Replace boilers 4 and 5, Milwaukee VA medical center, WI
You would demolish Boilers 4 and 5 in Building 112 at the Clement J. Zablocki VA Medical Center in Milwaukee, WI, and install one new boiler, with an alternate that keeps Boiler 4.
Official title: Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295
- Deadline
- Dec 9, 11:00 AM CT
- 14 days left
- Who can bid
- SDVOSB firms
- Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: 252-Network Contract Office 12 (36C252)
What they're buying
The work runs 455 calendar days, and only CVE-verified service-disabled veteran-owned small businesses may bid.
Top catches
“11-18-2026” SOLICITATION-DESCRIPTION.docx
The SAM.gov record says 2026-12-09 at 11:00 AM, but the solicitation form lists 11-18-2026, which has already passed. Confirm the due date with the contracting officer in writing before you plan your bid.
“This procurement is a 100% set-aside for CVE verified Service-Disabled Veteran-Owned Small Business Firms (SDVOSB)” SOLICITATION-DESCRIPTION.docx
Only firms with CVE verification as service-disabled veteran-owned small businesses can bid. You must also represent SDVOSB status and small business size under NAICS 238220 at bid time, so check this before you price the job.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 9 of 20 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Demolish existing Boilers 4 and 5 in Building 112, with their controls, electronics and electro-mechanical parts (base bid).
- Install one new steam boiler in the Boiler 5 position, with new mechanical, electrical and control systems.
- Alternate bid: demolish only Boiler 5 and keep Boiler 4 connected to the steam header.
- Remove the old boiler stack, install a new stack with guy wire anchors, and patch the roof where equipment was removed.
- Add a new access door with a security grate, plus a concrete maintenance pad outside Building 112.
- Run fuel oil piping as double-wall with secondary containment and leak detection, and keep 24/7 access to emergency boiler connections.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Two different offer due dates. The SAM.gov record says 2026-12-09 at 11:00 AM, but the solicitation form lists 11-18-2026, which has already passed. Confirm the due date with the contracting officer in writing before you plan your bid.
- Set-aside limits who may bid. Only firms with CVE verification as service-disabled veteran-owned small businesses can bid. You must also represent SDVOSB status and small business size under NAICS 238220 at bid time, so check this before you price the job.
- Base and alternate must both be bid. You must price both the base bid and Alternate Bid Item 1. If base bids exceed funding, the award can go on the alternate alone, so price both carefully.“BIDDERS MUST BID ON ALL BID ITEMS.” SOLICITATION-DESCRIPTION.docx
- Contract length conflict in specs. Amendment 0003 says the 455 calendar day total is correct, but the Addendum 02 specification copy still reads 12 months for the period of performance. Plan your schedule and cost for 455 days and confirm the figure with the contracting officer.“The duration in specification 01 00 00 paragraph 1.3E is incorrect.” 36C25227B0001 0003.docx
- Registrations and certification required. A bid without current SAM and DSBS proof is non-responsive and will not be considered. The VAAR 852.219-75 certification must also be in the bid package, or the bid is ineligible for award.“The contractor must submit proof of current (as of time of bid) SAM and DSBS registries with their bid” SOLICITATION-DESCRIPTION.docx
- Key staff cannot be shared. The superintendent and safety professional (SSHO) must be two separate full-time people on this project only, and neither can also serve as project manager or quality control manager. Confirm you can staff these roles before you bid.“SSHO and Superintendent are two separate individuals, and they are dedicated to THIS PROJECT ALONE.” 36C25227B0001 0003.docx
Key terms
| Who can bid | CVE-verified SDVOSB small businesses onlyNAICS 238220, size standard $19.0 Million. You must represent your eligibility at bid time.SOLICITATION-DESCRIPTION.docx |
|---|---|
| Contract period | 455 calendar days after notice to proceed90 days preconstruction, 275 days construction, 90 days closeout, per Amendment 0003.SOLICITATION-DESCRIPTION.docx |
| How they choose | Lowest responsive bid from a responsible bidder, subject to fundingBase bid is considered first. The alternate may be awarded alone if base bids exceed funding.SOLICITATION-DESCRIPTION.docx |
| How to submit | Sealed offer to the VA contracting office in MilwaukeeNumber of copies and any electronic delivery method are not stated.SOLICITATION-DESCRIPTION.docx |
| Questions due | 11am local time, October 22, 2026 (closed)Questions after this date may not be addressed. Answers appear in Amendment 0003.SOLICITATION-DESCRIPTION.docx |
| Estimated value | $2,000,000 to $5,000,000 (expected range)This is an expected project range, not a fixed price. The base bid is a lump sum.SOLICITATION-DESCRIPTION.docx |
| Contract type | Lump-sum construction, base bid plus one alternateAlternate Bid Item 1 keeps Boiler 4 in place. You must bid both items.SOLICITATION-DESCRIPTION.docx |
| Site visit | Wednesday, October 14, 2026, 1:30PM (passed)Meeting point was the parking lot between Buildings 112 and 43. Contractors had to park in the contractor lot.SOLICITATION-DESCRIPTION.docx |
How to respond
- Complete the SF 1442 offer section and the bid schedule in SOLICITATION-DESCRIPTION.docx, pricing both the base bid and Alternate Bid Item 1.
- Follow Block 13 of the SF 1442 for what to include, including proof of current SAM and DSBS registrations and the VAAR 852.219-75 certification.
- List every amendment you received, with its number and date, in Block 19 of the offer.
- Send the original and the copies the form requires to Department of Veterans Affairs, 36C252, 115 South 84th Street, Suite 101, Milwaukee, WI 53214-1476, by 11:00 AM CST on Wednesday, December 9, 2026. Number of copies: Not stated. Electronic delivery: Not stated.
Attached files
From SAM.gov. Download links open the original files.
- 36C25227B0001 0001.docxAmendment 0001 on the standard amendment form, dated 10-16-2026; its change text was cut off in our copy, so you must read it in full and acknowledge it in your offer. Read in part.
- A0003 - VA 695-24-107 Addendum 03 Combined Drawing SetPart-3.pdfAddendum 03 drawings (mechanical bid deduct piping, roof lightning protection); read only, since you do not sign drawings. Read in part.
- A0003 - Blr 4-5 nameplates.pdf Scanned image, not read.
- A0003 - VA 695-24-107 Addendum 03 Combined Drawing SetPart-1.pdfAddendum 03 drawings (title sheet, phasing, architectural demolition); read only, since you do not sign drawings. Read in part.
- S06 - site visit sign in 10-14-26.pdf Scanned image, not read.
- S02 - ATT G - Wage Determination.pdf Not read: over our length limit.
- A0003 - VA 695-24-107 Addendum 02 Combined Specifications (1).pdfThe November 4, 2026 specification set that Amendment 0003 names as the correct specifications; only part was provided, so read it in full. Read in part.
- S02 - ATT B- Drawing Set Part-2 (1).pdf Not read: over our length limit.
- S02 - ATT D - JnA Boiler Controls.FE.pdf Not read: over our length limit.
- S06 - 36C25227B0001 0002.pdf Not read: over our length limit.
- S02 - ATT A - Drawing Set Part-1.pdf Not read: over our length limit.
- SOLICITATION-DESCRIPTION.docxThe SF 1442 offer form and bid schedule; you must complete the offer section, price both bid items, and sign. Read in part.
- S02 - ATT F - MAP.pdf Scanned image, not read.
- A0003 - 695-22-106 Bldg 112 Lightning Protection PLAN.pdf Not read: over our length limit.
- S02 - ATT E - VAAR 852.219-75_REQUIRED.pdf Not read: over our length limit.
- A0003 - PAGE 11 UPDATED.pdfThe pre-award safety and environmental record form, updated to years 2023 through 2025; you must complete it and attach OSHA 300 and 300a forms. Read in part.
- 36C25227B0001 0003.docxAmendment 0003, dated 11-19-2026, lists spec and drawing changes and answers bidder questions; our copy was cut off partway, so you must read it in full and acknowledge it in your offer. Read in part.
- A0003 - VA 695-24-107 Addendum 03 Combined Drawing SetPart-2.pdfAddendum 03 drawings (architectural plans and mechanical piping for both bid options); read only, since you do not sign drawings. Read in part.
- A0003 - PIV procedure for KTRs.pdf Not read: over our length limit.
- S02 - ATT C - Specifications.pdfThe April 6, 2026 specifications, which Addendum 02 partly replaces; read only, but you must price to the amended set. Read in part.
Not stated in what we read
- Number of paper copies of the offer, and whether email or other electronic delivery is accepted.
- Wage determination rates: the file was left out for length and we could not review it, but labor pricing depends on it.
- Available funding amount, which decides whether the base bid or the alternate is awarded.
- Whether performance and payment bonds or a bid guarantee are required, and the deadline for them; the form fields in our copy are unclear.
- Full change lists in Amendment 0001 and Amendment 0002, and the site visit attendee list; these were cut off or not provided.
- Accurate weights and nameplate data for Boilers 4 and 5; the Q&A gives only 2010-era reference weights, and the nameplate file was not included.
Notice text
Replace Boilers 4 and 5 CON
As published on SAM.gov.
Contacts
- Kristine Sutton, Contract Specialist, Kristine.Sutton@va.gov, 414-844-4876
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 9, 11:00 AM CT14 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238220, plumbing, heating, and air-conditioning contractors, soonest deadline first.
- Department of Veterans AffairsChiller System Maintenance
- Department of Veterans AffairsControls Preventive Maintenance
- Department of the ArmyReplace two air handling units at Watervliet Arsenal, NY
- Bureau of Engraving and PrintingReplace air pollution oxidizer at Fort Worth, TX
- Departmental OfficesFire sprinklers and alarms at Honaunau park dorm, HI
- Departmental OfficesHeating leak repair at refuge visitor center, Homer, AK
- Department of Veterans AffairsBrine tank maintenance and salt delivery, Loma Linda, CA
- Department of Veterans AffairsAnnual Chiller Maintenance & Remote 24/7 Monitoring
Free · at most one email a morning
Get new notices from Department of Veterans Affairs by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy