Taxiway repairs at North Auxiliary Airfield, SC
Repair of Taxiways Alpha and Bravo at North Auxiliary Airfield in North, SC, including mill and overlay, new shoulders, lighting and signage, and regrading.
Official title: Repair Taxiway Alpha & Bravo - North Auxiliary Airfield
- Deadline
- Dec 2, 12:00 PM ET
- 7 days left
- Who can bid
- Small businesses
- Size standard for NAICS 237310: $45 million in average annual receipts · Who qualifies
- Last time
- $2.36M
- Likely Hightower Construction Co Inc
- Place
- North, SC
- Buyer: FA4418 628 Cons PK
What they're buying
Section F allows 172 calendar days to complete from notice to proceed.
Top catches
“FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS EFFORT.” Solicitation - FA441827R0002.pdf, page 1
No award can be made until funds are available, and the Government owes you nothing if it cancels. Decide how much to spend on this bid knowing that award may be delayed or never happen.
“within 15 days of award.” Solicitation Amendment FA441827R00020002.pdf
Amendment 0002 sets performance and payment bonds at 15 days after award, which overrides the 10 days on the original SF 1442, so confirm this with the contracting officer. A proposal bond of 20 percent of your total price, on Standard Form 24, must go in with your offer.
Read by AI (Claude Haiku) on Nov 24, 2026 from the notice and 10 of 21 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Base bid (CLIN 0001): one lump-sum item covering all work shown on the drawings and in the specifications.
- Remove and dispose of unsuitable material off station, and replace it with select granular material (CLIN 0002): 2,000 cubic yards, estimated, in place.
- Cement stabilized subgrade (CLIN 0003) and 1200 BX Tensar geogrid or approved equal (CLIN 0004): 4,000 square yards each, estimated.
- Asphalt crack repair (CLIN 0005): 20,000 linear feet, estimated.
- Type I and Type III reflective media (CLINs 0006 and 0007): 6,250 square feet each, estimated.
- Mill and overlay of the taxiways, new shoulders, new airfield lighting and signage, and regrading of the clear area, per the specifications and drawings.
Who did it before
$2.36M
on the contract that likely holds this work now: Hightower Construction Co Inc. It ended Jan 12, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Funds not yet available. No award can be made until funds are available, and the Government owes you nothing if it cancels. Decide how much to spend on this bid knowing that award may be delayed or never happen.
- Bond deadline and proposal bond. Amendment 0002 sets performance and payment bonds at 15 days after award, which overrides the 10 days on the original SF 1442, so confirm this with the contracting officer. A proposal bond of 20 percent of your total price, on Standard Form 24, must go in with your offer.
- Three attachments you could not read. We could not review Attachments 12, 13 and 14 (geotech report, transformer, SWPPP) added on 23 Nov, or the drawing and wage files marked as not included. You must read them on SAM.gov before you price soil, utility and erosion work, since they may change your cost.“(a) Incorporate Attachment 12 - Geotech Report NAAF.” Solicitation Amendment FA441827R00020003.pdf, page 3
- Design may be out of date. The specifications are a 2017 100% design under project SBML 12-1100, but the solicitation names project SBML 1052018. Ask the contracting officer in writing to confirm these are the final drawings and specifications before you price quantities; the Q&A form asks this, but no government answer appears in the copy we reviewed.“JBC Project No. SBML 12-1100” Attachment 7 - SBML 1052018 - Combined Specifications.pdf, page 1
- Past performance outweighs price. Past performance counts for more than price, so the lowest bid may lose if your airfield paving record is weak. Show up to three relevant airfield paving contracts, and include a consent letter from each major subcontractor with your proposal.“This is a competitive best value source selection” Solicitation - FA441827R0002.pdf, page 45
- Base access and background checks. Every worker needs a background check and a base badge before starting, and the Government pays nothing for resulting delay. Submit the base access worksheet at least 7 calendar days before a badge is needed, and build this lead time into your schedule and price.“The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this provision.” Solicitation - FA441827R0002.pdf, page 5
Key terms
| Who can bid | Small businesses only (total set-aside)NAICS 237310, size standard $45,000,000 in annual receipts.SAM.gov record |
|---|---|
| Contract period | 172 calendar days to complete, from notice to proceedWork must begin within 60 days. The start point (award or notice to proceed) is unclear.Solicitation - FA441827R0002.pdf, page 1 |
| How they choose | Best value trade-off; past performance counts more than pricePrice is ranked first, but past performance is weighted more heavily than cost.Solicitation - FA441827R0002.pdf, page 45 |
| How to submit | Upload through DOD SAFE in two separately bound partsPart I is the price proposal (original and one copy). Part II is past performance.Solicitation - FA441827R0002.pdf, page 41 |
| Questions due | Passed. Two dates appear: 10 Nov 2026 at 1200, or 12 Nov 2026 at 9:00 AM ESTAmendment 0001 and Section H disagree. The question window has closed.Solicitation Amendment FA441827R00020001.pdf, page 3 |
| Estimated value | Between $1,000,000 and $5,000,000Government estimate disclosed under FAR 36.204(f). It is not a bid price.Solicitation - FA441827R0002.pdf, page 42 |
| Contract type | Firm fixed priceQuantities for CLINs 0002 to 0007 are estimated, not fixed.Solicitation - FA441827R0002.pdf, page 42 |
| Site visit | Passed: 4 Nov 2026, 10:30 AM ESTOfferors were encouraged to attend, not required. The sign-in sheet could not be read.Solicitation - FA441827R0002.pdf, page 15 |
How to respond
- Read Amendments 0001, 0002 and 0003 and acknowledge each one in your offer. Section H says failure to acknowledge amendments may render your proposal nonresponsive.
- Contact Daniel Teeter at daniel.teeter@us.af.mil or 843-963-7744 to confirm your email address and request a DOD SAFE drop-off password. The request is valid for 14 days, so ask early.
- Upload Part I (price proposal, SF 1442 blocks 14 to 20, Section B prices, Section K, and the SF 24 bid bond; original and one copy) and Part II (past performance, up to three contracts, three pages each) as two separately bound parts through https://safe.apps.mil.
- Submit by 12:00 PM local time on Wednesday, 2 Dec 2026. Fill in SF 1442 item 17 with at least 15 calendar days, because the copy provided shows item 17 blank and offers with less than 15 days are rejected.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 7 - SBML 1052018 - Combined Specifications.pdfPartial project specifications (pages 1-23 and 342-353), covering work rules, insurance, schedule, submittals and sitework. Read only; you do not fill in anything. Read in part (pages 1–23 and 342–353 of 353).
- Attachment 11 - JB Lindsey Graham Offeror Question and Answer Form.xlsxLog of 47 bidder questions with no government answers shown in this copy. Read only, since the question window has closed. Read.
- Attachment 9 - Wage Determination - SC20260001.pdf Not read: over our length limit.
- Attachment 10 - Past Performance Customer Questionnaire.pdf Not read: over our length limit.
- Solicitation Amendment FA441827R00020003.pdfAmendment 0003, dated 23 Nov 2026, adding Attachments 12 to 14 and changing the solicitation number. Read it; you must acknowledge it. Read.
- Attachment 4 - SBML 1052018 - 100 percent drawings part 1.pdfDrawing set part 1. Only title sheets and blank pages came through, so you must read the full drawings on SAM.gov. Read.
- Attachment 3 - SBML 1052018 - Submittal Register.pdf Not read: over our length limit.
- Attachment 13 - Transformer NAAF.png Could not be read.
- Solicitation Amendment FA441827R00020002.pdfAmendment 0002, dated 19 Nov 2026, adding the wage determination, bonds, insurance, security rules and questions form. Read it; you must acknowledge it. Read.
- Attachment 6 - SBML 1052018 - 100 percent drawings part 3.pdf Scanned image, not read.
- Attachment 12 - Geotech Report NAAF.pdf Scanned image, not read.
- Attachment 14 - SWPPP NAAF.pdf Scanned image, not read.
- Solicitation Amendment FA441827R00020001.pdfAmendment 0001, dated 4 Nov 2026, adding the Q&A form, the site visit contractor list and sign-in sheet, and the question deadline. Read only. Read.
- NAAF Site Visit Sign In Sheet 20261104.pdf Scanned image, not read.
- Attachment 8 - Wage Determination - SC20260040.pdf Not read: over our length limit.
- JB Lindsey Graham - Question and Answer Form.xlsxBlank question form from Amendment 0001 with no entries. Read only. Read.
- Attachment 5 - SBML 1052018 - 100 percent drawings part 2.pdf Scanned image, not read.
- NAAF Repair Taxiway Alpha and Bravo SV - List of Contractors.xlsxList of firms that signed up for the site visit, with yes or no attendance marks. Read only. Read.
- Attachment 1 - SBML 1052018 - Total Performance Time.pdfGovernment schedule estimate form for the 172-day period. Construction day cells show zero, so read it as a rough estimate only. Read.
- Solicitation - FA441827R0002.pdfMain solicitation (pages 1-19 and 38-48 included) with the SF 1442 offer form, bid items, clauses, and Sections L and M. You must fill in and sign the offer on page 2. Read in part (pages 1–19 and 38–48 of 48).
- Attachment 2 - SBML 1052018 - Recovered Material Certification.pdf Not read: over our length limit.
Not stated in what we read
- Liquidated damages rate: Attachment 1 refers to a liquidated damages tab, but no rate appears in the provided text.
- Wage rates for electrical and CIPP lining trades: Attachments 8 and 9 were not included, so you must read them on SAM.gov.
- Government answers to bidder questions: the answers are not shown in the Q&A form provided.
- Whether the 2 Dec 2026 deadline will be extended, since a bidder asked for an extension and no answer is shown.
- When funds will become available and when award may be made.
- Contents of the transformer drawing (Attachment 13, PNG) and the geotech and SWPPP reports, which could not be read.
Notice text
Amendment 003 (23 Nov) The purpose of this amendment is to: (a) Incorporate Attachment 12 - Geotech Report NAAF. (b) Incorporate Attachment 13 - Transformer NAAF. (c) Incorporate Attachment 14 - SWPPP NAAF. (d) All other terms and conditions remain unchanged.
As published on SAM.gov.
Contacts
- Daniel Teeter, daniel.teeter@us.af.mil, 8439637744
- Robert R. Melton, robert.melton.06@us.af.mil, 8439635173
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at Department of the Air Force for the same kind of work (NAICS 237310, service code Y1BD) in South Carolina that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Milling and Overlay of Asphalt Pavements at 9 Aircraft Parking Spaces on the Joint Base Charleston Aircraft Parking Ramp. the Work Includes New Pavement Markings, Joint Reseal, Miscellaneous…Hightower Construction Co Inc · FA441825C0005 | $2,362,500 | Jan 12, 2026ended | SC |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 24, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 2, 12:00 PM ET7 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237310, highway, street, and bridge construction, soonest deadline first.
- Departmental OfficesWaterman canal gate for Wheeler refuge, Decatur, AL
- Department of the ArmyRoads, parking and grounds renovation, Detroit, MI
- Departmental OfficesRoad and bridge repair at national parks nationwide
- Department of the NavyService road realignment and roundabout, Camp Lejeune, NC
- Federal Highway AdministrationThree bridges and a culvert on SR 35, Mimbres, NM
- Federal Highway AdministrationThree bridges and road rebuild in Arches National Park, UT
- Forest ServiceRoad and trailhead upkeep, Little Missouri Grassland, ND
- Department of the Air ForceAirfield rubber removal and striping, Dover AFB, DE
Free · at most one email a morning
Get new notices from Department of the Air Force by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy