Dredging a new deepwater basin at Port of Nome, Alaska
The Army wants a contractor to dredge a new deepwater basin and expand the outer basin at the Port of Nome, Alaska.
Official title: Port of Nome Modification - Phase 2
- Deadline
- Dec 17, 2:00 PM AKT
- 22 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: W2SN Endist Alaska
What they're buying
The base work is about 578,000 cubic yards, with an option for about 346,000 more cubic yards; the contract period is not stated.
Top catches
“The contractor shall comply with commercial and industry standards as well as all applicable federal, state, and local laws, regulations, and procedures.” Notice text
The notice requires compliance with standards and laws, but no files are attached to show what those standards are. Ask the contracting officer for the specifications and drawings before you price the job.
“Construction Wage Rates (formerly Davis-Bacon Act wage rates) shall apply.” Notice text
Labor must be paid Construction Wage Rates, but the notice does not attach the rate schedule. Get the current rates before you price labor, because they directly change your labor cost.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Base item: dredge about 578,000 cubic yards to a design depth of -40 feet MLLW, with 2.0 feet of allowable overdepth and a maximum pay line of -42.0 feet MLLW
- Option item: dredge about 346,000 cubic yards to a design depth of -28 feet MLLW, with 1.0 foot of allowable overdepth and a maximum pay line of -29.0 feet MLLW
- Dredge directly against the newly constructed Opencell sheet pile docks
- Place all dredged material in a designated nearshore placement area
- Comply with commercial and industry standards and all applicable federal, state and local laws, regulations and procedures
- Pay Construction Wage Rates for labor
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- No specifications or drawings attached. The notice requires compliance with standards and laws, but no files are attached to show what those standards are. Ask the contracting officer for the specifications and drawings before you price the job.
- Construction wage rates apply. Labor must be paid Construction Wage Rates, but the notice does not attach the rate schedule. Get the current rates before you price labor, because they directly change your labor cost.
- Overdepth payment not explained. The base depth is -40 feet with 2.0 feet of allowed overdepth, up to a pay line of -42.0 feet. The notice does not say whether dredging into the overdepth is paid, so ask before you price that extra material.“with a 2.0-foot allowable dredging tolerance (overdepth) establishing a maximum pay line of -42.0 feet MLLW” Notice text
- Option timing and price unclear. The option adds about 346,000 cubic yards to -28 feet MLLW. The notice does not say when the option can be exercised or whether its price must be included in your bid, so ask before you decide how to price it.“The option item includes dredging approximately 346,000 cubic yards to a design depth of -28 feet MLLW” Notice text
- Priority rating on supplies. The notice carries a DO-C2 DPAS rating and cites FAR 52.211-15, so suppliers may have to accept rated orders ahead of other work. Ask your suppliers before you commit to delivery dates.“DPAS Rating: DO-C2, Refer to Clause FAR 52.211-15, Defense Priority and Allocation Requirements” Notice text
- Open to large and small firms. The record shows no set-aside, so larger firms can likely compete as well as small ones. Check your size against the $37,000,000 standard so you know how you will be judged against other bidders.“Set-aside: Not stated” SAM.gov record
Key terms
| Who can bid | Full and open competition; no set-aside statedThe notice lists a $37,000,000 size standard.Notice text |
|---|---|
| How they choose | Invitation for Bid with definitive responsibility criteriaThe notice does not explain how the award is decided.Notice text |
| Contract type | Firm-fixed priceConstruction wage rates also apply to labor.Notice text |
How to respond
- Submission method: Not stated. The notice does not say where or how to send a bid, so find that in the solicitation before you assemble your package.
- Deadline: Thursday, December 17, 2026, 2:00 PM, at the -09:00 offset written in the SAM.gov record.
- Pricing: give a firm-fixed price for the base item (about 578,000 cubic yards to -40 feet MLLW) and state how you price the option item (about 346,000 cubic yards to -28 feet MLLW).
- Labor: build labor costs on Construction Wage Rates, which the notice does not attach, and confirm the current rates before you submit.
Not stated in what we read
- Contract period or completion date
- Estimated contract value
- How and where to submit the bid
- Questions deadline and whether a site visit or pre-bid meeting is required
- Specifications, drawings and the wage determination
- Whether overdepth is paid and when the option can be exercised
Notice text
Project Title: Port of Nome Modification - Phase 2 Project Location: Nome, Alaska NAICS: 237990, Size Standard: $37,000,000 Full and Open Competition Invitation for Bid with Definitive Responsibility Criteria DPAS Rating: DO-C2, Refer to Clause FAR 52.211-15, Defense Priority and Allocation Requirements Description of Work: The Port of Nome Modification - Phase 2 project consists of unclassified dredging to establish a new deepwater basin and expand the existing outer basin at the Port of Nome.
The base item includes dredging approximately 578,000 cubic yards of material at a design depth of -40 feet MLLW with a 2.0-foot allowable dredging tolerance (overdepth) establishing a maximum pay line of -42.0 feet MLLW. The option item includes dredging approximately 346,000 cubic yards to a design depth of -28 feet MLLW, with a 1.0-foot allowable dredging tolerance establishing a maximum pay line of -29.0 feet MLLW. Dredging will occur directly against the newly constructed Opencell sheet pile docks.
All dredged material will be placed in a designated nearshore placement area. The contractor shall comply with commercial and industry standards as well as all applicable federal, state, and local laws, regulations, and procedures. The type of contract shall be firm-fixed price. Construction Wage Rates (formerly Davis-Bacon Act wage rates) shall apply.
As published on SAM.gov.
Contacts
- Jennifer Gosh, jennifer.gosh@usace.army.mil
- George Nasif, george.g.nasif@usace.army.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 18, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 17, 2:00 PM AKT22 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237990, other heavy and civil engineering construction, soonest deadline first.
- Department of Veterans AffairsStormwater upgrades at Crown Hill cemetery, Indianapolis, IN
- Bureau of Indian Affairs96-inch culvert replacement on BIA Route 3, Cibecue, AZ
- Department of the ArmyNew baseball stadium at USAF Academy, Colorado Springs, CO
- Department of the ArmyLock and dam rehabilitation, Chicago, Illinois
- Department of the ArmyDredge containment repairs, Savannah and Brunswick, GA
- Departmental OfficesWater recirculation pipeline and pump, Pixley refuge, CA
- Department of the ArmyMaintenance dredging task orders, South Atlantic region
- Department of the ArmyTainter valve repair at The Dalles Lock and Dam, WA
Free · at most one email a morning
Get new notices from Department of the Army by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy