Replace OR chiller at Pineville VA medical center, LA

The Department of Veterans Affairs (VA) wants a contractor to remove an existing OR package chiller at the Alexandria VA Health Care System in Pineville, Louisiana, and install one new 120-ton Trane CGAM120 air-cooled chiller with piping, electrical, glycol and startup work.

Official title: Z2NZ--Turn Key Chiller Equipment (Purchase and Install)

Deadline
Dec 2, 10:00 AM CT
7 days left
Who can bid
SDVOSB firms
Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Pineville, NC
Buyer: 256-Network Contract Office 16 (36C256)

What they're buying

The work must be finished within 30 calendar days after a formal notice to proceed, and only certified SDVOSBs may bid.

Top catches

Place of work conflicts
“Place of performance: Pineville, NC, USA” SAM.gov record

The SAM.gov listing says Pineville, NC, but the notice, the SOW and Amendment 0001 say Pineville, LA. Price for Louisiana and have the contracting officer confirm the location in writing before you rely on it.

Only the Trane CGAM120 allowed
“However, they must provide the specified chiller identified in this justification.” JA- BRAND NAME s.pdf, page 3

The VA justified only one chiller brand, the Trane model CGAM120, so you must price that exact unit and its Trane startup. Any alternate needs technical proof that you pay for, and the government may still reject it.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 12 of 13 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove the existing chiller: disconnect electrical, piping and controls, lift it out with a crane, and dispose of it under federal, state and local rules.
  • Supply and install one new 120-ton Trane air-cooled chiller, model CGAM120, with standard finned condenser coils, not microchannel.
  • Insulate all new and modified chilled water piping, and fill the chilled water loop with glycol-water mix at the manufacturer's concentration, with a certificate.
  • Reconnect the chiller to the existing electrical system and chilled water piping, and provide any extra devices needed for operation.
  • Startup and commissioning by authorized Trane service, with operator training, and operation and maintenance manuals in print and digital form.
  • Warranty: one year full parts and labor, five years on the compressor, with warranties registered with the manufacturer and VA; as-builts and commissioning report due within 5 business days of completion.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Place of work conflicts. The SAM.gov listing says Pineville, NC, but the notice, the SOW and Amendment 0001 say Pineville, LA. Price for Louisiana and have the contracting officer confirm the location in writing before you rely on it.
  • Only the Trane CGAM120 allowed. The VA justified only one chiller brand, the Trane model CGAM120, so you must price that exact unit and its Trane startup. Any alternate needs technical proof that you pay for, and the government may still reject it.
  • Sign 852.219-75 or be ineligible. Without a completed and signed VAAR 852.219-75 certificate your offer is ineligible. That form also caps payments to non-SDVOSB special trade firms at 75% of what the government pays you, excluding materials, so plan your subcontract shares now.“Proposals without a completed VAAR Clause 852.219-75 will be considered ineligible for evaluation and award.” 36C25627Q0087.docx
  • Full-time superintendent required. You must assign a 30-hour OSHA certified superintendent who works 100% full time on this one job whenever work is on site. Price that salary for the whole on-site period, and confirm your candidate has at least five years of supervisory experience.“This individual shall be 100% full time dedicated and assigned to this project while work is being performed on site.” 36C25627Q0087.docx
  • Site visit and questions both closed. The only site visit was 4 Nov 2026 and the question deadline was 10 Nov 2026, so both have passed. If you did not attend, ask the contracting officer in writing whether a private visit is allowed, since the SOW requires a site visit before work starts.“THIS WILL BE THE ONLY SITE VISIT CONDUCTED FOR THIS PROCUREMENT.” 36C25627Q0087.docx
  • Build clock waits for equipment. The 10-day start and 30-day finish run only from a formal notice to proceed, which is issued when equipment is available. The notice gives no lead time, so ask the contracting officer for an expected date before you set your schedule and price.“Due to equipment lead times NTP will be issued only when equipment is available.” 36C25627Q0087.docx

Key terms

Who can bidCertified SDVOSBs only, listed in the SBA databaseJoint ventures must submit a joint venture agreement with the proposal.36C25627Q0087.docx
Contract periodStart within 10 days of formal NTP; finish within 30 calendar daysThe clock starts at the formal notice to proceed, which waits for equipment.36C25627Q0087 RFIs.docx
How they chooseBest value; Factors 1 to 3 equal, together about equal to priceThe government anticipates discussions, and final proposal revisions may be requested.36C25627Q0087.docx
How to submitOne email with one consolidated PDF under 10 MBThe notice gives two subject-line formats; see steps.36C25627Q0087.docx
Questions dueClosed: 10:00 AM, 10 Nov 2026Answers were posted in Amendment 0002. Section A.5 gives 10:30 AM for the same deadline.36C25627Q0087.docx
Estimated value$100,000 to $250,000 (estimated magnitude)Stated range only; the government cost estimate is not in the provided text.36C25627Q0087.docx
Contract typeFirm-fixed-price, one lump-sum line (CLIN 0001)Progress payments are allowed under the FAR clause, subject to an approved payment breakdown.36C25627Q0087 RFIs.docx
Site visit4 Nov 2026, 10:30 AM (already held)Mandatory status is not stated; the SOW requires a site visit before work starts.36C25627Q0087.docx

How to respond

  1. Complete and sign the SF 1442 pages, the acknowledgment of Amendments 0001 and 0002, the VAAR 852.219-75 certificate, and the Factor 4 forms, including the annual representations and the price breakdown.
  2. Prepare a bid bond that is wet signed with notary impressions clearly visible, and include a copy in the email. The bid guarantee is 20% of the bid price or $100,000, whichever is less.
  3. Combine everything into one PDF under 10 MB in Arial 11, covering Factors 1 to 4 and Exhibits A to E where needed. Page limits for each factor are not stated in the text provided.
  4. Email the PDF to Andrew Misfeldt at andrew.misfeldt@va.gov, the contract specialist named in the notice, using the subject line Company Name, 36C25627Q0087, and OR Chiller Replacement, so it is received by 10:00 AM CST on Wednesday, December 2, 2026. The notice does not give a separate proposal address, so confirm it with him.

Attached files

From SAM.gov. Download links open the original files.

  • LA20260051.pdfDavis-Bacon wage rates for Rapides Parish; read only, and labor must be paid at least these rates. The main solicitation still lists LA20260031, but the RFI answer says this one applies. Read.
  • 36C25627Q0087 EXHIBIT D.docxSafety record and experience modification rate form; you complete it with OSHA 300 logs and submit it with the price proposal. Read.
  • 36C25627Q0087 EXHIBIT B.docxPast performance questionnaire you send to references, who return it to the contracting office; it is not mandatory. Read.
  • 36C25627Q0087 0001.docxAmendment 0001 on SF 30 corrects the place of work to Pineville, LA; read only, and list it when you acknowledge amendments. Read.
  • 36C25627Q0087 EXHIBIT C.docxSubcontractor consent form; each major subcontractor or teaming partner must sign it. Read.
  • Final OR CHILLER REPLACEMENT SOW.docxStatement of work covering removal, installation, startup, warranty and submittals; read it to price the scope. Read.
  • OR CHILLER REPLACEMENT SITE VISIT SIGN IN SHEET.pdf Scanned image, not read.
  • 36C25627Q0087.docxMain solicitation with the SF 1442, clauses and evaluation rules; you must complete and sign the SF 1442 and the Factor 4 forms. Read.
  • 36C25627Q0087 EXHIBIT E.docxSurety form; your surety completes it and you submit it with the proposal. Read.
  • 36C25627Q0087 RFIs.docxQuestion and answer file; only the start was provided, so read the full file on SAM.gov before pricing, since the rest was cut off. Read in part.
  • 36C25627Q0087 0002.docxAmendment 0002 on SF 30 extends the deadline to 2 Dec 2026 and posts question answers; read only, and list it when you acknowledge amendments. Read.
  • JA- BRAND NAME s.pdfBrand-name justification for the Trane CGAM120; read only, it limits which chiller you can offer. Read.
  • 36C25627Q0087 EXHIBIT A.docxPerformance relevancy survey; you complete one per past project, up to five, with your past performance. Read.

Not stated in what we read

  • The government cost estimate is not in the provided text, so the stated range is the only value.
  • Page limits for each factor are not shown, so you cannot tell how long each volume may be.
  • Liquidated damages or delay penalties are not stated, although Exhibit A asks about them.
  • Whether performance and payment bonds are required, and how many days after award they are due, is unclear in the SF 1442 items 12a and 12b.
  • The site visit sign-in sheet is a scanned image we could not read, so you must review it on SAM.gov; the RFI answer about the formal NTP date ends at June 1 and the rest of that file was not provided.
  • Existing chiller details (make, model, weight, refrigerant, piping sizes, glycol type) were asked for in the RFIs, and the answer says Not available.

Notice text

36C25627Q0087 Post questions and answers.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 17, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy