Rehabilitate Chalmette National Cemetery, Chalmette, LA
The National Park Service wants a small business contractor to rehabilitate Chalmette National Cemetery in Chalmette, Louisiana.
Official title: Y--JELA 325250 335621 - Rehabilitate Cemetery
- Deadline
- Dec 10, 5:00 PM ET
- 14 days left
- Who can bid
- Small businesses
- Size standard for NAICS 237990: $45 million in average annual receipts; exceptions apply · Who qualifies
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: National Park Service Contracting Activity
What they're buying
The work covers headstone realignment, brick walls, roads, stormwater drainage and landscape, with a 730-calendar-day performance period after notice to proceed.
Top catches
“Response deadline: 2026-12-10T17:00:00-05:00” SAM.gov record
The form says 1700 local time, and the SAM record gives a -05:00 offset. The sign-in sheet uses Central time, and Amendment 0002 does not clearly say the due date stayed the same. Confirm the due time with the contracting officer and send your emails well before the deadline. Likely, not stated outright.
“Proposals shall be submitted via email. Proposals submitted via any means other than email shall not be accepted.” Sol_140PP027R0004.pdf, page 62
Paper, hand, courier and portal submissions are not accepted. Send Volume I and Volume II as separate attachments, each under 38 MB, with no email over 100 MB, and use the required subject line.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 6 of 15 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Raise, realign, clean and replace headstones and block markers, and set Government-supplied headstones and markers
- Repair and rebuild the perimeter brick wall, historic brick curbs, iron entry gates and metal fences on new foundations
- Build a new storm drainage system with catch basins, backflow check valves, culvert repair and an open channel
- Repave Military Cemetery Road with exposed aggregate concrete and reinterpret four historic nodes
- Protect mature live oaks, lay turf and sod, and decompact soils, using ground protection matting
- Option 1 (CLIN 3): brick replacement where brick has lost 25-49% of its cross section
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Confirm the due time and zone. The form says 1700 local time, and the SAM record gives a -05:00 offset. The sign-in sheet uses Central time, and Amendment 0002 does not clearly say the due date stayed the same. Confirm the due time with the contracting officer and send your emails well before the deadline.
- Email is the only way to submit. Paper, hand, courier and portal submissions are not accepted. Send Volume I and Volume II as separate attachments, each under 38 MB, with no email over 100 MB, and use the required subject line.
- Two wage determinations listed. Amendment 0002 incorporates wage determination LA20260038, but the attachment list also includes LA20260005. This review did not include either file, so you must read both and ask which one applies before you price labor.“Attachment 7 - DOL Wage Determination” Sol_140PP027R0004_Amd_0002.pdf, page 2
- Revised drawings could not be read. The revised drawings file could not be read here, and most of the revised specifications (pages 19 to 475) were not provided. Get the drawings and full specifications from SAM.gov and review them before you price.“Incorporate revised drawings” Sol_140PP027R0004_Amd_0002.pdf, page 2
- Size standard cites a reserved clause. The solicitation says the NAICS code and size standard are in clause 52.204-8, but Section K lists that clause as reserved. Find the size standard for NAICS 237990 yourself and confirm you qualify before you bid.“52.204-8 [RESERVED]” Sol_140PP027R0004.pdf, page 6
- Liquidated damages of $1,120 a day. If the work runs late, you pay $1,120.00 for every calendar day until the work is completed or accepted. Build a realistic schedule and price the risk of delay into your offer.“in the amount of $1,120.00 for each calendar day of delay until the work is completed or accepted.” Sol_140PP027R0004.pdf, page 13
Key terms
| Who can bid | Small businesses only (total small business set-aside)Your firm must have current, active registration in SAM.gov to be eligible for award.SAM.gov record |
|---|---|
| Contract period | 730 calendar days from notice to proceedStart within 10 calendar days of award. For proposal purposes, the schedule must finish by April 1, 2029, assuming notice to proceed on April 1, 2027.Sol_140PP027R0004.pdf, page 64 |
| How they choose | Best value; non-price factors weigh more than priceThe Government may pay more for a higher-priced offer if its benefits justify the difference.Sol_140PP027R0004.pdf, page 66 |
| How to submit | Email only, to two addresses, by 17:00 on 12/10/2026Use the subject line format given in the solicitation.Sol_140PP027R0004.pdf, page 62 |
| Estimated value | More than $10,000,000 (magnitude of construction)This is a size band, not an exact estimate.Sol_140PP027R0004.pdf, page 1 |
| Contract type | Lump-sum line items, base plus optionsCLINs 1 and 2 are the base work. CLIN 3 is Option 1, brick replacement for 25-49% cross section loss.Sol_140PP027R0004.pdf, page 9 |
| Site visit | Held Tuesday, November 3, 2026 (sign-in sheet only)Section L on the site visit was not included, so you cannot tell whether a visit was required.Sol_140PP027R0004_Amd_0001.pdf, page 3 |
How to respond
- Confirm the due date and time with contracting officer Carlos Garcia before you plan your submission, since the form says local time and the record gives -05:00.
- Prepare Volume I (technical proposal) as one electronic copy with folders for Factors 1 to 6, and Volume II (business and price proposal) as one electronic copy, with no hard copies.
- Email Volume I and Volume II as separate attachments to carlos_garcia@ios.doi.gov and CS_DSC_Proposal_Submission@nps.gov.
- Use the subject line 140PP027R0004, JELA 325250 335621, email x of x, with the total number of emails, and keep each attachment under 38 MB and each email under 100 MB.
- Include the SF 1442 blocks 14 to 20C, amendment acknowledgments, the Section B price schedule with a schedule of values for each line, the bid guarantee, Section K certifications, the general references form, and the subcontracting worksheet. Verify that the proposal was received.
Attached files
From SAM.gov. Download links open the original files.
- B08_Attachment_3_-_DOL_Wage_Determination_LA20260005.pdf Not read: over our length limit.
- B08_Attachment_6_-_Proposal_Submission_Package.pdf Not read: over our length limit.
- B08_Attachment_1_-_Specifications.pdfEarlier project specifications, partly included (pages 1-18 and 528-537 of 537). Amendment 0002 incorporates the revised version, so confirm which one applies. You only read this file. Read in part (pages 1–18 and 528–537 of 537).
- Sol_140PP027R0004_Amd_0002.pdfAmendment 0002, which lists revised RFI answers, specifications, drawings, a wage determination and two attachments. You must acknowledge it in your offer. Read.
- Sol_140PP027R0004.pdfThe solicitation, partly included (pages 1-14 and 62-68 of 68). It sets out the bid form, submission rules and evaluation factors. You must complete the SF 1442 offer blocks and the bid schedule. Read in part (pages 1–14 and 62–68 of 68).
- Sol_140PP027R0004_Amd_0001.pdfAmendment 0001, which attaches the pre-proposal site visit sign-in sheet for a visit on November 3, 2026. You only read this file. Read.
- B08_Attachment_4_-_Supplemental_Reports.pdf Not read: over our length limit.
- JELA_325250_335621_-_RFI_Log_-_Amendment_002_0002.pdf Not read: over our length limit.
- B08_Attachment_2_-_Drawings_Rev_01_11_24_26_0002.pdf Could not be read.
- B08_Attachment_9_-_Supplemental_Reports_and_Information_0002.pdf Not read: over our length limit.
- B08_Attachment_5_-_Permit_Documentation.pdf Not read: over our length limit.
- B08_Attachment_8_-_Baseline_Schedule_Review_Checklist_Form_0002.pdfA checklist the government uses to review construction schedules. You must follow it when you prepare your schedule, and you do not fill it in. Read.
- B08_Attachment_2_-_Drawings.pdf Not read: over our length limit.
- B08_Attachment_7_-_DOL_Wage_Determination_LA20260038_0002.pdf Not read: over our length limit.
- B08_Attachment_1_-_Specifications_Rev_01_11_24_26_0002.pdfRevised project specifications, only partly included (pages 1-18 and 476-490 of 490). You must read the full set before you price, and you do not fill it in. Read in part (pages 1–18 and 476–490 of 490).
Not stated in what we read
- When questions are due and how to submit them, because Section L was not included.
- Whether the November 3, 2026 site visit was mandatory and whether late attendance is allowed.
- Which wage determination applies, LA20260005 or LA20260038, and the wage rates.
- Whether the offer due date changed under Amendment 0002, since both extension boxes are unmarked.
- The exact size standard for NAICS 237990 and how the small business limit on subcontracting applies.
- Whether performance and payment bonds or a bid guarantee are required, since the form's yes or no boxes are not marked.
Notice text
Amendment 0002 is issued revised specifications, drawings, and supplemental information.
As published on SAM.gov.
Contacts
- Garcia, Carlos, carlos_garcia@ios.doi.gov, 7209006595
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 10, 5:00 PM ET14 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 237990, other heavy and civil engineering construction, soonest deadline first.
- Department of the ArmyNew baseball stadium at USAF Academy, Colorado Springs, CO
- Department of the ArmyLock and dam rehabilitation, Chicago, Illinois
- Department of the ArmyDredge containment repairs, Savannah and Brunswick, GA
- Departmental OfficesWater recirculation pipeline and pump, Pixley refuge, CA
- Department of the ArmyMaintenance dredging task orders, South Atlantic region
- Department of Veterans AffairsPhase 1 cemetery construction, Albuquerque, NM
- Department of the ArmyCutterhead dredging, Mississippi River Southwest Pass, LA
- Department of the ArmyEast Boat Basin bulkhead replacement, Sandwich, MA
Free · at most one email a morning
Get new notices from Departmental Offices by email
Each morning we'll send the new solicitations and sources-sought notices from Departmental Offices, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy