1. Opportunities
  2. Department of Defense
  3. Department of the Army
  4. W911KB27BA005

Lowell Creek Tunnel repairs and new rails, Seward, Alaska

The Department of the Army, through W2SN ENDIST Alaska, is buying repairs to worn areas of the Lowell Creek Tunnel through Bear Mountain in Seward, Alaska, plus installation of new center rails in the tunnel, which is about 2,100 feet long.

Official title: Lowell Creek Tunnel Repairs, Seward, Alaska

Deadline
Dec 23, 2:00 PM AKT
28 days left
Who can bid
Not stated
The notice names no set-aside
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: W2SN Endist Alaska

What they're buying

The work is firm-fixed price under an invitation for bid, and no period of performance is stated.

Top catches

Wage rates not provided
“Construction wage rates (formerly Davis Bacon Act wage rates) shall apply.” Notice text

Construction wage rates apply to this job, but the rates are not in the notice text, and no attachments are listed. Ask the contracting office for the wage determination before you price labor.

Firm-fixed price carries cost risk
“The type of contract shall be firm-fixed price.” Notice text

A firm-fixed price means the price you bid is the price you get paid, even if your costs rise. Likely, you carry the risk of the repair work on worn areas, so add margin for unknowns in your price. Likely, not stated outright.

2 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Repair the worn areas of the Lowell Creek Tunnel, about 2,100 feet long
  • Install new center rails in the tunnel
  • Furnish all labor, equipment, supplies, materials, supervision, and other items and services
  • Comply with commercial and industry standards and all applicable federal, state, and local laws

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Wage rates not provided. Construction wage rates apply to this job, but the rates are not in the notice text, and no attachments are listed. Ask the contracting office for the wage determination before you price labor.
  • Firm-fixed price carries cost risk. A firm-fixed price means the price you bid is the price you get paid, even if your costs rise. Likely, you carry the risk of the repair work on worn areas, so add margin for unknowns in your price.
  • Defense priority rating applies. This is a rated defense order (DO-C2). The clause it refers to, FAR 52.211-15, is not in the notice, so read it before you bid. It may affect how you accept and schedule the work.“DPAS Rating: DO-C2, Refer to Clause FAR 52.211-15, Defense Priority and Allocation Requirements.” Notice text
  • Open to all sizes, criteria unlisted. No set-aside is shown, so you compete against all bidders, large and small. The notice lists a $45 Million size standard but does not list the responsibility criteria you must meet, so ask for them.“Full and Open Competition, Invitation for Bid with Definitive Responsibility Criteria” Notice text

Key terms

Who can bidFull and open competition, no set-aside shownNotice lists NAICS 237990 with a $45 Million size standard.Notice text
Contract typeFirm-fixed priceConstruction wage rates apply, but the rates are not given in the text.Notice text

How to respond

  1. Look for bid submission instructions on this SAM.gov notice. The notice text does not say where or how to send your bid.
  2. Ask the contracting office for the wage determination and the definitive responsibility criteria before the deadline, since neither is in the notice.
  3. Read FAR 52.211-15 to understand the defense priority rating obligations before you commit to a price.
  4. Submit your bid by Wednesday, 2026-12-23, 14:00:00 at -09:00. Convert this to your local time and submit early.

Not stated in what we read

  • How and where to submit the bid, and whether a questions deadline applies
  • Estimated contract value or budget
  • Period of performance or completion date
  • Wage determination rates that apply to the labor
  • How the winning bid will be chosen and what the responsibility criteria are
  • Whether a site visit or pre-bid meeting is required

Notice text

Project Title: Lowell Creek Tunnel Repairs Project Location: Seward, AK NAICS 237990, Size Standard $45 Million Full and Open Competition, Invitation for Bid with Definitive Responsibility Criteria DPAS Rating: DO-C2, Refer to Clause FAR 52.211-15, Defense Priority and Allocation Requirements. Description of Work: The Lowell Creek Tunnel Repairs project will perform repairs of worn areas and install new center rails of the Lowell Creek Tunnel which is an approximately 2,100 feet long tunnel through Bear Mountain on the southwest side of Seward, Alaska.

The contractor is to furnish all labor, equipment, supplies, materials, supervision, and other items and services necessary to accomplish the work. The contractor shall comply with commercial and industry standards as well as all applicable federal, state, and local laws, regulations, and procedures. The type of contract shall be firm-fixed price. Construction wage rates (formerly Davis Bacon Act wage rates) shall apply.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy