1. Opportunities
  2. Department of Veterans Affairs
  3. 36C24426R0088

Replace two electrical substations at Philadelphia VA, PA

The VA wants two electrical substations at the Corporal Michael J. Crescenz VA Medical Center replaced with new 480/277V units, each with a 1500 kVA transformer, plus a temporary substation to keep power on during the work.

Official title: Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC

Deadline
Dec 7, 4:00 PM ET
12 days left
Who can bid
SDVOSB firms
Service-disabled veteran-owned small businesses certified by SBA only · Who qualifies
Last time
$191K
Likely Aeonrg LLC
Place
PA
Buyer: 244-Network Contract Office 4 (36C244)

What they're buying

The contract runs 1000 calendar days from notice to proceed and is open only to service-disabled veteran-owned small businesses.

Top catches

Deadline moved to December 7
“1.Extend the proposal due date from 11/20/2026 at 4:00PM EST to 12/7/2026 at 4:00PM EST.” 36C24426R0088 0004.pdf, page 1

The notice text still shows November 20, which has passed. Amendment 0004 sets the due date to Monday, December 7, 2026 at 4:00 pm EST, so plan around the amended date and check SAM.gov before you send.

Signed 852.219-75 form required
“Failure to return a signed copy of 852.219-75 will result in proposal not being considered for award.” 36C24426R0088 0003.pdf, page 2

Without a signed copy of clause 852.219-75, the VA will not consider your proposal for award. Sign it and include it with your email, after reading its limits on subcontracting.

4 more catches below ↓

Read by AI (Claude Haiku) on Nov 21, 2026 from the notice and 13 of 42 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Replace Electrical Substations 1 and 2 with new 480/277V substations, each with a 1500 kVA transformer.
  • Install a temporary 480/277V substation with a 1500 kVA transformer during demolition and construction, then leave it in place as a spare.
  • Demolish and remove the existing substation equipment, and deliver the existing breakers from Substations 1 and 2 to the VA COR or Electrical Supervisor.
  • Build a new electrical room, and complete an arc flash hazard analysis, load monitoring, and site assessment.
  • Install and maintain ICRA and safety barriers, a permanent manometer with real-time display and data storage, and fire and smoke barrier penetration permits.
  • Submit a baseline CPM schedule, weekly and biweekly schedule updates, certified payrolls, material lists, safety data sheets, and weekly waste reports.

Who did it before

$191K

on the contract that likely holds this work now: Aeonrg LLC. It ended Nov 24, 2026.

Matched in USAspending.gov by agency, NAICS and service code; notices rarely name the contractor.

What to watch for

  • Deadline moved to December 7. The notice text still shows November 20, which has passed. Amendment 0004 sets the due date to Monday, December 7, 2026 at 4:00 pm EST, so plan around the amended date and check SAM.gov before you send.
  • Signed 852.219-75 form required. Without a signed copy of clause 852.219-75, the VA will not consider your proposal for award. Sign it and include it with your email, after reading its limits on subcontracting.
  • Email-only delivery, no backup. Your proposal must reach kevin.rodgers2@va.gov by the deadline. The Government is not responsible for proposals lost to file size or system errors, so send early and keep a copy of what you sent.“The Government is not responsible for proposals that are transmitted to the Contracting Officer and not received due to size of the documents or system errors.” 36C24426R0088 0003.pdf, page 2
  • Certified payroll timing conflicts. The statement of work gives two different payroll deadlines. Work cannot resume until payroll is submitted, so ask the COR which deadline applies before you schedule crews.“Submittal of all Certified payrolls must occur at the end of each work week.” Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx
  • Contract length changed to 1000 days. The original solicitation showed 365 days. Amendment 0003 changed the term to 1000 calendar days, so price labor, equipment, and overhead over the longer period.“For the entire project is 1000 days from NTP issuance.” Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx
  • Outages only in night and weekend hours. Power shutdowns must run 8:00 p.m. to 6:00 a.m. on Sunday through Friday nights or on weekends, and both power sources cannot be off for one building. Price after-hours crews and allow the 7-day and 15-day notice periods for utility interruptions.“For this project, off-hours are defined as 8:00 p.m. through 6:00 a.m. Sunday night through Friday night or weekends.” Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx

Key terms

Who can bidService-disabled veteran-owned small businesses onlyCheck the size standard for NAICS 236220 in FAR 52.204-8, which was not provided.SAM.gov record
Contract period1000 calendar days from notice to proceedAmendment 0003 changed this from 365 calendar days. The original solicitation still shows 365.36C24426R0088 0003.pdf, page 1
How they chooseBest value trade-offEvaluation factors are referenced but were not in the text we received.36C24426R0088_1.docx
How to submitEmail to Kevin Rodgers, kevin.rodgers2@va.govEmail only. The Government is not responsible for proposals not received because of file size or system errors.36C24426R0088 0003.pdf, page 2
Questions dueClosed. No more RFIs accepted after Amendment 0004.Contractor RFIs were due 7/29/2026 at 4:00pm EST.36C24426R0088 0004.pdf, page 1
Estimated value$5,000,000 to $10,000,000The notice gives a range for the project size, not a fixed contract amount.36C24426R0088_1.docx
Contract typeConstruction project (SF 1442 solicitation)The contract type clause (52.216-1) is listed in the table of contents, but its text was not provided.SAM.gov record
Site visitHeld 7/22/2026. Later visits need an appointment.Visits are by appointment with the Medical Center's Engineering Officer (COR). Arrange one before you price the job.Substations Upgrade Building 2-Phase 1_Bid Documents_Specification_10-21-24.pdf, page 7

How to respond

  1. Read Amendment 0004 and sign its SF 30 form, which says the contractor is required to sign and return it.
  2. Complete the offer side of SF 1442, including price and amendment acknowledgments, and sign it. Page limits and required price format: Not stated.
  3. Attach a signed copy of clause 852.219-75 to your email.
  4. Email the complete proposal to Kevin Rodgers at kevin.rodgers2@va.gov before Monday, December 7, 2026 at 4:00 pm EST, and send early.
  5. Keep your offer valid for at least 180 calendar days after the due date. Offers with less are rejected.

Attached files

From SAM.gov. Download links open the original files.

Not stated in what we read

  • We could not review Attachment 3, General Decision PA20260003, which sets wage rates. You must read it before you price labor.
  • Evaluation factors and their weights. The solicitation refers to them, but the text was not provided.
  • Bid guarantee and bond amounts. The form may require performance and payment bonds within 30 days after award, but the check mark is hard to read.
  • Insurance minimums. Proof of liability insurance is due within 10 days after award, but no amounts are stated.
  • Background check, badge timing, and cost. The notice says checks may be required before work starts.
  • Full drawings and specifications. Many pages were not provided, so read the complete set on SAM.gov.

Notice text

642-22-104, 36C24426R0088, Upgrade Substation Building 2, Phase 1, PHL CMCVAMC Proposal Due Date: 11/20/2026 at 4:00pm EST. Email proposals to Kevin Rodgers at kevin.rodgers2@va.gov. Corporal Michael J. Crescenz Medical Center (CMC VAMC) requires replacement of Electrical Substations 1 and 2 in order to increase electrical capacity to support future facility projects. The existing substations are approximately 29 years old and require replacement to support current and future electrical demands.

This project will replace Electrical Substations 1 and 2 with new 480/277V substations each containing a 1500 kVA transformer. A temporary 480/277V substation with a 1500 kVA transformer shall be installed to maintain electrical service to the facility during demolition and construction activities. Upon completion of construction, the temporary substation shall remain installed as a spare substation for the facility. All work shall be phased to minimize service outages and maintain continuous operation of the medical center.

Defined and issued bid documents (drawings and specifications) will serve as the basis of this construction project.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

Who may hold this work now

Contracts at Department of Veterans Affairs for the same kind of work (NAICS 236220, service code Z1DA) in Pennsylvania that end within a year either way of today. Notices rarely name the current contractor: these are likely candidates, not a fact.

ContractObligatedEndsState
Repair and Replace Ug Sanitary | PHL Cmcvamc |Aeonrg LLC · 36C24426N0405$190,695Nov 24, 2026endedPA
Move Audiology and Pharmacy Construction Project 503-18-104Senate Builders & Construction Managers, Inc. · 36C24422N0050$5,524,250Nov 30, 2026within a monthPA
Bldg One Roof.Serviam Construction LLC · 36C24426N0125$2,197,570Nov 30, 2026within a monthPA
Correct HVAC SPS - LebanonSenate Builders & Construction Managers, Inc. · 36C24425N0488$2,019,538Nov 18, 2026endedPA
Eo 14398Serviam Construction LLC · 36C24426N0988$370,450Nov 11, 2026endedPA

Source: USAspending.gov, prime contracts of $100,000 or more. Department of Defense contracts appear there about 90 days after award.

History

  • Nov 21, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of Veterans Affairs by email

Each morning we'll send the new solicitations and sources-sought notices from Department of Veterans Affairs, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy