1. Opportunities
  2. Department of Defense
  3. Department of the Navy
  4. N6134026Q1029

Three oxygen cart frames for Navy, Orlando, FL

The Naval Air Warfare Center Training Systems Division wants three fully assembled oxygen (O2) carts, built from Government design files, delivered to Orlando, FL within 15 weeks of award.

Official title: O2 Carts Trailer Frame

Deadline
Dec 7, 10:00 AM ET
11 days left
Who can bid
Any business
Registered in SAM.gov · How to register
Last time
$242K
Likely Micro-Tec, Inc.
Place
Orlando, FL
Buyer: NAWC Training Systems Div

What they're buying

Quotes are due Monday, 7 December 2026 at 10:00 AM Eastern Standard Time, and the award goes to the lowest priced quote that is technically acceptable.

Top catches

CMMC Level 2 needed before award
“The Offeror will not be eligible for award of a contract, task order, or delivery order resulting from this solicitation if the Offeror does not have” Solicitation - N6134026Q1029.pdf, page 25

You cannot win unless your CMMC Level 2 (Self) status is on record in SPRS before award, and it must stay current for the whole contract. Check your status now and list your CMMC UIDs in your quote.

Restricted design files
“have been determined to be Distribution Statement D (DoD and U.S. DoD Contractors only)” O2 Carts Combined Synopsis Solicitation.docx

The design files are limited to DoD and DoD contractors and may not go to vendors without Government approval. Request the files from the contract specialist now and confirm you qualify before you spend time on a quote.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 3 of 3 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Three fully assembled O2 carts built to TDP 10226 and Build List 101926 (CLIN 0001).
  • Parts in low-carbon steel and Aluminum 5052, many painted, held to the build list tolerances and finishes.
  • Stock parts follow manufacturer tolerances; any specialized gauge needs Government approval before use.
  • Delivery to NAWCTSD, 12211 Science Drive, Orlando, FL, within 15 weeks after award.
  • DoD unique item identification on the line item, per DFARS 252.211-7003.
  • Government inspection at delivery, with acceptance by DD Form 250 in WAWF.

Who supplied it lately

$242K

on a recent contract for the same kind of product: Micro-Tec, Inc.. It ends Nov 27, 2026.

Matched in USAspending.gov by agency, NAICS and product code; notices rarely name the supplier.

What to watch for

  • CMMC Level 2 needed before award. You cannot win unless your CMMC Level 2 (Self) status is on record in SPRS before award, and it must stay current for the whole contract. Check your status now and list your CMMC UIDs in your quote.
  • Restricted design files. The design files are limited to DoD and DoD contractors and may not go to vendors without Government approval. Request the files from the contract specialist now and confirm you qualify before you spend time on a quote.
  • LPTA versus best value wording. The notice says the lowest priced technically acceptable quote wins, but the standard evaluation clause says the most advantageous offer, price and other factors considered, wins. Ask the contract specialist which method applies before you price your quote.“based on Lowest Priced Technically Acceptable (LPTA) proposals” O2 Carts Combined Synopsis Solicitation.docx
  • 15 weeks is a pass-fail test. Meeting the 15-week delivery is a technical requirement, so a quote that misses it is unacceptable, not just late. Plan parts lead times, fabrication and any gauge approval to finish within 15 weeks of award.“Meeting delivery date 15 weeks after contract award” O2 Carts Combined Synopsis Solicitation.docx
  • Two different TDP numbers. The notice cites the design package as TDP 10226, TDP 102226 and 081226, and dates the build list 10/23 and 101926. Ask the contract specialist which package and list are current before you price, and keep the reply on file.“Meeting all item specifications as defined by design files contained in the O2 Carts 081226 TDP” O2 Carts Combined Synopsis Solicitation.docx
  • SAM notarized letter may delay you. If your SAM registration is new, being updated or being renewed, you must send an original, signed, notarized letter naming your Entity Administrator, and that can take several days. Start now so your registration is Active before the deadline.“existing registrations being updated or renewed, will require the submission of an original, signed notarized letter” O2 Carts Combined Synopsis Solicitation.docx

Key terms

Who can bidOpen to all businesses; no set-asideYou must also hold CMMC Level 2 (Self) status in SPRS and have an active SAM registration. The notice gives a 500-employee size standard for NAICS 332710.SAM.gov record
Contract periodDelivery within 15 weeks after awardDelivery is measured from the contract award date.O2 Carts Combined Synopsis Solicitation.docx
How they chooseLowest priced technically acceptable (LPTA)Section M of the solicitation PDF uses best value wording. See the catches.O2 Carts Combined Synopsis Solicitation.docx
Contract typeFirm-fixed-price purchase orderThe notice calls it a COTS purchase, but the carts are built to Government design files.O2 Carts Combined Synopsis Solicitation.docx

How to respond

  1. Email contract specialist Julide Alonso at julide.n.alonso.civ@us.navy.mil or Contracting Officer Jonathan Abbott at Jonathan.d.abbott.civ@us.navy.mil to request the design files, which come by a secure method such as DoD SAFE.
  2. Confirm your SAM registration is Active and your CMMC Level 2 (Self) status is in SPRS. If your registration is new, updated or renewed, send the notarized Entity Administrator letter; where to send it is not stated.
  3. Price CLIN 0001 as one total for all three carts. Explain how you will meet each requirement, since the notice says a bare restatement can hurt your evaluation. List any assumptions, exceptions or deviations, your CMMC UIDs, and a price valid for 60 days.
  4. Send the quote by 10:00 AM Eastern Standard Time on Monday, 7 December 2026. How to submit it is not stated, so ask the contacts above, and fill in blocks 12, 17, 23, 24 and 30 of the solicitation form.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • Where and how to send the quote is not stated.
  • Whether your company can receive the restricted design files, which are limited to DoD and DoD contractors.
  • Which design package version is current: TDP 10226, 102226 or 081226.
  • The estimated value or budget for the three carts.
  • The deadline for questions to the Government.
  • Whether shipping costs belong in your price, since the notice gives no FOB terms beyond Contractor Destination in Section F.

Notice text

See Attachments - O2 Carts Trailer Frame Combined Synopsis Solicittaion - Solicitation N6134026Q1029 - O2 Carts Trailer Frame Bulid List

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who has supplied this lately

Contracts at Department of the Navy for the same kind of product (NAICS 332710, product code 3470) that end within a year either way of today. Notices rarely name the current supplier: these are likely candidates, not a fact.

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 19, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Navy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy