Taxiway resurfacing at North Auxiliary Airfield, SC
You would resurface Taxiways Alpha and Bravo at North Auxiliary Airfield in North, SC, with shoulders, new lighting and signage, drainage work, and crack repair on 20,000 linear feet, under a small-business set-aside.
Official title: Repair Taxiway Alpha & Bravo - North Auxiliary Airfield
- Deadline
- Dec 2, 12:00 PM ET
- 6 days left
- Who can bid
- Small businesses
- Size standard for NAICS 237310: $45 million in average annual receipts · Who qualifies
- Last time
- $2.36M
- Likely Hightower Construction Co Inc
- Place
- North, SC
- Buyer: FA4418 628 Cons PK
What they're buying
Offers are due Wednesday, 2 December 2026 at 12:00 PM, and the performance period is stated in conflicting ways.
Top catches
“Changes "AM" to "PM" for the 2 Dec 1200hrs response date.” Notice text
The due time was changed from AM to PM, so the deadline is noon, not midnight. Upload with time to spare, because late proposals fall under the late-proposal rules in Section L.
“The contractor shall begin performance within 60 calendar days and complete it within 172 calendar days after receiving award, notice to proceed.” Solicitation - FA441827R0002.pdf, page 1
The solicitation gives 60 days to start and 172 days to finish, while the schedule form adds 112 days for mobilization and submittals. The clock start is also unclear. Price the shortest schedule you can defend and get a written answer from the contract specialist.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 12 of 23 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Mill and overlay Taxiways Alpha and Bravo, add shoulders, and regrade the clear area.
- Remove off-station and replace 2,000 cubic yards of unsatisfactory material with select granular material (estimated quantity, CLIN 0002).
- Cement stabilized subgrade over 4,000 square yards and 1200 BX Tensar geogrid (or approved equal) over 4,000 square yards (CLINs 0003 and 0004).
- Asphalt crack repair on 20,000 linear feet, plus Type I and Type III reflective media at 6,250 square feet each (CLINs 0005 to 0007).
- New airfield lighting, signage, storm drainage pipe and manholes, and cured-in-place pipe lining, per the specification table of contents.
- Hot-mix asphalt paving, pavement markings and sod, with a critical path schedule and monthly progress reports.
Who did it before
$2.36M
on the contract that likely holds this work now: Hightower Construction Co Inc. It ended Jan 12, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Deadline changed to noon. The due time was changed from AM to PM, so the deadline is noon, not midnight. Upload with time to spare, because late proposals fall under the late-proposal rules in Section L.
- Performance period is contradictory. The solicitation gives 60 days to start and 172 days to finish, while the schedule form adds 112 days for mobilization and submittals. The clock start is also unclear. Price the shortest schedule you can defend and get a written answer from the contract specialist.
- 20 percent bid bond required. You must send a Standard Form 24 proposal bond for 20 percent of your price with your offer. Performance and payment bonds at 100 percent are due after award, but SF 1442 Item 12b says 10 days and Section C says 15 days. Check with your surety before you bid.“within 15 days of award” Solicitation - FA441827R0002.pdf, page 5
- Proposal goes through DOD SAFE. Offers are uploaded to DOD SAFE, not emailed. Request your drop-off password from the contract administrator early and confirm your email address, because each password request is valid for 14 days. The Government is not responsible for delays from communication interruptions.“Offerors shall submit proposals via DOD SAFE at https://safe.apps.mil.” Solicitation - FA441827R0002.pdf, page 41
- Airfield paving past performance needed. Part II must show airfield paving work similar or greater in scope, using no more than three contracts of up to three pages each. Any subcontractor doing major work must give you written consent to share its past performance. Without a matching record, you may get Neutral Confidence, which may be worth less than a rated record.“Provide with the proposal a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor.” Solicitation - FA441827R0002.pdf, page 41
- Drawings are from 2017. The specifications are the 100 percent design submittal dated April 21, 2017, under JBC Project No. SBML 12-1100, while the solicitation uses SBML 1052018. Ask whether these are final drawings and whether the pavement was resurveyed, and check the Q and A answers before you price quantities.“JBC Project No. SBML 12-1100” Attachment 7 - SBML 1052018 - Combined Specifications.pdf, page 1
Key terms
| Who can bid | Small businesses only (100% set-aside)NAICS 237310. Size standard is $45,000,000 in annual receipts.SAM.gov record |
|---|---|
| Contract period | 172 calendar days (clock start disputed)Sources disagree on the start date and the mobilization time. See catches.Solicitation - FA441827R0002.pdf, page 1 |
| How they choose | Best value; past performance counts more than pricePrice is ranked first, then the lowest-priced offers are checked for past performance in order.Solicitation - FA441827R0002.pdf, page 45 |
| How to submit | Upload to DOD SAFE (safe.apps.mil) before the deadlineGet a drop-off password from the contract administrator first.Solicitation - FA441827R0002.pdf, page 41 |
| Questions due | Closed: 12 November 2026, 9:00 AM ESTAmendment 0001 gave 10 November at 1200 instead. Both dates have passed.Solicitation - FA441827R0002.pdf, page 15 |
| Estimated value | $1,000,000 to $5,000,000 (estimate)Range disclosed under the FAR magnitude rule. It is not a bid price.Solicitation - FA441827R0002.pdf, page 42 |
| Contract type | Firm fixed priceThe base bid is one lump sum. CLINs 0002 to 0007 are estimated quantities with unit prices.Solicitation - FA441827R0002.pdf, page 4 |
| Site visit | Held 4 Nov 2026 (attendance encouraged)The text says offerors are encouraged to attend, not that attendance was required. The sign-in sheet could not be read.Solicitation - FA441827R0002.pdf, page 15 |
How to respond
- Contact the contract administrator, Daniel Teeter, at daniel.teeter@us.af.mil or 843-963-7744, to confirm your email address and get a DOD SAFE drop-off password. The password is valid for 14 days.
- Prepare the Part I price proposal: submit the original and one copy, with SF 1442 blocks 14 to 20, Section B unit and extended prices for CLINs 0001 to 0007, and the Standard Form 24 bid bond for 20 percent.
- Prepare the Part II past performance information: up to three contracts from the last five years, no more than three pages each, plus written subcontractor consent letters.
- List amendments 0001 (04 Nov 2026), 0002 (19 Nov 2026), 0003 (23 Nov 2026) and 0004 (25 Nov 2026) in SF 1442 Item 19. Section H says a failure to acknowledge amendments may make your proposal nonresponsive.
- Upload the complete package to DOD SAFE before 12:00 PM (-05:00) on Wednesday, 2 December 2026.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 7 - SBML 1052018 - Combined Specifications.pdfProject specifications for earthwork, pavement, drainage and sod; only pages 1 to 21 and 342 to 353 of 353 were provided, so you must read the full set for the work you price. Read in part (pages 1–21 and 342–353 of 353).
- Attachment 11 - JB Lindsey Graham Offeror Question and Answer Form.xlsxThe offeror question form with 47 questions on scope, schedule, wage rates and bonds; the answer cells did not come through in our text, so open it for the answers. Read.
- Attachment 9 - Wage Determination - SC20260001.pdf Not read: over our length limit.
- Attachment 10 - Past Performance Customer Questionnaire.pdf Not read: over our length limit.
- Solicitation Amendment FA441827R00020003.pdfAdds the geotech report, transformer and SWPPP attachments, which we could not read; you must acknowledge it and review those files on SAM.gov. Read.
- Attachment 4 - SBML 1052018 - 100 percent drawings part 1.pdfDesign drawings of which only title-block text came through, so you must read the sheets yourself. Read.
- Attachment 3 - SBML 1052018 - Submittal Register.pdf Not read: over our length limit.
- Attachment 13 - Transformer NAAF.png Could not be read.
- Solicitation Amendment FA441827R00020004 SF 30.pdfChanges the deadline from AM to PM and replaces the Q and A file; you must acknowledge it in SF 1442 Item 19. Read.
- Solicitation Amendment FA441827R00020002.pdfAdds bond, insurance, base access and background check terms, plus estimated quantities for CLINs 0002 to 0007; you must acknowledge it in SF 1442 Item 19. Read.
- Attachment 6 - SBML 1052018 - 100 percent drawings part 3.pdf Scanned image, not read.
- Attachment 12 - Geotech Report NAAF.pdf Scanned image, not read.
- JBLG QandA NAAF Taxiways Alpha and Bravo 20261125.xlsxThe current Q and A file from Amendment 0004, which holds the Government answers; our text did not show them, so you must open it. Read.
- Attachment 14 - SWPPP NAAF.pdf Scanned image, not read.
- Solicitation Amendment FA441827R00020001.pdfAdds the Q and A form, the site visit contractor list and the sign-in sheet; you must acknowledge it in SF 1442 Item 19. Read.
- NAAF Site Visit Sign In Sheet 20261104.pdf Scanned image, not read.
- Attachment 8 - Wage Determination - SC20260040.pdf Not read: over our length limit.
- JB Lindsey Graham - Question and Answer Form.xlsxAn earlier copy of the question form that has been superseded, so use the 25 November file instead. Read.
- Attachment 5 - SBML 1052018 - 100 percent drawings part 2.pdf Scanned image, not read.
- NAAF Repair Taxiway Alpha and Bravo SV - List of Contractors.xlsxThe site visit sign-in list showing which companies attended on 4 November 2026; it is for information and you do not need to fill it in. Read.
- Attachment 1 - SBML 1052018 - Total Performance Time.pdfA schedule form with 112 mobilization days, 30 construction days and 30 closeout days that shows zero construction days, so read it with the performance period catch. Read.
- Solicitation - FA441827R0002.pdfThe main solicitation with bid forms, prices, bonds, submission rules and evaluation factors; you must complete and return the SF 1442 offer and the Section L proposal parts, and only pages 1 to 18 and 38 to 48 were provided to us. Read in part (pages 1–18 and 38–48 of 48).
- Attachment 2 - SBML 1052018 - Recovered Material Certification.pdf Not read: over our length limit.
Not stated in what we read
- Government answers to the 47 offeror questions, which did not come through in our text. Open the 25 November Q and A file.
- Whether the wage determinations cover electrical and CIPP work. A question raised this, but the answer was not visible to us.
- The liquidated damages rate. Attachment 1 refers to a liquidated damages tab, but the rate is not in the text provided.
- When funds will be available. The solicitation says no award will be made until funds are available.
- The contents of the scanned files: geotech report, SWPPP, drawing parts 2 and 3, the transformer file and the sign-in sheet. You must review these on SAM.gov.
- Whether the 2017 drawings and CADD files are final, and whether CADD files will be released before the due date.
Notice text
Amendment 04: 1. Changes "AM" to "PM" for the 2 Dec 1200hrs response date. 2. Updates the attached excel file for Q and A to remove internal comments. Answers remain unchanged. Note, updated file name is: "JBLG QandA NAAF Taxiways Alpha and Bravo 20261125". All other terms and conditions remain unchanged.
As published on SAM.gov.
Contacts
- Daniel Teeter, daniel.teeter@us.af.mil, 8439637744
- Robert R. Melton, robert.melton.06@us.af.mil, 8439635173
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Air Force for the same kind of work (NAICS 237310, service code Y1BD) in South Carolina that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Milling and Overlay of Asphalt Pavements at 9 Aircraft Parking Spaces on the Joint Base Charleston Aircraft Parking Ramp. the Work Includes New Pavement Markings, Joint Reseal, Miscellaneous…Hightower Construction Co Inc · FA441825C0005 | $2,362,500 | Jan 12, 2026ended | SC |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 2, 12:00 PM ET6 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237310, highway, street, and bridge construction, soonest deadline first.
- Departmental OfficesWaterman canal gate for Wheeler refuge, Decatur, AL
- Department of the ArmyRoads, parking and grounds renovation, Detroit, MI
- Departmental OfficesRoad and bridge repair at national parks nationwide
- Department of the NavyRoad realignment and roundabout, Camp Lejeune, NC
- Federal Highway AdministrationThree bridges and a culvert on SR 35, Mimbres, NM
- Forest ServiceRoad and trailhead upkeep, Little Missouri Grassland, ND
- Department of the Air ForceAirfield rubber removal and striping, Dover AFB, DE
- Department of the NavyPedestrian footbridge replacement at Camp Lejeune, NC
Free · at most one email a morning
Get new notices from Department of the Air Force by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy