Replace HVAC equipment at Building 501, Virginia Beach, VA
The Navy wants a design-build contractor to demolish and replace select HVAC equipment in Building 501 at Dam Neck Annex, including rooftop packaged units, split-system air handlers, ductless split-systems and exhaust fans.
Official title: REPLACE HVAC EQUIPMENT, BUILDING 501, DAM NECK ANNEX
- Deadline
- Dec 8, 2:00 PM ET
- 12 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: Navfacsyscom Mid-Atlantic
What they're buying
The task order runs 480 calendar days from award, and only contractors in MACC group ML-C00083 can bid.
Top catches
“ONLY CONTRACTORS IN MACC GROUP ID: ML-C00083 CAN BID ON THIS PROJECT.” AMENDMENT 0003.pdf, page 3
Only the five MACC holders listed in the amendment can submit an offer. If your company is not one of them, you cannot bid on this task order.
“Receipt of Proposal due date is 8 December 2026 at 2:00 PM EST.” AMENDMENT 0003.pdf, page 1
Amendment 0003 replaces the original 22 May 2026 deadline with 8 December 2026 at 2:00 PM EST. Earlier dates for the site visit, questions, and access requests have passed, and the amendment gives no new dates for them.
Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 11 of 21 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Demolish and provide select HVAC equipment: rooftop packaged units, split-system air-handling units, ductless split-systems and exhaust fans.
- Provide architectural, fire protection and electrical work needed to support the new HVAC equipment.
- Roof work: new equipment support curbs, a weather-tight penetration hood for the ductless condensing unit, and roofing that keeps existing roof warranties intact.
- Design: a licensed Designer of Record must sign and seal the design, and the final design must be approved before construction starts.
- Keep NCTAMS LANT rooms 112 to 117 in operation, sequence the system swaps, and provide temporary fans during changeover.
- Write a waste management plan that diverts at least 60 percent of construction waste from landfill.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Only MACC holders may bid. Only the five MACC holders listed in the amendment can submit an offer. If your company is not one of them, you cannot bid on this task order.
- Deadline moved to 8 December. Amendment 0003 replaces the original 22 May 2026 deadline with 8 December 2026 at 2:00 PM EST. Earlier dates for the site visit, questions, and access requests have passed, and the amendment gives no new dates for them.
- Bid bond amount is unclear. Your offer must include a Standard Form 24 bid guarantee. The wording says at least 20 percent of the offer price and also whichever is less, so ask the contracting officer for the exact amount before you price bonding cost.“a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or or $3,000,000, whichever is less.” N4008526R0145 GENERAL REQUIREMENTS.pdf, page 3
- Late finish costs $135.80 a day. Each calendar day past the 480-day completion date costs $135.80 in liquidated damages. Include equipment lead times in your schedule, because the window to question the schedule closed on 6 May 2026.“in the amount of $135.80 for each calendar day of delay until the work is completed or accepted.” N4008526R0145 GENERAL REQUIREMENTS.pdf, page 2
- Missed escort requests stop work. Every worker needs a government escort, and escort requests are due by close of business each Wednesday for the following week. If you miss one, you lose that week of work and get no time extension.“Wednesday will result in not having escorts for the following week, thus not allowing work during that week!” 1907329 Replace HVAC Equipment DB_RFP (032726).pdf, page 10
- Wage determination dates conflict. The RFP cites a wage determination dated 01/30/2026, but the amendment replaces one dated 01/02/2026 with a file dated 5-18-26. That 5-18-26 file was not in the text we could review, so you must read it and price labor from it.“Wage Determination VA20260167 Dated 01/02/2026 is hereby replaced ATTACHMENT B - 5-18-26 WD” AMENDMENT 0003.pdf, page 2
Key terms
| Who can bid | Only contractors in MACC group ML-C00083Five MACC holders are listed. Set-aside status is not stated.AMENDMENT 0003.pdf, page 3 |
|---|---|
| Contract period | 480 calendar days from task order awardThe count includes the first 15 days for award paperwork. Task order award is the notice to proceed.N4008526R0145 GENERAL REQUIREMENTS.pdf, page 2 |
| How they choose | Lowest price; price is the only factorThe government also checks your price against its own estimate and other prices.N4008526R0145 GENERAL REQUIREMENTS.pdf, page 3 |
| How to submit | Through the PIEE Solicitation Module onlyEmail and fax are not accepted. You need the PIEE Proposal Manager role.N4008526R0145 GENERAL REQUIREMENTS.pdf, page 4 |
| Questions due | 6 May 2026, 2:00 PM EDTThis date has passed, and no new question date is stated. Amendment 0003 changed the primary contact email.N4008526R0145 GENERAL REQUIREMENTS.pdf, page 4 |
| Estimated value | $500,000 to $1,000,000 (estimated price range)This is a price range disclosed under FAR 36.204, not a fixed amount.N4008526R0145 GENERAL REQUIREMENTS.pdf, page 2 |
| Contract type | Design-build task order under a MACC, lump-sum base bidThe price form has one lump-sum line. The notice also names design-bid-build in its heading.N4008526R0145 GENERAL REQUIREMENTS.pdf, page 1 |
| Site visit | 28 April 2026, 11:00 AM EDT (passed)The notice calls this the only government site visit. It does not say attendance is required.N4008526R0145 GENERAL REQUIREMENTS.pdf, page 3 |
How to respond
- Register in PIEE for the Proposal Manager role under your CAGE code. A new user needs an account administrator to activate the role before you can submit.
- Upload your proposal as PDF files in the PIEE Solicitation Module, each under 1.9 GB, before 8 December 2026 at 2:00 PM EST. Email and fax are not accepted.
- Include a cover page with the solicitation number, CAGE code, EIN and point of contact (the form also asks for a fax number), a completed Attachment G price form, acknowledged amendments, a copy of your SAM representations and certifications, and a bid bond. Sign the price form.
- Send any contract questions to Jonathan Y. Castillo at jonathan.y.castillo.civ@us.navy.mil, the primary contact named in Amendment 0003. The question deadline in the notice has passed.
Attached files
From SAM.gov. Download links open the original files.
- BASE ACCESS INSTRUCTION.pdfThis explains base access steps for Oceana and Dam Neck, and you must follow it for any worker who needs access. Read.
- SECNAV 5512.pdfThe text did not extract, so we could not review this background check form; each worker must read and complete it. Read.
- ATTACHMENT K - PIEE Vendor Access Instructions.pdfThis guide explains how to register in PIEE for the proposal manager role, which you must complete yourself before submitting. Read.
- DEVGRU SPREADSHEET.xlsxThis is a blank DEVGRU compound access spreadsheet with personal data fields, and it must be filled in for any worker who needs compound access. Read.
- SITE VISIT LOG.pdf Scanned image, not read.
- ATTACHMENT_F_PPI_Spreadsheet.xlsxThis is a blank pre-proposal inquiry form; its deadline has passed, so you only need it for reference. Read.
- https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4635f3505fec431db6724d560cb3cd71/download Could not be read.
- WD VA20260167 5-18-26.pdf Not read: over our length limit.
- 1907329 Replace HVAC Equipment DB_RFP (032726).pdfThis is the design-build RFP; only pages 1 to 37 and 160 to 205 were provided, and it sets design, safety and submittal rules you must read. Read in part (pages 1–37 and 160–205 of 205).
- AMENDMENT 0003.pdfThis amendment sets the new proposal date, changes the contact email and wage determination, and you must acknowledge it with your offer. Read.
- ATTACHMENT N Visit Authorization Request.docxThis is guidance for the visit authorization request that workers need for Building 501 rooms, and you must read it and supply the listed details. Read.
- https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a00a0c4f8628496987519d0e8c247ccf/download Could not be read.
- Attachment A - Reference Drawings - REPAIRS ANS ALTERATIONS TO BUILDING 501 (08JULY2004).pdf Scanned image, not read.
- Attachment B - Reference Drawings - REPLACE ROOF MEMBRANE - Building 501 (27JAN2026).pdf Not read: over our length limit.
- Master Spreadsheet PPIS RESPONSES.pdf Not read: over our length limit.
- https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bb2fb26c579d436d8800da29e3a31e3b/download Could not be read.
- 26R0145 AMENDMENT 0002.pdf Not read: over our length limit.
- eProjects 1907329 Addendum 01.pdfThis addendum changes work hours, utility notice, supervision, roof curb and electrical requirements, so read it with the RFP. Read.
- N4008526R0145 GENERAL REQUIREMENTS.pdfThis is the main solicitation summary with the schedule, bond rules, evaluation terms and price form, and you must complete and sign the price form. Read.
- ATTACHMENT B.pdf Not read: over our length limit.
- ATTACHMENT E BLANK SPREADSHEET.xlsxThis is a blank sponsor verification spreadsheet that you must fill in and email for each worker who needs base access. Read.
Not stated in what we read
- Set-aside status and size standard for this task order. The notice and SAM.gov both say Not stated.
- Whether bidders can still get access to Building 501 before pricing, since the site visit and access deadlines have passed.
- The contents of the 5-18-26 wage determination file, which was not included in the text we could review.
- Whether the 480-day schedule, bonds and liquidated damages still apply after Amendment 0003, which does not restate them.
- The percentage limit on subcontracting under FAR 52.219-14, which the notice cites but does not state.
- The independent government cost estimate and the funding amount. The notice gives only a price range.
Notice text
Login at https://piee.eb.mil and search for 'N4008526R0145' to obtain more details.*
As published on SAM.gov.
Contacts
- Jonathan Castillo, jonathan.y.castillo.civ@us.navy.mil, 7574333623
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 25, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 8, 2:00 PM ET12 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 236220, commercial and institutional building construction, soonest deadline first.
- Department of Veterans AffairsFY27 NRM (PROJ 573-24-110) BB - Expand Cardiology Service
- Department of the Air ForceFitness building supplies, Homestead Air Reserve Base, FL
- Department of Veterans AffairsVISN 2 EHRM Industry Day
- Department of the ArmyNorth Region Small Business MATOC, Mobile District J&A Capacity Increase
- Department of Veterans AffairsRoom prep for new PET/CT scanner, St. Louis, MO
- Department of Veterans AffairsFlooring, cove base and paint at VA OIG offices, New York
- Departmental OfficesTwo crew quarters buildings and site work, Rawlins, WY
- Department of the ArmyProgressive Design-Build (PDB) - RENOVATE HQ AFMC B/10262 PH 2 at WPAFB
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy