- Opportunities
- Department of Defense
- Department of the Air Force
- FA8903-27-OT-001
Airfield pavement and lighting work, San Antonio, TX
The Air Force wants a commercial partner to design, then build, airfield pavement, lighting, drainage and utility work such as runways, taxiways and aprons.
Official title: MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
- Deadline
- Jan 15, 2027, 10:00 AM CT
- 51 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- San Antonio, TX
- Buyer: FA8903 772 Ess PK
What they're buying
You first submit a five-page Solution Brief; the contract length and total value are not stated.
Top catches
“Include examples of at least three completed airfield pavement projects on DoW installations or commercial FAA Part 139 airport projects within the past 10 years and with a project value exceeding $10M.” MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
Check your past work before you spend time on the brief. The brief must show three completed airfield pavement projects, each over $10M, in the past 10 years. If you do not have them, you likely cannot pass the credentials review.
“Place of performance: San Antonio, TX, 78226, USA” SAM.gov record
The SAM.gov record gives one city, San Antonio. Attachment 1 lists sample projects at several bases, including Alaska and Wake Island, and says the list is not all inclusive. Ask the contracting office which sites are in scope before you plan travel, crews and pricing.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 2 of 2 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Airfield pavement repair, replacement and new paving of runways, taxiways, aprons, shoulders, holding pads and access roads
- Airfield lighting and visual aids, including runway and taxiway lights, approach lighting, PAPIs, ALCMS and MAAS foundations
- Civil and drainage work: stormwater networks, culverts, detention basins, erosion control and perimeter fencing
- Subsurface utilities: duct banks, grounding grids, communication ductways and fuel distribution pathways
- Phase 1 design and planning: design advanced to about 35% to 65%, open-book GMP package, preliminary schedule and risk strategy
- Phase 2 final design and construction: 100% stamped drawings and physical construction within the negotiated GMP ceiling
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Three $10M airfield projects required. Check your past work before you spend time on the brief. The brief must show three completed airfield pavement projects, each over $10M, in the past 10 years. If you do not have them, you likely cannot pass the credentials review.
- Place of work conflicts across sources. The SAM.gov record gives one city, San Antonio. Attachment 1 lists sample projects at several bases, including Alaska and Wake Island, and says the list is not all inclusive. Ask the contracting office which sites are in scope before you plan travel, crews and pricing.
- Umbrella notice terms not provided. This AOI incorporates the MACH-1 Umbrella Program Notice by reference, including data rights and repository terms. That notice was not provided with this record. Get and read it before you submit, because it governs data rights and the solutions repository.“All provisions, submission rules, statutory authorities (10 U.S.C. § 2808a), and data rights/repository terms set forth in the MACH-1 Umbrella Program Notice” MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
- Invitation to later phases not assured. A brief does not guarantee a bid. The government may invite few firms to Phase 2, and it may pick a single respondent directly. Your brief stays in the repository for 12 months, so later requirements may invite you without a new notice.“The Government reserves the right to limit the number of companies invited to Phase 2.” MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
- Price set later with off-ramps. The end goal is a Guaranteed Maximum Price, which may be developed after award during design. The text says off-ramps apply if costs cannot be agreed. Ask how these off-ramps work and state your site and subsurface assumptions in any price you give.“incorporating established 'off-ramps' if an agreement on final construction costs cannot be reached.” MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx
Key terms
| Who can bid | Any firm; no set-aside usedYou must show airfield pavement experience and must not be on the federal excluded parties list.SAM.gov record |
|---|---|
| How they choose | Phased selection: brief, then possible pitch, then full proposalPhase 1 is judged on relevance, constructability, company viability and schedule risk.MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx |
| How to submit | Email the Phase 1 Solution Brief to 772ESS.PKA.MACH1@us.af.milThe subject line must include the AOI Notice ID. The brief is limited to five pages.MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx |
| Contract type | Other Transaction Agreement (OTA)The agreement is negotiated under 10 U.S.C. § 2808a, and Phase 3 includes direct negotiation.MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx |
How to respond
- Read the AOI and the MACH-1 Umbrella Program Notice (FA8903-OT-MACH1). The AOI incorporates the umbrella notice by reference, and that notice was not provided here.
- Write a Phase 1 Solution Brief of no more than five pages. The title page does not count, and the executive summary is limited to one page. The title page needs company name, title, date, point of contact (name, email, phone) and address, and must name this AOI.
- Include at least three completed airfield pavement projects over $10M from the past 10 years, and your company overview, revenue and go-to-market strategy.
- Email the brief to 772ESS.PKA.MACH1@us.af.mil by 15 January 2027, 10:00 AM CST, with FA8903-27-OT-001 Horizontal Airfield Infrastructure in the subject line.
Attached files
From SAM.gov. Download links open the original files.
- MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docxThe AOI itself, with scope, phases, evaluation criteria and submission rules. You must read it and respond with a Phase 1 Solution Brief. Read.
- ATTACHMENT_1__PROJECT_LISTINGS.docxA list of sample airfield projects at other bases, given as examples only. You need to read it for context; it is not a form to fill in or sign. Read.
Not stated in what we read
- Estimated total value of the work: Not stated.
- Length of the contract or schedule for design and construction: Not stated.
- Which sites are in scope, and whether the work is at San Antonio or at the bases listed in Attachment 1.
- Contents of the MACH-1 Umbrella Program Notice, including data rights in paragraphs 3.3 and 3.4.
- Whether teaming with a firm that has the three qualifying projects is allowed: Not stated.
- Whether a site visit or question period is offered: Not stated.
Notice text
The scope of this AOI encompasses planning, design, engineering, alteration, repair, and physical construction for airfield pavement assets and associated systems. Incidental civil, electrical, mechanical, utility, environmental, and site work directly supporting the primary airfield infrastructure is authorized and included within this scope. All facility types, infrastructure systems, technical specialties, and testing capabilities identified throughout this document are expressly illustrative and non-exhaustive, including but not limited to: Horizontal airfield pavements and operating surfaces, including but not limited to runways, taxiways, aircraft parking aprons, arm/de-arm pads, compass swing bases, holding pads, alert pads, aircraft wash-rack pavements, access roadways, perimeter security paths, and all associated horizontal airfield pavements.
Airfield visual and electrical systems, including but not limited to runway edge and centerline lighting, threshold and end lighting, taxiway guidance lighting, approach lighting systems, precision approach path indicators (PAPIs), airfield signage, electrical duct banks, vault infrastructure, counterpoise grounding grids, automated Airfield Lighting Control and Monitoring Systems (ALCMS), mobile aircraft arresting systems (MAAS), and related navigational and visual aids.
Civil, drainage, and safety infrastructure, including but not limited to subsurface stormwater drainage networks, detention and retention basins, culverts, erosion and sediment control systems, aircraft arresting system foundations and containment vaults, blast deflectors, airfield perimeter security fencing, and related site-civil infrastructure. Subsurface utility corridors and distribution, including but not limited to utility distribution pathways, aircraft grounding grids, communication ductways, fuel servicing distribution pathways supporting horizontal operations, and associated utility routing.
All other civil, geotechnical, electrical, safety, and operational horizontal airfield infrastructure elements necessary to meet mission requirements, regardless of whether specifically itemized above.
As published on SAM.gov.
Contacts
- 772 ESS/PKA, 772ESS.PKA.MACH1@us.af.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Jan 15, 2027, 10:00 AM CT51 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237990, other heavy and civil engineering construction, soonest deadline first.
- Department of Veterans AffairsStormwater upgrades at Crown Hill cemetery, Indianapolis, IN
- Bureau of Indian Affairs96-inch culvert replacement on BIA Route 3, Cibecue, AZ
- Department of the ArmyNew baseball stadium at USAF Academy, Colorado Springs, CO
- Department of the ArmyLock and dam rehabilitation, Chicago, Illinois
- Department of the ArmyDredge containment repairs, Savannah and Brunswick, GA
- Departmental OfficesWater recirculation pipeline and pump, Pixley refuge, CA
- Department of the ArmyMaintenance dredging task orders, South Atlantic region
- Department of the ArmyTainter valve repair at The Dalles Lock and Dam, WA
Free · at most one email a morning
Get new notices from Department of the Air Force by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy