Shower renovation at San Juan weather office, PR
You would remove and replace the shower room at the National Weather Service office in Carolina, PR (San Juan Weather Forecast Office), including drains, electrical work and a seamless resin floor and wall system.
Official title: Z--SHOWER RENOVATION SAN JUAN, PR WFO
- Deadline
- Dec 2, 2:30 PM MT
- 7 days left
- Who can bid
- Not stated
- The notice names no set-aside
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: Dept of Commerce NOAA
What they're buying
The work must be finished within 90 days of notice to proceed.
Top catches
“Quotes are required to be received in the contracting office no later than 2:30 MT/MST on 12/02/2026.” Sol_1305M327Q0060_Amd_0001.pdf, page 2
The cutoff is 2:30 MT/MST, which is a different time zone from Puerto Rico. Plan to send your quote well before that time.
“THE GOVERNMENT DOES NOT ACCEPT RESPONSIBILITY FOR NON-RECEIPT OF QUOTES.” Sol_1305M327Q0060_Amd_0001.pdf, page 2
Quotes go only by email to casey.keating@noaa.gov. The government does not accept responsibility for non-receipt, so you must request and keep written confirmation that your quote arrived.
Read by AI (Claude Haiku) on Nov 19, 2026 from the notice and 4 of 4 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Demolish the existing tile, fixtures, lighting, electrical, flooring and wood boards, then haul away all debris and recycle metals.
- Reconnect the shower drain to the building sanitary sewer with a trap, sloped at 1/4 inch per foot.
- Install a seamless, non-porous resin floor and wall system, 125 mil thick, with a slip-resistance DCOF of at least 0.42.
- Replace the light fixture and switch with UL/ETL-listed wet-location LED fixtures rated IP65 or higher, with GFCI protection if the fixture is in the shower zone.
- Upgrade shower room electrical to NEC 2023 and any stricter local code.
- Provide a 5-year warranty on the resin system and a 1-year workmanship warranty on other parts.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Deadline is in Mountain time. The cutoff is 2:30 MT/MST, which is a different time zone from Puerto Rico. Plan to send your quote well before that time.
- Email only, receipt not guaranteed. Quotes go only by email to casey.keating@noaa.gov. The government does not accept responsibility for non-receipt, so you must request and keep written confirmation that your quote arrived.
- Set-aside status conflicts. The SAM.gov record says set-aside is not stated, but the notice text says it is a small business set-aside. Bid only if you meet the $19.0M size standard for NAICS 238220.“This acquisition is set-aside for small business concerns.” Sol_1305M327Q0060_Amd_0001.pdf, page 1
- Bond or letter of credit likely needed. Unless your quote is under $35,000.00, you must provide a payment bond or irrevocable letter of credit within 10 days of award. The clause sets the amount at 100 percent of the contract price, so check your bonding capacity before you bid.“A PAYMENT BOND OR IRREVOCABLE LETTER OF CREDIT WILL BE REQUIRED UNLESS YOUR QUOTE IS UNDER $35,000.00.” Sol_1305M327Q0060_Amd_0001.pdf, page 2
- Two write-ups can sink your quote. Your quote needs a technical approach and an experience write-up, each no more than 2 to 3 pages. Missing either can lead to rejection, so write your own plan rather than restating the PWS.“VENDORS WHO DO NOT PROVIDE ALL EVALUATION CRITERIA PER 52.212-1 AND 52.212-2 WILL NOT BE ACCEPTED.” Sol_1305M327Q0060_Amd_0001.pdf, page 4
- Davis-Bacon wage rates apply. Workers must be paid the rates and fringe benefits in wage determination PR20260001, Modification 1, for building work in Carolina County. Price labor at those rates, not your usual rates.“The Davis Bacon Act GD PR20260001 applies for Carolina County, PR Construction Type: Building.” Sol_1305M327Q0060.pdf, page 6
Key terms
| Who can bid | Small businesses onlySAM.gov record shows set-aside as not stated. Size standard is $19.0M for NAICS 238220. You must be registered in SAM.Sol_1305M327Q0060_Amd_0001.pdf, page 1 |
|---|---|
| Contract period | 90 days from notice to proceedThe project is expected to start within 10 days of notice to proceed.Sol_1305M327Q0060_Amd_0001.pdf, page 1 |
| How they choose | Lowest price, technically acceptableTechnical approach and experience are pass or fail. Price decides among the acceptable quotes.Sol_1305M327Q0060_Amd_0001.pdf, page 1 |
| How to submit | Email to casey.keating@noaa.govSend PDF or Word files, with signed SF 18 and SF 30 forms.Sol_1305M327Q0060_Amd_0001.pdf, page 2 |
| Questions due | Monday, November 30, 2026, 12PM MSTSend questions in writing to Casey.Keating@noaa.gov. Only answers in a written amendment govern.Sol_1305M327Q0060.pdf, page 34 |
| Contract type | Firm fixed-price purchase order, single awardInvoices are billed in arrears through the Treasury Invoice Processing Platform (IPP). Payment terms are Net 30.Sol_1305M327Q0060_Amd_0001.pdf, page 1 |
| Site visit | Recommended, not requiredContact Wilfredo.Munoz@noaa.gov or 240-653-9542 to set a time.Sol_1305M327Q0060_Amd_0001.pdf, page 2 |
How to respond
- Send written questions to casey.keating@noaa.gov by 12PM MST on Monday, November 30, 2026.
- Email your quote as a PDF or Word file to casey.keating@noaa.gov by 2:30 MT/MST on Wednesday, 12/02/2026.
- Include the solicitation number 1305M327Q0060, your UEI and CAGE code, and signed SF 18 and SF 30 forms.
- Include a technical approach and an experience write-up, each 2 to 3 pages, plus a best and final price for all labor and materials.
- Ask for written confirmation that the government received your email.
Attached files
From SAM.gov. Download links open the original files.
- Attachement_2_Davis_Bacon_Act_GD_PR20260001.pdfThe Davis-Bacon wage determination listing minimum pay and fringe rates for Puerto Rico building work. You must price labor against it and do not sign it. Read.
- Sol_1305M327Q0060_Amd_0001.pdfAmendment 0001 to the solicitation. It changes the notice, so read it first. You must sign and return the SF 30 and your quote on SF 18 or your own form. Read.
- Sol_1305M327Q0060.pdfThe full solicitation with the Performance Work Statement, contract clauses, and instructions to offerors. You must read it and respond to its quote requirements, including the write-ups. Read.
- Attachment_1_Diagrams_Site_Photos.docxDiagrams and site photos of the shower room, drain routes and utility plan. Only titles could be read, so the drawings were not reviewed. You must read the original file on SAM.gov. Read.
Not stated in what we read
- Estimated contract value, which the notice does not give.
- Who the Contracting Officer's Representative is, since the PWS lists the government contact as TBD and the COR will be named after award.
- Which licenses and permits you need; the PWS says you must obtain them but does not list them.
- What the site diagrams and photos show, since the drawings could not be reviewed here.
- Whether the building stays open during the work and how contractor access will be arranged.
- Dates and times for the site visit, which you must set up with the contact.
Notice text
AMEND 0001 ADDED COVER PAGE The Contractor shall provide all personnel, materials, labor, equipment and supervision to complete the shower renovation as per the Performance Work Statement (PWS) at the San Juan, PR Weather Forecast Office (WFO).
As published on SAM.gov.
Contacts
- KEATING, CASEY, CASEY.KEATING@NOAA.GOV, 303-578-2579
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 19, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 2, 2:30 PM MT7 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 238220, plumbing, heating, and air-conditioning contractors, soonest deadline first.
- Department of Veterans AffairsChiller System Maintenance
- Department of Veterans AffairsControls Preventive Maintenance
- Department of the ArmyReplace two air handling units at Watervliet Arsenal, NY
- Bureau of Engraving and PrintingReplace air pollution oxidizer at Fort Worth, TX
- Departmental OfficesFire sprinklers and alarms at Honaunau park dorm, HI
- Departmental OfficesHeating leak repair at refuge visitor center, Homer, AK
- Department of Veterans AffairsBrine tank maintenance and salt delivery, Loma Linda, CA
- Department of Veterans AffairsAnnual Chiller Maintenance & Remote 24/7 Monitoring
Free · at most one email a morning
Get new notices from National Oceanic and Atmospheric Administration by email
Each morning we'll send the new solicitations and sources-sought notices from National Oceanic and Atmospheric Administration, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy