- Opportunities
- Department of Homeland Security
- US Coast Guard
- 70Z08527QIBCT0003
Dockside repairs on Coast Guard cutter, Atlantic Beach, FL
Repairs, cleaning and inspections on the Coast Guard cutter Maria Bray while it is docked at its homeport in Atlantic Beach, Florida, from 30 March to 11 May 2027.
Official title: USCGC MARIA BRAY (WLM 562) DOCKSIDE REPAIR FY27
- Deadline
- Dec 30, 8:00 AM PT
- 35 days left
- Last time
- $140K
- Likely Surface Technologies Corporation
- Place
- Atlantic Beach, FL
- Buyer: CG-Sea-C22
What they're buying
The specification lists 31 work items, and most of its pages were not provided to us, so you must review the full document on SAM.gov.
Top catches
“[pages 35-128 of this document were not provided]” Attachment 2 - USCGC MARIA BRAY DS FY27 - SPECIFICATION.pdf
Pages 35 to 128 of the specification, covering work items 4 through 25, were not provided to us. Download the full specification on SAM.gov and price every work item before you bid.
“D-027 | Watertight Doors and Scuttles, External, Renew | JOB | 1” Attachment 1 - USCGC MARIA BRAY DS FY 27 Work Item - Blank.xlsx
The price sheet has a watertight door item (D-027) that the specification does not contain. It also has no line for work item 31, Crews Head Bulkhead Repairs. Ask the contact to confirm before you price the sheet.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice and 4 of 5 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Clean and inspect the crane hydraulic tank (500 gallons), two Z-drive hydraulic tanks (92 gallons each) and the lube oil tank (86 gallons).
- Clean and flush about 1,200 linear feet of sewage piping, and install 2-inch ball valves to isolate the vacuum collection unit and vacuum toilets.
- Inspect and hydrostatically test 9 CO2 cylinders and their flexible discharge hoses, with a qualified technical representative on site.
- Partially preserve bilges of about 40, 120 and 1,200 square feet, including 80 ultrasonic thickness measurements.
- Renew electrical deck covering. The text says about 572 square feet, but the deck table adds to 308 square feet.
- Provide fire watch personnel and fire extinguishers for the whole period, including hours outside Coast Guard fire watch (0800 to 1600, Monday to Friday).
Who did it before
$140K
on the contract that likely holds this work now: Surface Technologies Corporation. It ended Nov 25, 2026.
Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.
What to watch for
- Most of the specification not provided. Pages 35 to 128 of the specification, covering work items 4 through 25, were not provided to us. Download the full specification on SAM.gov and price every work item before you bid.
- Price sheet and specification disagree. The price sheet has a watertight door item (D-027) that the specification does not contain. It also has no line for work item 31, Crews Head Bulkhead Repairs. Ask the contact to confirm before you price the sheet.
- Only about six weeks on site. The work period runs from 30 March to 11 May 2027, and award is expected around 1 February 2027. The specification requires critical inspection reports within the first 25 percent of the period, so check that you can staff and schedule this work.“Period of Performance: 30 March 2027 – 11 May 2027” Notice text
- Certifications due with your quote. The solicitation requires E-Verify enrollment proof, an insurance statement, welding certifications, a subcontractor list and all required certifications with your quote, not after award. Gather these before 30 December 2026.“The Quoters shall submit all certifications, licenses, and personnel qualifications required by the Statement of Work (SOW) with their initial quote submission.” Solicitation 70Z08527QIBCT0003 Maria Bray DS 27.pdf, page 10
- Export-controlled references need JCP. Some specification references are export controlled. You need a current Joint Certification Program certification to get access, and the Coast Guard will only grant access to certified vendors. Start the certification and request drawings by 8 AM PST on 1 December 2026.“Only those vendors that have current certification by JCP will be able to be granted explicit access to these packages by the USCG.” Notice text
- Deck covering area does not add up. Work item 29 says about 572 square feet, but its deck table adds to 308 square feet. Ask which area is correct before you price this work.“approximately 572 square-feet (SQFT), total.” Attachment 2 - USCGC MARIA BRAY DS FY27 - SPECIFICATION.pdf, page 143
Key terms
| Who can bid | Small businesses only (100% set-aside)The solicitation form lists the size standard as 1250 employees for NAICS 336611.Notice text |
|---|---|
| Contract period | 30 March 2027 to 11 May 2027About six weeks on site. Award is expected on or about 1 February 2027.Notice text |
| How they choose | Lowest price among technically acceptable quotesTechnical capability and past performance are pass or fail. The government plans to award without discussions.Solicitation 70Z08527QIBCT0003 Maria Bray DS 27.pdf, page 14 |
| How to submit | Three separate emails to two named contactsEach email must carry the RFQ number and its part name. Each email is limited to 10 MB.Solicitation 70Z08527QIBCT0003 Maria Bray DS 27.pdf, page 8 |
| Questions due | Thursday, 3 December 2026, 8:00 AM PSTSend one question per email on Attachment 4. We could not read that form, so review it on SAM.gov.Notice text |
| Contract type | Firm fixed price definitive contract, with task ordersThe government does not have to order all of the estimated work.Notice text |
| Site visit | Strongly urged; contact by 8 AM PST, 2 December 2026Contact LT Landon Carter and Ou Saephanh. The clause says offerors are urged and expected to inspect the site.Notice text |
How to respond
- By 8 AM PST on Tuesday, 1 December 2026, email requests for drawings to Ou.T.Saephanh@uscg.mil and Sandra.a.Martinez@uscg.mil, citing RFQ#70Z08527QIBCT0003.
- By 8 AM PST on Thursday, 3 December 2026, email each clarification question on Attachment 4 in its own email to the same two addresses, with subject line RFQ#70Z08527QIBCT0003.
- Prepare three parts: Part I price (completed Attachment 1 as a signed PDF plus the spreadsheet), Part II technical capability (three contracts from the last five years, a Gantt-style planning document, a narrative of no more than ten pages, and certifications), and Part III past performance (at least three Attachment 3 forms).
- Email each part separately, each under 10 MB, to both addresses by 8 AM PST on Wednesday, 30 December 2026. Put RFQ#70Z08527QIBCT0003 and the part name in the subject line.
Attached files
From SAM.gov. Download links open the original files.
- Attachment 1 - USCGC MARIA BRAY DS FY 27 Work Item - Blank.xlsxThe blank price sheet. You must fill in unit and extended prices for each line, then return a signed PDF and the spreadsheet. Read.
- Attachment 4 - Request for Clarification Form.docx Could not be read.
- Attachment 3 - Past Performance Information Form.docxThe past performance form. You must complete one form for each of at least three relevant contracts. Read.
- Solicitation 70Z08527QIBCT0003 Maria Bray DS 27.pdfThe solicitation with clauses, quote instructions and evaluation rules. You must read it and sign the SF 1449 and certifications in your quote. Read.
- Attachment 2 - USCGC MARIA BRAY DS FY27 - SPECIFICATION.pdfThe work specification. You must read it to price the work, but only pages 1 to 34 and 129 to 151 were provided to us. Read in part (pages 1–34 and 129–151 of 151).
Not stated in what we read
- Estimated total value of the work. The notice and price sheet give no total.
- The exact shipyard location, and whether the work is done on a Coast Guard base or at your own facility.
- The contents of Attachment 4 (Request for Clarification Form), which we could not read.
- Required insurance amounts. The notice asks for proof of insurance but gives no minimum.
- Contents of specification pages 35 to 128 (work items 4 to 25) and any export-controlled references.
- Which work items the government will actually order, since quantities are estimates only.
Notice text
*************PLEASE DOWNLOAD ALL ATTACHMENTS************** This requirement is for CGC MARIA BRAY that is homeported in Coast Guard District 7 at 4200 Ocean Street Atlantic Beach, FL 32233 and is considered 100% Small Business Set-Aside. Place of Performance: Homeport - 4200 Ocean Street Atlantic Beach, FL 32233 Contract Type: This solicitation will result in the award of Fixed Firm Price Definitive Contract. 1. An offeror's completed Price Schedule shall represent the best price in response to the solicitation.
2. Request for Drawings: The last day to request drawings regarding this solicitation is 8 AM PST on 1 December 2026. After this date, further requests may not be accepted due to time constraints. To request drawings, contact Ou.T.Saephanh@uscg.mil and Sandra.a.Martinez@uscg.mil. All requests should identify the solicitation number RFQ#70Z08527QIBCT0003. Some references listed in the Specification, under "Consolidated List of References," are subject to Export Control limitations or have otherwise restricted distribution and have been deemed "limited access" and "export controlled" packages.
In order to access these documents, vendors must be certified as a US or Canadian contractor by the Joint Certification Program (JCP) administered by the Defense Logistic Information Service (DLIS). Instructions and procedures for being certified by JCP can be found at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/. Only those vendors that have current certification by JCP will be able to be granted explicit access to these packages by the USCG.
3. Site Visit Contact: Please coordinate and contact LT Landon Carter at Landon.F.Carter@uscg.mil and Ou Saephanh at Ou.t.Saephanh@uscg.mil no later than 8 AM PST on 2 December 2026. 4. Request for Clarifications: Please submit all questions using Attachment - 4 for EACH question via email only and address to Ou.T.Saephanh@uscg.mil and Sandra.a.Martinez@uscg.mil no later than 8 AM PST on 3 December 2026. The subject line of all email correspondence must state RFQ#70Z08527QIBCT0003 5.
Submit quotes via email to Ou.T.Saephanh@uscg.mil and Sandra.a.Martinez@uscg.mil no later than 8 AM PST on 30 December 2026. The subject line of all email correspondence must state RFQ#70Z08527QIBCT0003. Quotes received after the deadline may not be considered. Period of Performance: 30 March 2027 – 11 May 2027 ANTICIPATED AWARD DATE: The anticipated date of award is on or about 01 February 2027.
As published on SAM.gov.
Contacts
- ou saephanh, ou.t.saephanh@uscg.mil
- Sandra Martinez, Sandra.A.Martinez@uscg.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
Who may hold this work now
Contracts at U.S. Coast Guard for the same kind of work (NAICS 336611, service code J998) in Florida that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.
| Contract | Obligated | Ends | State |
|---|---|---|---|
| Deck Preservation & Deck Covering Renewal IDIQ- CGC VigilantSurface Technologies Corporation · 70Z08026FMECP0050 | $139,922 | Nov 25, 2026within a month | FL |
| USCGC Mohawk FY26 DS2 Pop 10AUG-04OCT2026North Point Marine & Industrial Inc · 70Z08026CMECP0020 | $1,074,198 | Dec 19, 2026within a month | FL |
| USCG Sta Marathon (45616) FY26 DD Repair Pop: 7/20/2026 - 10/19/2026ST. Johns Boat Company · 70Z04026PSBPL0082 | $364,192 | Oct 26, 2026ended | FL |
| USCG Sta Mayport (45644)FY26 Drydock Repairs AwardST. Johns Boat Company · 70Z04026PSBPL0067 | $307,733 | Sep 29, 2026ended | FL |
| CGC Diligence FY26 DS2 Pop: 01 Jul 26 - 25 Aug 26North Point Marine & Industrial Inc · 70Z08026CMECP0014 | $1,062,803 | Aug 27, 2026ended | FL |
Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 30, 8:00 AM PT35 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 336611, ship building and repairing, soonest deadline first.
- US Coast GuardAnchor windlass repair on USCGC Neah Bay, Cleveland, OH
- Department of the NavyPort boat davit OEM service at Sasebo, Japan
- Department of the NavyShip repair on USNS City of Bismarck, Busan, South Korea
- Department of the NavyShip repairs on USS Lewis B. Puller in Malaga, Spain
- Department of the ArmyArmy Watercraft Systems Roundtable
- Department of the NavyWatch supervisor chair parts for the Navy
- Department of the NavyPearl Harbor Naval Shipyard 2027 Technology Showcase
- Department of the NavyDive boat repair and preservation, Puget Sound, WA
Free · at most one email a morning
Get new notices from US Coast Guard by email
Each morning we'll send the new solicitations and sources-sought notices from US Coast Guard, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy