- Opportunities
- Department of Homeland Security
- US Coast Guard
- 70ZU0227QLREP0001
Dockside repairs on USCGC Hamilton, North Charleston, SC
The Coast Guard wants a contractor to clean, inspect, repair, preserve and modify the cutter USCGC Hamilton (WMSL-753) at its home moorage in North Charleston, SC, from 20 April 2027 to 20 August 2027.
Official title: USCGC HAMILTON (WMSL 753) DS, FY27, FQ3
- Deadline
- Dec 10, 12:00 PM ET
- 14 days left
- Last time
- $29.9M
- Likely Detyens Shipyards Inc
- Place
- North Charleston, SC
- Buyer: CG-Sea-C22
What they're buying
The job covers 13 work items, including fuel and grey water tank work, air conditioning overhaul, deck renewal, and a davit modification.
Top catches
“Set-aside: Small Business Set Aside - Total” SAM.gov record
Only small businesses may bid. The notice does not give the size standard, so check your size under NAICS 336611 before you spend time on a quote.
“The Contractor must submit a copy of the developed availability specific fire plan as requested in the Fire Protection and Response work item, with the Contractor’s bid.” Attachment A _ Specification HAMILTON (WMSL-753) REV0.pdf, page 13
Your bid must include a copy of the availability-specific fire plan. Prepare it before you submit, or your bid will likely be treated as incomplete.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 4 of 9 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Clean and inspect two fuel tanks (13,869 and 10,563 gallons) and three grey water lift station tanks, with pit and ultrasonic measurements and a written report.
- Overhaul three air conditioning plants: eddy current test six condensers, renew up to 100 failed tubes, and renew the resilient mounts.
- Modify the dual point davit for split constant tension, renew its aft winch tensioner, and overhaul the stern boat launch and recovery winches.
- Renew about 12 pipe insulation locations, and renew approximately 4,500 sq ft of flight deck slip-resistant covering and 3,000 sq ft in the hangar area.
- Renew carpet in seven staterooms (about 984 sq ft) and fully preserve four deck areas (about 1,462 sq ft).
- Groom the oily water separator, provide flight deck tenting, offload 5,000 gallons of oily waste, and price up to 1,500 hours of additional labor.
Who did it before
$29.9M
on the contract that likely holds this work now: Detyens Shipyards Inc. It ends Dec 1, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Small business only, size rule not given. Only small businesses may bid. The notice does not give the size standard, so check your size under NAICS 336611 before you spend time on a quote.
- Fire plan due with bid. Your bid must include a copy of the availability-specific fire plan. Prepare it before you submit, or your bid will likely be treated as incomplete.
- Key files not reviewed. We could not review Attachments E, F, G or H. Read them on SAM.gov before you bid, since they cover base access, a non-disclosure agreement and the contract clauses.“Attachment E _ FLETC Base Access and Pier Laydown HAM DS” Notice text
- Five inspections due early. Five work items need inspection reports completed within the first 25% of the contract period, roughly the first 30 days, likely to late May 2027. Plan crew and inspector time for this early window.“which the Contractor must complete within the first 25% of the availability contract period” Attachment A _ Specification HAMILTON (WMSL-753) REV0.pdf, page 10
- Hourly rate and markup set change prices. Your hourly labor rate and markup percentage will be used for all change requests. Price them carefully, since 1,500 hours are listed.“The above rate and percentage will be incorporated into the contract and used on change requests (CRs).” Attachment B_Pricing Schedule HAMILTON DS FQ3 FY27.xlsx
- Staff certifications required. Your technicians servicing air conditioning equipment must hold EPA Type IV certification. Tech reps are also required for several items. Confirm your staff can meet these before you bid.“The Contractor must ensure that all personnel servicing Air Conditioning and Refrigeration (AC&R) equipment that uses CFC or HCFC refrigerant hold a current Environmental Protection Agency (EPA) Technician Certification, Type IV” Attachment A _ Specification HAMILTON (WMSL-753) REV0.pdf, page 62
Key terms
| Who can bid | Small businesses only (total small business set-aside)The size standard is not stated in the notice.SAM.gov record |
|---|---|
| Contract period | 20 April 2027 to 20 August 2027About four months of work.Notice text |
| Estimated value | Not statedThe pricing sheet has a $100,000.00 base line for markup and subcontract work. It has no total value.Attachment B_Pricing Schedule HAMILTON DS FQ3 FY27.xlsx |
How to respond
- Email written questions in the Attachment C format to Tatiana Sher at Tatiana.Sher1@uscg.mil and Mark Cap at Mark.Cap@uscg.mil. The notice does not give a questions deadline.
- Read Attachments E, F, G and H on SAM.gov before you price, since we could not review them.
- Fill in every line of the Attachment B pricing sheet, including your hourly composite labor rate and markup percentage.
- Include a copy of your availability-specific fire plan with your bid, as the specification requires. Submit by Thursday, 10 December 2026, 12:00:00 -05:00. How and where to send the quote is not stated, so check SAM.gov for the method.
Attached files
From SAM.gov. Download links open the original files.
- Attachment G_ Sol. 70ZU0227QLREP0001_Provisions and Clauses.pdf Not read: over our length limit.
- Attachment B_Pricing Schedule HAMILTON DS FQ3 FY27.xlsxThe pricing sheet with job lines, a day line, hourly labor and a markup line. You must fill in the unit and extended prices. Read.
- Attachment F_ Non-Disclosure Agreement.pdf Scanned image, not read.
- Attachment A _ Specification HAMILTON (WMSL-753) REV0.pdfThe Rev-0 work specification for all 13 work items. Read it in full and price each item. You do not sign it. Read.
- 70ZU0227QLREP0001 A00001.pdf Not read: over our length limit.
- Attachment D_ Past Performance Form.pdfThe past performance form. You fill it in for each past contract you cite. Read.
- Attachment C_Request for Clarification_HAMILTON FY27 FQ3.pdfThe form for written questions to the Coast Guard. Use it for your questions; its heading still names CGC Calhoun. Read.
- Attachment H_ SF1449 70ZU0227QLREP0001.pdf Scanned image, not read.
- Attachment E_ FLETC Base Access and Pier Laydown HAM DS.pdf Not read: over our length limit.
Not stated in what we read
- How and where to send your quote, and whether a portal or email is used.
- How the award is decided, such as lowest price or best value.
- The estimated total value of the job. The pricing sheet has no total.
- The questions deadline. Answers will come by amendment.
- Base access and pier laydown rules, which are in Attachment E, not reviewed here.
- The size standard for the small business set-aside.
Notice text
A00001 posted_11/25/2026 This is a Request for Quote (RFQ) for the Fiscal Year Quarter (FYQ) 3, Fiscal Year (FY) 27 Dockside Repairs of United States Coast Guard Cutter USCGC HAMILTON (WMSL-753), home moorage North Charleston, SC. Work will include ship repair, maintenance, modifications, and associated logistics and supporting efforts to facilitate the work in accordance with the: Specification HAMILTON (WMSL-753) REV0. Period of Performance: 20 April 2027 – 20 August 2027 Place of Performance: Onboard USCGC HAMILTON (WMSL-753), North Charleston, SC. Attachments: Attachment A _ Specification HAMILTON (WMSL-753) REV0 Attachment B_ Pricing Schedule HAMILTON DS FQ3 FY27 Attachment C_ Request for Clarification HAMILTON FY27 FQ3 Attachment D_ Past Performance Form Attachment E _ FLETC Base Access and Pier Laydown HAM DS Attachment F _ Non-Disclosure Agreement.
Attachment G_ HAMILTON DS FQ3 FY27 Provisions and Clauses Attachment H_ SF 1449_Sol. 70ZU0227QLREP0001
As published on SAM.gov.
Contacts
- Tatiana Sher, tatiana.sher1@uscg.mil, (571) 613-3126
- Mark Cap, mark.cap@uscg.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at U.S. Coast Guard for the same kind of work (NAICS 336611, service code J998) in South Carolina that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| CGC Hamilton FY26 Heavy Depot Maintenance DrydockDetyens Shipyards Inc · 70Z08526FLREP0087 | $29,894,629 | Dec 1, 2026within a month | SC |
| Task Order for Funding of Definite Work Items Associated With the Dockside Repairs for the USCGC StoneJag Industrial Services, Inc · 70Z08526FLREP0091 | $1,738,722 | Nov 16, 2026ended | SC |
| USCGC Manowar DD FY26Stevens Towing Co Inc · 70Z08026CPBPL0031 | $1,395,577 | Oct 4, 2026ended | SC |
| USCGC Marcus Hanna Dockside RepairsK & M Industrial LLC · 70Z08526CIBCT0016 | $1,335,026 | Sep 30, 2026ended | SC |
| USCGC Bernard Webber Updd FY26 Pop: 3/17/2026 - 6/2/2026Stevens Towing Co Inc · 70Z08026CPBPL0024 | $955,285 | Jun 20, 2026ended | SC |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 10, 12:00 PM ET14 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 336611, ship building and repairing, soonest deadline first.
- Department of the NavyShip repair on USNS City of Bismarck, Busan, South Korea
- Department of the NavyShip repairs on USS Lewis B. Puller in Malaga, Spain
- Department of the ArmyArmy Watercraft Systems Roundtable
- Department of the NavyWatch supervisor chair parts for the Navy
- Department of the NavyPearl Harbor Naval Shipyard 2027 Technology Showcase
- Department of the NavyDive boat repair and preservation, Puget Sound, WA
- Defense Logistics AgencyAutomatic gun feeders for DLA Distribution Red River
- Defense Logistics AgencyVehicular operator panel for DLA Distribution
Free · at most one email a morning
Get new notices from US Coast Guard by email
Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy