Overhaul of USNS Earl Warren ship, Singapore
You would price a regular overhaul and underwater hull inspection of USNS Earl Warren (T-AO 207) in Singapore, plus a 15-day continuation option and a piping replacement option.
Official title: USNS EARL WARREN (T-AO 207) ROH/UWILD AMENDMENT 0006
- Deadline
- Dec 9, 1:00 PM UTC+08:00
- 13 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: NAVSUP Flt Log Ctr Yokosuka
What they're buying
Base work runs 31 May to 11 July 2027, and the option period ends 26 July 2027.
Top catches
“Extended to 09 December 2026 at 01:00 PM Singapore Standard Time.” Notice text
Amendment 0006 moved the deadline from 2 December to Wednesday, 9 December 2026, 1:00 PM Singapore time. Older copies still show 2 December, so use the latest amendment and confirm the date in writing.
“Interested contractors must request for the solicitation package which will be provided via DoDSAFE” Notice text
The solicitation package is sent only after you ask by email. Email both named contacts now and ask for the work item references too, since offers are due 9 December 2026.
Read by AI (Claude Haiku) on Nov 25, 2026 from the notice and 13 of 22 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Regular overhaul and underwater hull inspection of USNS Earl Warren (T-AO 207) under MSC specification SSU SN 27-010, base line, 1 job, firm fixed price.
- Option: 15-day continuation of services (work item 0030), 12 July to 26 July 2027.
- Option: miscellaneous piping replacement (work item 0589), 1 lot.
- Insulation and lagging repairs (work item 0502) at 11 listed locations; sizes are approximate, and you must verify them. Apply sealant and two top coats.
- Deckhouse preservation (work item 0159) and high profile non-skid weatherdeck preservation (work item 0168). The latest answer allows slurry blast WJ-1 instead of waterjet WJ-2 for surface prep.
- Many more work items on the rev 2 price sheet, including inspections, certifications and machinery services. Each line needs labor hours, labor price, material price and total.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline moved to 9 December. Amendment 0006 moved the deadline from 2 December to Wednesday, 9 December 2026, 1:00 PM Singapore time. Older copies still show 2 December, so use the latest amendment and confirm the date in writing.
- Package is not attached. The solicitation package is sent only after you ask by email. Email both named contacts now and ask for the work item references too, since offers are due 9 December 2026.
- Port needs a Navy assessment. Your proposed port facility must have an active U.S. Navy port assessment, or you are not eligible for award. Confirm that the port you propose has one before you submit.“The offeror's proposed port facility must have an active port assessment completed by the U.S. Navy in order to be eligible for award.” N6264927RL0050006 Solicitation Conformed Copy.pdf, page 55
- Small business rule, no set-aside listed. The SAM record lists no set-aside, but if two or more responsible small businesses compete, offers from other firms will not be considered. The size standard for NAICS 336611 is not in the text, so check your size status before you bid.“no offers received from other than small business concerns will be considered for award” Solicitation Amendment N6264927RL0050006 SF 30.pdf, page 2
- Option line numbers disagree. The price sheet puts the 15-day continuation at CLIN 0003 and the piping work at CLIN 0004. Section B of the solicitation uses 0002 and 0003. Ask the contracting specialist which numbers to use before you fill in the sheet.“CLIN 0003 Option - CAT B” A0003 J-3 Contractor Pricing Sheet_rev 2.xlsx
- Support hours are not priced apart. Supervision, quality assurance, testing, safety and similar hours are built into your fully burdened labor rate. Do not list them as separate hours on the price sheet.“Labor hours for the below support functions shall not be separately proposed, including in support of subcontractors.” N6264927RL0050006 Solicitation Conformed Copy.pdf, page 3
Key terms
| Who can bid | Not stated as a set-aside; small business priority appliesActive SAM registration is required before award.Notice text |
|---|---|
| Contract period | 31 May 2027 to 11 July 2027; options to 26 July 2027The option period is 15 days, 12 July to 26 July 2027.N6264927RL0050006 Solicitation Conformed Copy.pdf, page 2 |
| How they choose | Lowest total evaluated price, if technically and past performance acceptableOption prices count in the total, but the government does not have to exercise them.N6264927RL0050006 Solicitation Conformed Copy.pdf, page 53 |
| How to submit | Request the package by email; cost part sent as an Excel file by emailWhere to send the full offer is Not stated in the text provided.Notice text |
| Contract type | Firm fixed price; base line plus two optionsGrowth and new work are priced at the fixed rates in price sheet J-3.N6264927RL0050006 Solicitation Conformed Copy.pdf, page 4 |
How to respond
- Email Samantha Cheong at wannaisamantha.cheong.ln@us.navy.mil and Gerry Polohanan at gerry.c.polohanan.civ@us.navy.mil to request the solicitation package through DoDSAFE.
- Confirm that your SAM registration is current and that your proposed port has an active U.S. Navy port assessment.
- Fill in the rev 2 price sheet (J-3) for each work item with labor hours, labor price, material price and total, keeping support hours inside your labor rate.
- Send the cost portion as an Excel file by email. The address and format for the full offer are Not stated in the text provided.
- Deliver your offer by Wednesday, 9 December 2026, 1:00 PM Singapore Standard Time. The delivery method is otherwise Not stated.
Attached files
From SAM.gov. Download links open the original files.
- N6264927RL005 USNS EARL WARREN A0001.pdfClarification answers and corrected work item list for items 0159, 0168 and the price sheet; you must read it because some answers were later revised. Read.
- A0003 J-3 Contractor Pricing Sheet_rev 2.xlsxThe revision 2 price sheet, where you must enter labor hours, labor prices, material prices and totals for each work item. Read.
- N6264927RL0050006 Solicitation Conformed Copy.pdfPartial conformed solicitation with the schedule, work statement, invoicing and evaluation rules; you must read it, and the offer blocks must be completed and signed with your offer. Read in part (pages 1–16 and 51–56 of 56).
- Solicitation Amendment N6264927RL0050002 SF 30.pdfAmendment 0002 that revises clarification answers and provides revised work items 0159 and 0168; you must read it and acknowledge it. Read.
- https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2ca211be01604340b9a5d5df78650d4e/download Could not be read.
- Solicitation Amendment N6264927RL0050003 SF 30.pdfAmendment 0003 that adds work items 0501 and 0502 and replaces the price sheet with revision 2; you must read it and acknowledge it. Read.
- Solicitation Amendment N6264927RL0050001 SF 30.pdfAmendment 0001 that makes clarifications and revises the price sheet; you must read it and acknowledge it. Read.
- 0502_A_Insulation and Lagging Repairs.pdfWork item 0502 describing insulation and lagging repairs at 11 locations; you must read it to price the work, and sizes must be verified. Read.
- 0501_A_TAO 205-207 Steering Gear Cooling Mod T-ALT TAO-205-0232R.pdf Not read: over our length limit.
- N6264927RL005 USNS EARL WARREN A0002.pdfClarification answers for work items 0159 and 0168, including the latest surface preparation answer; you must read it. Read.
- https://sam.gov/api/prod/opps/v3/opportunities/resources/files/758e45d0f5764ec39770244ae77ca952/download Could not be read.
- Solicitation - N6264927RL005 - Released.pdfPartial earlier version of the solicitation that shows the original 2 December deadline; you should read it for context but rely on the later conformed copy. Read in part (pages 1–16 and 51–56 of 56).
- 0159_A_TAO205-CCSI-DECKHOUSE_PRESERVATION_(10_YR) rev-1.pdf Not read: over our length limit.
- N6264927RL005 USNS EARL WARREN A0005.pdfClarification answers for work items 0203, 0316, 0506, 0551 and 0554; you must read the ones that match your scope. Read.
- N6264927RL005 USNS EARL WARREN A0003.pdf Not read: over our length limit.
- Solicitation Amendment N6264927RL0050006 SF 30.pdfAmendment 0006 that moves the deadline to 9 December 2026 and restates the small business rule; you must read it and acknowledge it, since the acknowledgment block lists only amendments 0001 to 0004. Read.
- Solicitation Amendment N6264927RL0050005 SF 30.pdfAmendment 0005 that transmits clarification answers to bidder questions; you must read it and acknowledge it. Read.
- 0527_A_TAO205-CSI-CARGO CRANE INSPECTION (1 YR) (SCSI) REV-1.pdf Not read: over our length limit.
- Solicitation Amendment N6264927RL0050004 SF 30.pdfAmendment 0004 that transmits clarification answers to bidder questions; you must read it and acknowledge it. Read.
- Work Item Index rev-1.pdf Not read: over our length limit.
- 0168_A_TAO205-CSI-HIGH PROFILE NON-SKID WEATHERDECK PRESERVATION (20 PCT) (1 YR) rev-1.pdf Not read: over our length limit.
- https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fb38e6038d21495885333fa8a23bccc7/download Could not be read.
Not stated in what we read
- Estimated value or budget for the work: Not stated.
- Section L offer instructions, clauses and attachments (pages 17 to 50 and the rest of the solicitation) were not provided, so what the offer must contain, page limits and format are unknown.
- Where and how to send the full offer, and whether the technical proposal is due with the cost part: Not stated in the text provided.
- Whether the 0168 quantities are confirmed (the question about 100 or 300 tiedown sockets was not answered), and whether the 18,300 and 12,850 sq ft figures are accepted.
- Set-aside status and the size standard for NAICS 336611 are not stated; payment terms and any price escalation are also Not stated.
- Three linked SAM.gov files could not be read and several files were left out for length, including work item 0501, revised items 0159 and 0168, work item 0527, and the Work Item Index. You must read them yourself.
Notice text
1. USNS EARL WARREN (T-AO 207): NAVSUP Fleet Logistics Center Yokosuka (NAVSUP FLCY), Site Singapore has a new requirement in support of the USNS EARL WARREN (T-AO 207). The repair and maintenance package of work items are included as Work Item Specification Package MSC SSU 27-010. 2. PERIOD OF PERFORMANCE: May-July 2027 3. PLACE OF PERFORMANCE: U.S. 7th Fleet Area of Responsibility (AOR) with geographical restriction excluding performance in India.
4. OFFER: Offerors must provide all information required by this solicitation no later than 02 December 2026 at 01:00 PM Singapore Standard Time. NOTE: Extended to 09 December 2026 at 01:00 PM Singapore Standard Time. (Amendment 0006) Interested contractors must request for the solicitation package which will be provided via DoDSAFE (a web-based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email.)
Please email request to: Samantha Cheong, Contract Specialist, wannaisamantha.cheong.ln@us.navy.mil; and Gerry Polohanan, Contracting Officer, at gerry.c.polohanan.civ@us.navy.mil. The Government intends to award one contract as a result of this solicitation. Prerequisites -Award of a contract resulting from this solicitation must have a current/updated registration in System for Awards Management (SAM). Firms with inactive or no SAM registration will not be considered for award.
As published on SAM.gov.
Contacts
- Samantha Cheong, wannaisamantha.cheong.ln@us.navy.mil, 6567502833
- Gerry Polohanan, gerry.c.polohanan.civ@us.navy.mil, 6567502551
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 25, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 9, 1:00 PM UTC+08:0013 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 336611, ship building and repairing, soonest deadline first.
- US Coast GuardAnchor windlass repair on USCGC Neah Bay, Cleveland, OH
- Department of the NavyPort boat davit OEM service at Sasebo, Japan
- Department of the NavyShip repair on USNS City of Bismarck, Busan, South Korea
- Department of the NavyShip repairs on USS Lewis B. Puller in Malaga, Spain
- Department of the ArmyArmy Watercraft Systems Roundtable
- Department of the NavyWatch supervisor chair parts for the Navy
- Department of the NavyPearl Harbor Naval Shipyard 2027 Technology Showcase
- Department of the NavyDive boat repair and preservation, Puget Sound, WA
Free · at most one email a morning
Get new notices from Department of the Navy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Navy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy