts
- Jannell Moriarty, jannell.m.moriarty.civ@us.navy.mil, 2074386395
- DLA-KME PNSY EMAIL BOX, PNSYsupplyquotations@us.navy.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Nov 30, 1:00 PM ET4 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 333923, overhead traveling crane, hoist, and monorail system manufacturing, soonest deadline first.
- Defense Logistics AgencyFour fairlead rollers for DLA Distribution
- Department of the NavyTwo hoist blocks for USS Essex, San Diego, CA
- Defense Logistics AgencyNine chain hoists for DLA Distribution
- Defense Logistics AgencyTwo middle boom extensions for DLA San Joaquin
- Defense Logistics AgencySafe cable assemblies for DLA Cherry Point
- Defense Logistics Agency3 hydraulic power modules for DLA San Joaquin
- Department of the ArmyReplace seven low-level cranes at Anniston Army Depot, AL
- Defense Logistics AgencyPower drum winches, 7 units, for DLA San Joaquin
Free · at most one email a morning
Get new notices from Defense Logistics Agency by email
Each morning we'll send the new solicitations and sources-sought notices from Defense Logistics Agency, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy