1. Opportunities
  2. Department of the Interior
  3. Departmental Offices
  4. 140FF027R0008

Boiler replacement at Shiawassee refuge, Saginaw, MI

Replace the gas boiler, controls and piping in the maintenance shop at Shiawassee National Wildlife Refuge in Saginaw, MI, and remove the old wood-fired boiler.

Official title: Z--HVAC Replacement - MI

Deadline
Dec 2, 3:00 PM ET
7 days left
Who can bid
Small businesses
Size standard for NAICS 238220: $19 million in average annual receipts · Who qualifies
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: FWS Contracting Activity

What they're buying

The work runs from 12/07/2026 to 02/26/2027 under a firm-fixed-price, lump-sum contract open only to small businesses.

Top catches

Wage determination swapped to building rates
“Wage Rate MI20260021 within the Base” Sol_140FF027R0008_Amd_0004.pdf, page 2

The wage determination changed from residential MI20260021 to building MI20260097. Plumber rates rose from $30.45 plus $10.64 fringe to $46.00 plus $22.99 fringe, so reprice labor from the new sheet only.

Email-only submission conflicts with form
“E-Mail Questions and Proposal Submission:” Sol_140FF027R0008.pdf, page 4

The continuation page says to email your bid, but Item 8 and Block 13a still point to a sealed-offer address in Falls Church, VA and to sealed envelopes. Ask the contracting officer in writing which method counts now, and email your bid well before the deadline.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 10 of 10 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Remove the existing wood-fired boiler and dispose of the old boiler, piping and equipment.
  • Install one new 150,000 BTU L.P. gas cast iron boiler, 84-86% efficient, vented through the existing chimney with new vent pipe as needed.
  • Connect piping from the removed wood boiler to the gas boiler piping, and update boiler piping, trim, circulator, expansion tank, water feed and air elimination.
  • Remove the air compressor and pneumatic controls. Install electronic zone valves connected to standard low voltage thermostats in the service space.
  • Install a voltage monitor to protect boiler electronics from power outages or brownouts.
  • Deliver equipment, owner's manuals, warranty information and staff training. Test the system and give a summary of findings and recommendations.

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Wage determination swapped to building rates. The wage determination changed from residential MI20260021 to building MI20260097. Plumber rates rose from $30.45 plus $10.64 fringe to $46.00 plus $22.99 fringe, so reprice labor from the new sheet only.
  • Email-only submission conflicts with form. The continuation page says to email your bid, but Item 8 and Block 13a still point to a sealed-offer address in Falls Church, VA and to sealed envelopes. Ask the contracting officer in writing which method counts now, and email your bid well before the deadline.
  • Fixed end date conflicts with delivery date. The amended period ends 02/26/2027, but the form still shows delivery on 01/29/2027. The statement of work also says the period depends on equipment lead times, so ask which date controls and price the lead time risk.“Delivery: 01/29/2027” Sol_140FF027R0008.pdf, page 4
  • Old November 17 deadline still printed. The continuation page still says proposals are due November 17, 2026. Amendments 2 to 4 set December 2, 2026 but do not restate the time, so confirm 3:00 PM -05:00 with the contracting officer.“Proposals Due: November 17, 2026 before 3:00pm” Sol_140FF027R0008.pdf, page 4
  • Site visit is today. The site visit is today, November 18, at 12:00 PM ET at 6975 Mower Road. Attendance is not mandatory but highly encouraged, so decide now whether to attend or send written questions by November 25.“SITE VISIT: Site visit is scheduled November” Sol_140FF027R0008_Amd_0003.pdf, page 2
  • Bonds and insurance due soon after award. If construction costs exceed $150,000, you must email performance and payment bonds within 14 days of award. Proof of insurance is due within five days of award regardless of cost, so line up your surety and insurance agent now.“email, within 14 days of award, Performance (Standard Form 25) and Payment Bonds (Standard Form 25a) of 100 percent, with surety of sureties acceptable to the Government.” Sol_140FF027R0008.pdf, page 4

Key terms

Who can bidSmall businesses only (100% small business set-aside)You must be registered and active in SAM before an award decision. The notice does not state the size standard.Sol_140FF027R0008.pdf, page 3
Contract period12/07/2026 to 02/26/2027Set by Amendment 2. The original form showed 11/23/2026 to 01/29/2027.Sol_140FF027R0008_Amd_0002.pdf, page 2
How they chooseSchedule, past performance and price (non-price factors 51%)Past performance means three projects of same or similar work from the last five years. Award goes to a responsible source.Sol_140FF027R0008.pdf, page 3
How to submitEmail to christine_beauregard@ios.doi.govThe form's address block and sealed-envelope wording conflict with this. See catches.Sol_140FF027R0008.pdf, page 4
Questions dueWednesday, November 25, 2026, time not statedReplaces the November 12, 2026 date on the original form. Questions must be in writing.Sol_140FF027R0008_Amd_0004.pdf, page 2
Contract typeFirm-fixed-price, one lump-sum itemThe bid schedule prices the basic contract as one lump sum (L.S.). No options are listed.Sol_140FF027R0008.pdf, page 3
Site visitWednesday, November 18, 2026, 12:00 PM ET (today), 6975 Mower Road, Saginaw, MI 48601Attendance is not mandatory, but highly encouraged, according to Amendment 1.Sol_140FF027R0008_Amd_0003.pdf, page 2

How to respond

  1. Confirm your SAM registration is active. The notice says you must be registered before an award decision is needed.
  2. Fill in the Bid Schedule with one lump-sum price for Item 1, your company name, SAM UEI, signer name and signature, plus a point of contact phone and email.
  3. Complete the offer pages of the solicitation form, including the number of calendar days your offer stays open in Block 17 and the acknowledgment of Amendments 1 to 4 in Block 19, and sign.
  4. Email the signed forms to christine_beauregard@ios.doi.gov before 3:00 PM -05:00 on Wednesday, December 2, 2026.
  5. Send any written questions to the same email by Wednesday, November 25, 2026. If you win, email any required bonds within 14 days and the insurance certificate within 5 days, and register for IPP before invoicing.

Attached files

From SAM.gov. Download links open the original files.

  • Sol_140FF027R0008_Amd_0004.pdfAmendment 4 replaces the wage determination and repeats the question and bid dates. Read it and list it in Block 19 of your offer. Read.
  • Wage_Rates_revised_Amd4_0004.pdfThe replacement building wage determination MI20260097. Use it to price labor. Read it in full. Read.
  • BID_SCHED.pdfThe bid form for one lump-sum price, company details, SAM UEI and signature. Fill in and sign it. Read.
  • Sol_140FF027R0008.pdfThe base combined solicitation with the form and clauses. Read it, complete the offer pages, and sign and return them. Read.
  • A06_Shiawassee_Maintenance_Shop_Drawings.pdfBuilding drawings the government will provide. Much of the text in the copy we reviewed is garbled, so check the original drawings. Read.
  • Sol_140FF027R0008_Amd_0001.pdfAmendment 1 adds the site visit and sets the period of performance. Read only; later amendments change some of these terms. Read.
  • Wages.pdfThe original residential wage determination MI20260021, replaced by Amendment 4. Do not price from it. Read.
  • A04_SOW.pdfThe statement of work describing the boiler and controls work you must price and deliver. Read it. Read.
  • Sol_140FF027R0008_Amd_0002.pdfAmendment 2 moves the site visit to 6975 Mower Road and sets the 12/07/2026 to 02/26/2027 period. Read only. Read.
  • Sol_140FF027R0008_Amd_0003.pdfAmendment 3 moves the site visit to 12:00 PM ET on November 18, 2026. Read only. Read.

Not stated in what we read

  • Estimated value or budget for the contract. The notice does not state a dollar amount.
  • Size standard for NAICS 238220. The notice does not give the small business limit, so check your size before bidding.
  • Which end date controls: the period of performance ending 02/26/2027 or the delivery date of 01/29/2027.
  • How the 60-day schedule in the statement of work applies, given that it also says the period depends on equipment lead times.
  • Whether the statement of work footers dated April 17, 2026 and titled Big Stone Emergency Repair apply to this project.
  • The name of the contracting officer. The statement of work lists TBD, but the form names Christine Beauregard.

Notice text

Amendment four - Revise Wage Rates

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 18, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Departmental Offices by email

Each morning we'll send the new solicitations and sources-sought notices from Departmental Offices, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy