1. Opportunities
  2. Department of Energy
  3. 385439GMK

Utility excavation and repairs at Fermilab, Batavia, IL

On-call, scheduled, and emergency excavation and utility repair across the Fermilab site in Batavia, Illinois, under one IDIQ subcontract with firm fixed price task orders and some time and materials task orders.

Official title: UTILITY EXCAVATION AND REPAIR SERVICES IDIQ

Deadline
Dec 7, 3:00 PM CT
11 days left
Who can bid
Small businesses
Size standard for NAICS 238910: $19 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Batavia, IL
Buyer: Fermilab - DOE Contractor

What they're buying

The base period is anticipated to run January 1, 2027 through December 31, 2028, with three one-year options through December 31, 2031.

Top catches

Surety letter required with proposal
“Proposals that do not include the surety letter may be considered incomplete.” Amendment 01 to RFP NO 385439GMK .pdf, page 1

Your proposal needs a letter from your surety company confirming you can get payment and performance bonds up to $1,000,000 in total. Without it, your proposal may be treated as incomplete, so request the letter now.

Competent Person resume is mandatory
“This resume will not be scored, but a proposal that does not identify a qualified Competent Person for Excavation will not be eligible for award.” RFP_Excavation_Services_IDIQ 385439GMK.pdf, page 7

Name a Competent Person for Excavation trained under OSHA 29 CFR 1926 Subpart P and attach a resume. The resume is not scored, but a proposal without one is not eligible for award.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 11 of 22 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Emergency and urgent excavation to expose and repair failed water mains, sanitary and storm sewers, including breaks, collapses, and sinkholes.
  • Response within 4 hours for emergencies and 8 hours for urgent calls, 24 hours a day, 365 days a year, including weekends and holidays.
  • Trenching, potholing, and vacuum excavation to locate utilities, and install, replace, or repair domestic water, sewer, storm, and sump piping, valves, manholes, and catch basins.
  • Earthwork: grading, dewatering, erosion and sediment control, backfill, compaction, and removal and disposal of spoils.
  • Temporary and permanent restoration of pavement, sidewalks, curbs, and turf to Fermilab standards (Exhibit T, not provided).
  • Ability to field up to three fully staffed crews at once, with the 14 equipment items and 8 labor categories priced in Exhibit A.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Surety letter required with proposal. Your proposal needs a letter from your surety company confirming you can get payment and performance bonds up to $1,000,000 in total. Without it, your proposal may be treated as incomplete, so request the letter now.
  • Competent Person resume is mandatory. Name a Competent Person for Excavation trained under OSHA 29 CFR 1926 Subpart P and attach a resume. The resume is not scored, but a proposal without one is not eligible for award.
  • Exhibit P gives a different deadline. Exhibit P shows 4:00 P.M. Central and a blank date, but the RFP and Amendment 01 say 3:00 P.M. Central on December 7, 2026. Exhibit P says the RFP body governs, so plan to send by 3:00 PM CT on December 7.“Proposals are due no later than close of business (4:00 P.M. Central Time) on December [XX], 2026” Exhibits/Exhibit P Summary of Required RFP Submittal Documents.pdf, page 1
  • Wage determinations could not be read. The three Exhibit L wage determinations are scanned images that could not be read here. Read them yourself before pricing labor, since each task order uses the wage determination in effect when it is issued.“The wage determination in Exhibit L applies to this RFP.” RFP_Excavation_Services_IDIQ 385439GMK.pdf, page 11
  • Safety certification required with proposal. Section 013100 says the signed Construction Environmental, Safety and Health Certification (CESHC) must go in with your proposal. The RFP body and Exhibit P do not list it, so include it to avoid a non-compliant proposal.“Subcontractor must submit the following documents with its Proposal:” Exhibits/Exhibit B - 013100_ESH_Requirements_04-2025 FFDG Hotwork.pdf, page 11
  • Contract dates conflict. Exhibit C gives an estimated period from October 1, 2026 to September 30, 2031. The RFP gives a base period starting January 1, 2027 with options to December 31, 2031. Price for the RFP dates, since questions closed on November 18, 2026.“FROM 10/1/2026 TO 9/30/2031” Exhibits/Exhibit C - Excavation_Services_SOW Sep 2026.pdf, page 1

Key terms

Who can bidSmall businesses only (total set-aside)NAICS 238910; small business size standard is $19.0 million.RFP_Excavation_Services_IDIQ 385439GMK.pdf, page 4
Contract periodJanuary 1, 2027 to December 31, 2028 base; three one-year options to December 31, 2031Exhibit C gives different dates (see catches).RFP_Excavation_Services_IDIQ 385439GMK.pdf, page 6
How they chooseBest value trade-off; single awardPrice is 15 of 100 points. Technical criteria are significantly more important than price.RFP_Excavation_Services_IDIQ 385439GMK.pdf, page 7
How to submitEmail to ginakern@fnal.gov, as two separate partsPart I (technical, no price) and Part II (business and price) must not be bound together.Notice text
Questions dueNovember 18, 2026 at 5:00 pm CSTThis date has already passed.Notice text
Estimated valueAbout $2,600,000 per year (planning estimate); $1,000 minimum; $14,000,000 maximumThe minimum is the only amount Fermilab must order. Estimates are not a commitment.RFP_Excavation_Services_IDIQ 385439GMK.pdf, page 6
Contract typeIDIQ subcontract; firm fixed price task orders, with some time and materialsTime and materials task orders are used only when scope cannot be defined in advance.RFP_Excavation_Services_IDIQ 385439GMK.pdf, page 4
Site visitNot held for this RFPA site walk may be scheduled for a specific task order.RFP_Excavation_Services_IDIQ 385439GMK.pdf, page 4

How to respond

  1. Acknowledge Amendment 01 by signing and returning it, or by email to ginakern@fnal.gov, before the deadline.
  2. Build Part I, the technical proposal, with no price. Include resumes for the Project Manager, Construction Superintendent, Project Safety Manager, and the Competent Person for Excavation.
  3. Build Part II, the business and price proposal: signed Exhibit A with apprentice rate build-up, the surety letter, Exhibits J and K, the Exhibit I safety questionnaire with OSHA 300A and NCCI forms, a safety narrative, a sample certificate of insurance, a corporate quality plan or the Appendix C form, and collective bargaining agreements.
  4. Include the signed CESHC from section 013100 with your proposal.
  5. Email Part I and Part II as separate files to ginakern@fnal.gov by 3:00 PM Central Time on Monday, December 7, 2026. Do not bind the two parts together.

Attached files

From SAM.gov. Download links open the original files.

21 more files from a ZIP archive, 10 read
  • Exhibits/Exhibit B - 010010_General_Requirements_3_2025 FFDG (1).pdfGeneral project rules for site access, closure days, and submittals. Read it; no form to fill in. Read.
  • Exhibits/Exhibit B - 013100_ESH_Requirements_04-2025 FFDG Hotwork.pdfSafety rules. Only pages 1-11 and 60-72 were provided, so you must read the rest yourself. Attachment C, the CESHC, must be completed and submitted with your proposal. Read in part (pages 1–11 and 60–72 of 72).
  • Exhibits/Exhibit B - 014100 Quality Requirements - (1 QC Plan Not Required).pdfQuality rules. Your corporate quality assurance plan, or the Appendix C form, must be submitted with the proposal. Read.
  • Exhibits/Exhibit C - Excavation_Services_SOW Sep 2026.pdfThe statement of work listing the excavation tasks, response times, and key personnel. Read it and price to it. Read.
  • Exhibits/Exhibit D - FFDG General Terms and Conditions for Construction (10.2026).pdf Not read: over our length limit.
  • Exhibits/Exhibit E - 2025 Construction Insurance Requirements.pdfInsurance minimums, including excess liability of $5,000,000 for subcontracts over $3.5 million. Read it and confirm your coverage. Read.
  • Exhibits/Exhibit F - Payment Bond.pdf Not read: over our length limit.
  • Exhibits/Exhibit G - Performance Bond.pdf Not read: over our length limit.
  • Exhibits/Exhibit H - Statement of Acknowledgment (SF-1413).pdfLists the labor-standard clauses that would apply to the subcontract. Read it; the text does not say when it is signed. Read.
  • Exhibits/Exhibit I -7010-F1-1 - Fermilab Subcontractor Injury & Illiness Data Questionnair Rev. 7-2018.pdfSafety questionnaire with three years of injury data and experience modification rates. You must complete and sign it and attach the OSHA 300A and NCCI forms. Read.
  • Exhibits/Exhibit J - PROC-FRM-100 Subcontractor Annual Representations & Certifications (SARC) v1.0.pdf Not read: over our length limit.
  • Exhibits/Exhibit K - Proposal Certifications.pdf Not read: over our length limit.
  • Exhibits/Exhibit L - Wage Determination IL20260008.pdf Scanned image, not read.
  • Exhibits/Exhibit L - Wage Determination IL20260011.pdf Scanned image, not read.
  • Exhibits/Exhibit L - Wage Determination IL20260020.pdf Scanned image, not read.
  • Exhibits/Exhibit M Sample Subcontract.pdf Not read: over our length limit.
  • Exhibits/Exhibit N - CESHC.pdf Not read: over our length limit.
  • Exhibits/Exhibit O - Site Map Fermilab.pdfGeneral site map showing roads, buildings, and ponds. Read only. Read.
  • Exhibits/Exhibit P Summary of Required RFP Submittal Documents.pdfChecklist of proposal documents. Read it; its deadline conflicts with the RFP. Read.
  • Exhibits/Exhibit Q -FFDG General Terms and Conditions for Time and Materials or Labor Hour Subcontracts (Non-R&D) (10.2026).pdf Not read: over our length limit.
  • RFP_Excavation_Services_IDIQ 385439GMK.pdfThe main request for proposal. You must complete and sign the Exhibit A price form on pages 14-15 with labor and equipment rates. Read.

Download the archive from SAM.gov.

Not stated in what we read

  • Wage rates and classifications: the three Exhibit L Davis-Bacon wage determinations are scanned images that could not be read.
  • Exhibits D, F, G, J, K, M, N and Q were not provided. Exhibits S and T are cited in the RFP but are not on the attachment list.
  • Location and size of the single laydown area for equipment are not stated.
  • Actual task order volume by year. The $2,600,000 figure is a planning estimate only.
  • Current contractor or incumbent for this work is not stated.
  • Which contract dates govern, the Exhibit C dates or the RFP dates, is not stated.

Notice text

Amendment# 01 - 7.B Business Management & Price Proposal: Add: Surety Letter Requirement Please review Amendment# 01 document and incorporate the new instructions when submitting your proposal. All other terms and conditions remain the same. ****************************************************************************************************************** Fermi National Accelerator Laboratory (Fermilab) is soliciting proposals for an Indefinite Delivery Indefinite Quantity (IDIQ) type Master Subcontract for Utilities Excavation and Repair Services for Fermilab located in Batavia, IL. Fermi Forward Discovery Group (FFDG) seeks to find a qualified subcontractor to perform on-call, scheduled, and emergency excavation services and utility repairs, as described in Exhibit C, Statement of Work, and the requirements of each task order.

Work will be performed across the Fermilab site, which covers approximately 6,800 acres in Kane and DuPage Counties and includes approximately 375 buildings and structures. The site contains a wide variety of soil types and terrain, such as clay soils, fill, and saturated soils, in settings that include developed areas, open prairie, woodlands, wetlands, and areas adjacent to ponds and waterways. Offerors should consider these conditions in their technical approach, equipment selection, and pricing.

Fermilab operates 24 hours per day, 365 days per year, and the work must support uninterrupted laboratory operations. The Request for Proposal and all Exhibits are located at Sam.gov under Solicitation number 385439GMK. Questions Close on November 18, 2026 at 5:00 pm CST. All questions must be submitted in writing to ginakern@fnal.gov. The Request for Proposal (RFP) CLOSES on December 7, 2026 at 3:00 pm CST. Please email your proposals with all required documents to ginakern@fnal.gov.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 26, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Energy by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy