Fuel tank and fueling facility repairs at Mather, CA

You would add gauges, a catwalk, collision barriers and alarms to a 12,000-gallon fuel tank, fix drainage and pavement, replace the POL Ops building and move a generator at Mather, CA.

Official title: Mather Fueling System Repairs

Deadline
Dec 18, 2:00 PM CT
22 days left
Who can bid
Small businesses
Size standard for NAICS 237120: $45 million in average annual receipts · Who qualifies
Last time
$6.04M
Likely Ses Energy Services LLC
Place
Mather, CA
Buyer: W071 Endist Omaha

What they're buying

The work is design-build at a firm fixed price, the project size is stated as $1,000,000 to $5,000,000, and you have 365 calendar days to finish.

Top catches

Deadline dates conflict
“2026-12-18T14:00:00-06:00” SAM.gov record

SAM.gov lists 2:00 PM on 18 December 2026, but the solicitation form lists 2:00 PM on 20 November 2026, which has already passed. Get the correct date in writing from the contract specialist before you spend time on the bid.

Design is part of your price
“Prices include both design and construction.” Solicitation - W9128F27RA045.pdf, page 3

This is design-build work, so each price must cover both design and construction. An offer without a full price may be found unacceptable, so confirm you have a qualified designer before you price it.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 3 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Tank: install a sampling gauge hatch and a clock gauge on manways, recoat the exterior, add a catwalk across the full tank, replace collision barriers, and replace audible and visual alarms.
  • Drainage: repair the pipe between the remote containment basin and the drain inlet, slope it positively, and restore the pavement over it.
  • Pavement: replace asphalt on the northeast side of the fueling facility, repair the refueler parking concrete, and repair the asphalt-to-concrete transition.
  • Offload area: replace asphalt near the loading and unloading area with a concrete path that drains to the existing drain inlet.
  • Dispenser and ATG: replace the dispenser fuel monitor with a non-coalescing filter, add a hand-pump water draw-off, and supply, install and test the ATG system.
  • POL building and generator: replace the POL Ops building at the same size and location with heating, cooling and electrical, and relocate the generator to a new pad outside the compartment.

Who did it before

$6.04M

on the contract that likely holds this work now: Ses Energy Services LLC. It ended Oct 16, 2026.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • Deadline dates conflict. SAM.gov lists 2:00 PM on 18 December 2026, but the solicitation form lists 2:00 PM on 20 November 2026, which has already passed. Get the correct date in writing from the contract specialist before you spend time on the bid.
  • Design is part of your price. This is design-build work, so each price must cover both design and construction. An offer without a full price may be found unacceptable, so confirm you have a qualified designer before you price it.
  • Bid walk date missing. Your questions are due 14 calendar days after the bid walk, but the text does not give the bid walk date. Ask the contract specialist for that date now and submit questions through ProjNet.“No Later Than 14 calendar days after the bid walk” Solicitation - W9128F27RA045.pdf, page 8
  • Wage rates not reviewed. The solicitation lists a Davis-Bacon wage determination, CA20260007, and includes wage rate clauses. That file was not included here, so you must get it from the solicitation and price labor against it before you bid.“Davis Bacon Wage Determinations - CA20260007” Solicitation - W9128F27RA045.pdf, page 19
  • Daily delay penalty and bonds. You owe $1,070 for each calendar day of delay. Performance and payment bonds are also due within 10 calendar days after award, so get surety quotes before you bid.“in the amount of $1,070.00 for each calendar day of delay until the work is completed or accepted.” Solicitation - W9128F27RA045.pdf, page 28
  • Options count toward evaluation. Options 0010 to 0012 cover petroleum-contaminated soil, lead and chromium paint, and asbestos. The Government may not exercise them, but it adds their prices to your base price when it evaluates offers, so price them carefully.“the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement.” Solicitation - W9128F27RA045.pdf, page 3

Key terms

Who can bidSmall businesses only (total set-aside)The size standard for NAICS 237120 is not stated in the text reviewed.SAM.gov record
Contract periodComplete within 365 calendar days of notice to proceedYou must begin performance within 10 calendar days after receiving notice to proceed.Solicitation - W9128F27RA045.pdf, page 1
How they chooseFirm fixed price; award without discussionsThe evaluation criteria are in the Mather Selection Criteria file, which was not included.Solicitation - W9128F27RA045.pdf, page 9
How to submitSealed offer delivered to the Omaha District contracting office, 1616 Capitol Avenue, Omaha, NE 68102-4901Mark the envelope with your name and address, the solicitation number and the due date and time.Solicitation - W9128F27RA045.pdf, page 1
Questions dueNo later than 14 calendar days after the bid walkThe bid walk date is not stated. Submit technical questions through ProjNet Bidder Inquiry.Solicitation - W9128F27RA045.pdf, page 8
Estimated valueBetween $1,000,000 and $5,000,000This is the project magnitude given in the solicitation. No exact estimate is stated.Solicitation - W9128F27RA045.pdf, page 9
Contract typeFirm fixed price, design-buildYour price must cover both the design and the construction.Solicitation - W9128F27RA045.pdf, page 11
Site visitA bid walk is referenced; its date and whether attendance is required are not statedThe text does not say whether the bid walk is mandatory.Solicitation - W9128F27RA045.pdf, page 8

How to respond

  1. Confirm the due date in writing with the contract specialist, Samuel Obrist (samuel.v.obrist@usace.army.mil), because the solicitation form and SAM.gov give different dates.
  2. Register for ProjNet Bidder Inquiry and submit all technical questions no later than 14 calendar days after the bid walk. The bid walk date is not stated.
  3. Price design and construction together as one lump-sum price for each of items 0001 through 0009, and price options 0010 through 0012 because they count in evaluation.
  4. Complete and sign Standard Form 1442, including the offer, the amount of days the price stays valid and any amendments you received. The number of copies to submit is not stated.
  5. Seal the offer, mark it with your name, address, solicitation number W9128F27RA045 and the due date and time, and deliver it to W071 ENDIST Omaha, KO Contracting Office, 1616 Capitol Avenue, Omaha, NE 68102-4901 before the deadline.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Whether a bid walk will be held, its date, and whether attendance is required.
  • Whether the Davis-Bacon wage determination CA20260007 and the Mather Selection Criteria file change your labor or evaluation position; neither file was included, so you must read them yourself.
  • Whether the tank holds AVGAS or F-24 jet fuel. The notice says AVGAS, but the drawings and Section 01 00 00 say F-24 jet fuel.
  • Specification pages 37 to 259 were not provided, so I could not review them; you must read them.
  • The number of copies of the offer to submit, and the evaluation method for award.
  • The current contractor and whether there is any existing work history for this site.

Notice text

Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the entirety of the tank, and replace the audible and visual alarms. o Fix the remote containment basin drainage issue. o Replace the asphalt on the NE side of the fueling facility. o Repair the refueler parking concrete. o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump. o Replace the asphalt near the loading/unloading facility with a concrete path. o Replace POL building of the same size and at the same location. o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS. o Relocate the generator that is inside the compartmentalized area.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at Department of the Army for the same kind of work (NAICS 237120, service code Y1GC) in California that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

ContractObligatedEndsState
SRM Edwards MSS Transfer Line Hydrant 3Ses Energy Services LLC · W9128F24C0025$6,044,009Oct 16, 2026endedCA
Vandenberg 1703 Tank RepairsDawson Enterprises, Inc. · W9128F26FA018$6,154,157Feb 22, 2027in 2 monthsCA
Vandenberg SFB-Fueling System Repairs 1709Dawson Enterprises, Inc. · W9128F24F0270$4,253,922Aug 29, 2026endedCA

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 26, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy