Wind tunnel model support parts, Moffett Field, CA

NASA Ames Research Center plans to buy complete replacement of two model support systems for its Unitary Plan Wind Tunnel, each with over 122 precision machined parts, for work at Moffett Field, California.

Official title: Pre-Solicitation Notice for a Model Support Replacement of the Unitary Plan Wind Tunnel

Deadline
Dec 8, 5:00 PM PT
12 days left
Who can bid
Small businesses
Size standard for NAICS 332710: 500 employees · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Moffett Field, CA
Buyer: NASA Ames Research Center

What they're buying

No contract period is stated, and no proposals are accepted now; the RFP is expected on or about December 8, 2026.

Top catches

Record and notice dates conflict
“with an anticipated offer due date of January 8, 2027” Notice text

The SAM.gov record shows a response deadline of December 8, 2026, but the notice expects the RFP on that date and offers due January 8, 2027. Do not plan around the record date; watch SAM.gov for the RFP's actual due date.

Check the 500-employee size standard
“The NAICS Code and Size Standard are 332710 and 500 employees, respectively.” Notice text

The set-aside uses a 500 employee size standard for NAICS 332710. Confirm your headcount meets this standard before you plan a bid.

3 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Replace two model support systems for the Unitary Plan Wind Tunnel.
  • Each complete system needs over 122 parts that require complicated machining and exacting tolerances.
  • Largest parts are up to 99 inches long, 15.5 inches in diameter and 1400 lbs, made from ASTM A668 forgings.
  • Precision grind bearing race lands to .0005 inch to .001 inch roundness and cylindricity.
  • Procure forgings, material certifications, machining, grinding, heat treating, inspection reports, and shipping to NASA Ames.
  • Interim fit checks of mating parts may be done by the contractor as the work progresses.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Record and notice dates conflict. The SAM.gov record shows a response deadline of December 8, 2026, but the notice expects the RFP on that date and offers due January 8, 2027. Do not plan around the record date; watch SAM.gov for the RFP's actual due date.
  • Check the 500-employee size standard. The set-aside uses a 500 employee size standard for NAICS 332710. Confirm your headcount meets this standard before you plan a bid.
  • Full supply chain falls on you. You must procure the forgings and deliver certified, heat-treated, ground and inspected parts to NASA Ames. Price all of these steps and shipping, not just machining.“Contractor will be responsible for procuring forgings, material certifications, machining, grinding, heat treating, inspection reports, and shipping to NASA ARC.” Notice text
  • No proposals accepted now. This notice is not a solicitation, so do not send a proposal in response to it. The RFP and its terms are not yet released.“THIS IS NOT A REQUEST FOR PROPOSALS. NO PROPOSALS ARE TO BE SUBMITTED IN RESPONSE TO THIS NOTICE.” Notice text
  • Questions by email only, early. Send all questions by email to Wilma Estrada by 5:00 p.m. Pacific time on December 22, 2026. The date falls before the RFP is expected to be out, so plan to ask questions soon after it is released.“All contractual and technical questions must be submitted electronically via email to Wilma Estrada and Wilma.L.Estrada@nasa.gov not later than December 22, 2026 5:00 p.m. Pacific time.” Notice text

Key terms

Who can bidSmall businesses only (total set-aside)NAICS 332710, size standard 500 employees.Notice text
How to submitNot open yet. Wait for the RFP on SAM.gov.The RFP is expected on or about December 8, 2026. Offer submission details are not stated.Notice text
Questions dueTuesday, December 22, 2026, 5:00 p.m. Pacific timeSend questions by email to Wilma Estrada at Wilma.L.Estrada@nasa.gov. Telephone questions are not accepted.Notice text
Contract typeNot a FAR Part 12 commercial buyThe specific contract pricing type (for example fixed price or cost) is not stated.Notice text

How to respond

  1. Do not submit a proposal in response to this notice; the notice says none are to be submitted.
  2. Watch SAM.gov for the RFP, expected on or about December 8, 2026, and for any amendments, since the notice says monitoring is your responsibility.
  3. Email any contractual or technical questions to Wilma Estrada at Wilma.L.Estrada@nasa.gov by 5:00 p.m. Pacific time on December 22, 2026. Telephone questions are not accepted.
  4. Notify the office of your intent to submit an offer, which the notice encourages; the notice does not give a separate method for this.
  5. Offer format, submission method and offer due date: Not stated. Confirm these in the RFP.

Not stated in what we read

  • Estimated value of the contract.
  • Contract period, option years and delivery schedule.
  • How offers will be evaluated and the award basis.
  • Contract pricing type, such as fixed price or cost.
  • How and where offers must be submitted, and the offer due date in the RFP.
  • Whether a site visit or pre-bid meeting is required, and whether subcontracting is allowed.

Notice text

THIS IS NOT A REQUEST FOR PROPOSALS. NO PROPOSALS ARE TO BE SUBMITTED IN RESPONSE TO THIS NOTICE. The National Aeronautics and Space Administration (NASA) Ames Research Center (ARC) plans to issue a Request for Proposal (RFP) for the complete replacement of two model support systems of its Unitary Plan Wind Tunnel (UPWT). The support systems require piece parts which need complicated machining and exacting tolerances. The largest and most complex parts (up to 99" long, 15.5" diameter, 1400 lbs) are to be made from the American Society for Testing and Materials (ASTM) A668 forgings.

Some parts require precision grinding of bearing race lands to .0005” to .001” roundness and cylindricity. Contractor will be responsible for procuring forgings, material certifications, machining, grinding, heat treating, inspection reports, and shipping to NASA ARC. Final assembly will be done at NASA ARC by the tunnel mechanics, but interim fit checks of the mating parts could be done by the contractor as the work progresses. Each complete model support system requires over 122 parts.

The Government does not intend to acquire a commercial product or commercial service using FAR Part 12. This acquisition is for a total small business set-aside. The NAICS Code and Size Standard are 332710 and 500 employees, respectively. The anticipated release date of the RFP is on or about December 8, 2026, with an anticipated offer due date of January 8, 2027. All responsible sources may submit an offer which will be considered by the agency.

NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at: https://www.hq.nasa.gov/office/procurement/regs/Procurement-Ombuds-Comp-Advocate-Listing.pdf If a solicitation is released, then it and any additional documents will be available on Sam.gov. It is the offeror's responsibility to monitor this website for the release of the solicitation and amendments (if any). Potential offerors will be responsible for downloading their own copy of the solicitation and amendments (if any).

Prospective offerors are encouraged to notify this office of their intent to submit an offer. All contractual and technical questions must be submitted electronically via email to Wilma Estrada and Wilma.L.Estrada@nasa.gov not later than December 22, 2026 5:00 p.m. Pacific time. Telephone questions will not be accepted.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from National Aeronautics and Space Administration by email

Each morning we'll send the new solicitations and sources-sought notices from National Aeronautics and Space Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy