Replace 11 automatic transfer switches at North Chicago, IL
The VA plans to replace eleven automatic transfer switches serving hospital and support buildings at the James A. Lovell Federal Health Care Center, and to expand two generator buildings to house them.
Official title: Y1DZ--PROJECT: 556-24-114 Update and Replace Remaining ATS's
- Deadline
- Not stated
- The solicitation will set it
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: 252-Network Contract Office 12 (36C252)
What they're buying
The anticipated period of performance is 365 calendar days from Notice to Proceed.
Top catches
“Offerors must be active in SAM.gov and certified through the SBA VetCert Program at the time required by the solicitation.” Notice text
Only firms that are service-disabled veteran-owned and certified in the SBA VetCert Program can bid on this set-aside. Check your VetCert status and SAM.gov registration now, because the solicitation will set the date you must have them.
“The Contractor shall provide all labor, materials, equipment, supervision, testing, commissioning, temporary power, and associated services required to complete the work.” Notice text
You must price all labor, materials, equipment, and temporary power yourself. The notice does not say the Government will furnish any of it, so price temporary power and testing before you bid.
Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 1 of 1 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Remove and replace eleven automatic transfer switches (ATS units).
- Electrical modifications, system integration, testing, startup, commissioning, and acceptance testing.
- Expand the footprint of two generator buildings to house the ATS units, and relocate electrical equipment into the expanded areas.
- Install required HVAC, architectural components, and finishes in the expanded generator building areas.
- Provide temporary power, fully operational and tested before any planned outage, and write a phased outage plan.
- Restore affected building components and systems after the work.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Only SDVOSB certified firms. Only firms that are service-disabled veteran-owned and certified in the SBA VetCert Program can bid on this set-aside. Check your VetCert status and SAM.gov registration now, because the solicitation will set the date you must have them.
- Contractor supplies temporary power. You must price all labor, materials, equipment, and temporary power yourself. The notice does not say the Government will furnish any of it, so price temporary power and testing before you bid.
- Outages can move on short notice. Each planned outage needs 14 calendar days notice and prior Government approval, and the Government may change outage dates. Plan crews and temporary power so a moved outage does not leave you idle or in breach.“Planned outages shall be coordinated at least fourteen (14) calendar days in advance and may be restricted to periods designated by the Government.” Notice text
- No response date yet. There is no response date and no solicitation yet. Do not send a proposal now, because proposals sent in response to this notice will not be considered. Watch SAM.gov for the solicitation, expected on or about 14 December 2026.“This notice is not a request for proposals, and proposals submitted in response to this notice will not be considered.” Notice text
- Lowest price wins. Award goes to the lowest evaluated price among technically acceptable offers. Extra technical strength is unlikely to win you the award, so price tightly and make sure your approach clearly meets the requirement.“Award is anticipated to be made to the responsible offeror submitting the lowest evaluated price among technically acceptable proposals.” Notice text
- Place of performance conflict. The SAM.gov record shows no place of performance, but the attachment names the James A. Lovell Federal Health Care Center in North Chicago, IL. Confirm the site with the contracting office before you price travel and crews.“Place of performance: Not stated” SAM.gov record
Key terms
| Who can bid | Service-Disabled Veteran-Owned Small Business (SDVOSB) set-asideYou must be active in SAM.gov and certified through the SBA VetCert Program at the time the solicitation requires.Notice text |
|---|---|
| Contract period | 365 calendar days from Notice to ProceedAnticipated. The start date depends on the Notice to Proceed.Notice text |
| How they choose | Lowest Price Technically Acceptable (LPTA)Award goes to the lowest evaluated price among technically acceptable proposals.Notice text |
| Estimated value | $1,000,000 to $5,000,000 (estimated magnitude of construction)This is a range, not a firm contract value.Notice text |
How to respond
- Do not send a proposal in response to this notice, because it is planning only and proposals sent in response to it will not be considered.
- Watch SAM.gov for solicitation 36C25227R0018, expected on or about 14 December 2026. Solicitation documents will be available only electronically on SAM.gov.
- Confirm your SAM.gov registration is active and your SBA VetCert certification is current before the solicitation response date, which is not stated here.
- Where and how to submit proposals: Not stated.
Attached files
From SAM.gov. Download links open the original files.
- 36C25227R0018_1.docxA copy of the notice description with the same terms and no form. You only need to read it; nothing to fill in or sign. Read.
Not stated in what we read
- Response deadline, date and time: not stated.
- Firm contract value: only a range of $1,000,000 to $5,000,000 is given.
- Questions deadline and how to ask questions: not stated.
- Point of contact name and email: the attachment field is blank.
- Whether drawings, specifications or a site visit will be provided or required: not stated.
- Bonding, insurance and prevailing wage requirements: not stated.
Notice text
Description The Department of Veterans Affairs, Great Lakes Acquisition Center, intends to issue a solicitation for the replacement of eleven (11) Automatic Transfer Switches (ATS) serving hospital and support facilities at the James A. Lovell Federal Health Care Center. The Contractor shall provide all labor, materials, equipment, supervision, testing, commissioning, temporary power, and associated services required to complete the work. Work includes: Removal and replacement of eleven (11) ATS units.
Associated electrical modifications and system integration. Testing, startup, commissioning, and acceptance testing. Development and execution of phased outage plans. Coordination of electrical outages and shutdowns. Provision and maintenance of temporary power systems. Restoration of affected building components and systems. Expansion of the footprint of (2) generator buildings to house ATS units. Relocation of electrical equipment to generator building expanded footprint area.
Installation of required HVAC, architectural components and finishes in expanded footprint areas of generator buildings. Work will be performed in an active healthcare environment. The Contractor shall coordinate all activities to minimize disruption to patient care, life-safety systems, emergency power systems, and facility operations. Work may be required during evenings, weekends, or other periods designated by the Government. Temporary Power and Outages The Contractor shall provide temporary power as necessary to maintain continuity of healthcare operations, life-safety systems, and mission-essential functions during construction.
Temporary power systems shall be fully operational and tested before any planned outage. The Contractor shall submit a detailed phasing and outage plan identifying outage durations, temporary power provisions, switching procedures, contingency measures, and service restoration activities. No outage shall occur without prior Government approval. Planned outages shall be coordinated at least fourteen (14) calendar days in advance and may be restricted to periods designated by the Government.
The Government reserves the right to modify outage schedules to support patient care and facility operations. Magnitude of Construction The estimated magnitude of construction is between $1,000,000 and $5,000,000. Acquisition Information This acquisition is anticipated to be issued as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Offerors must be active in SAM.gov and certified through the SBA VetCert Program at the time required by the solicitation.
The Government anticipates conducting this acquisition under FAR Part 15 using Lowest Price Technically Acceptable (LPTA) procedures in accordance with FAR 15.101-2. Award is anticipated to be made to the responsible offeror submitting the lowest evaluated price among technically acceptable proposals. Period of Performance The anticipated period of performance is 365 calendar days from Notice to Proceed. Solicitation Availability The solicitation is anticipated to be posted on SAM.gov on or about 14 December 2026.
Solicitation documents will be available electronically through SAM.gov. Paper copies will not be available. Disclaimer This notice is for planning purposes only and does not constitute a solicitation. This notice is not a request for proposals, and proposals submitted in response to this notice will not be considered. The Government is not obligated to issue a solicitation or award a contract as a result of this notice.
As published on SAM.gov.
Contacts
- Melanie A Dewing, Contractor, Melanie.Dewing@va.gov, 414-844-4800
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 25, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Not statedThe solicitation will set it
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238210, electrical contractors and other wiring installation contractors, soonest deadline first.
- Department of Veterans AffairsElectrical equipment testing at Cleveland VA, OH
- Forest ServiceSolar battery replacement at Frenchman Work Center, CA
- Department of the Air ForceSwitchgear and cable upgrades at Bolling AFB, DC
- Department of the Air ForceElectrical system repairs for the U.S. Air Force
- Department of the ArmyGenerator power survey for disasters, Pittsburgh, PA
- Forest ServiceFiber optic conduit at Womble Work Center, Mount Ida, AR
- Department of Veterans AffairsProject No. 583-22-106- Replace Electrical Panels & Expand Distribution.
- Transportation Security AdministrationFiber Lease for Pittsburgh Inernational Airport - Notice of Intent to Sole Source
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy