Base repair and minor construction, Wright-Patterson AFB, OH
The Air Force wants 8(a) small business concerns to handle over 100 simultaneous maintenance, repair and minor construction projects on real property at Wright-Patterson AFB, Ohio, under the SABER FY27-32 requirement.
Official title: SABER FY 27-32
- Deadline
- Tomorrow, 2:00 PM ET
- Wednesday, Nov 25
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Not stated
- Buyer: FA8601 AFLCMC Pzio
What they're buying
Responses are due Wednesday, 2026-11-25 at 14:00 (-05:00), and the notice does not say how long the work lasts beyond the FY27-32 title.
Top catches
“This acquisition is a 100% 8(a) SMALL BUSINESS SET-ASIDE.” Notice text
Only firms that qualify as 8(a) small business concerns may propose. If your firm is not an 8(a) concern, you cannot bid on this notice.
“2026-11-25T14:00:00-05:00” SAM.gov record
The deadline is Wednesday, 2026-11-25 at 14:00 (-05:00), and the next day is Thanksgiving. You have about six days from posting, so plan to send early and confirm the time zone. Likely, not stated outright.
Read by AI (Claude Haiku) on Nov 20, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Provide management, labor, material, equipment, transportation, supervision and design for over 100 simultaneous projects, unless the Government furnishes an item.
- Perform maintenance, repair and minor construction work on real property.
- Work across Area A, Area B and all other Wright-Patterson AFB property.
- Work to the SABER FY27-32 Statement of Work, which is not included in this notice.
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Only 8(a) firms may bid. Only firms that qualify as 8(a) small business concerns may propose. If your firm is not an 8(a) concern, you cannot bid on this notice.
- Short window over a holiday. The deadline is Wednesday, 2026-11-25 at 14:00 (-05:00), and the next day is Thanksgiving. You have about six days from posting, so plan to send early and confirm the time zone.
- Statement of Work not attached. The notice says the work follows the SABER FY27-32 Statement of Work, but no files are attached. Ask the contracting office for it or check SAM.gov before you price the work.“per the SABER FY27-32 Statement of Work” Notice text
- Over 100 projects at once. The work covers over one hundred simultaneous projects. Check that you have the crews, equipment and management to run that many jobs at the same time before you bid.“over one hundred (100+) simultaneous projects” Notice text
- Referenced clauses not provided. The amendment says it incorporates two RFO clauses, but their text is not in this notice. Read both clauses on SAM.gov before you decide to bid, since they may add requirements.“Amendment incorporates RFO 52.211-14 and RFO 52.211-15.” Notice text
- Place of performance missing in record. The SAM.gov place of performance field is blank, but the notice text names Wright-Patterson AFB, Ohio. Use the notice text location and check the record again if you filter searches by location.“Place of performance: Not stated” SAM.gov record
Key terms
| Who can bid | 8(a) small business concerns onlyThe notice is a 100% 8(a) set-aside.Notice text |
|---|---|
| Contract period | FY27-32 (as titled)The title says FY27-32. The notice does not give exact start and end dates.Notice text |
How to respond
- Confirm that your firm is an 8(a) small business concern, since the notice limits this acquisition to those firms.
- Check SAM.gov for the submission address, portal or format, because the notice text does not state how to send a proposal.
- Send your proposal before Wednesday, 2026-11-25 at 14:00 (-05:00), and send it early because the next day is Thanksgiving.
- Contact the contracting office for the SABER FY27-32 Statement of Work and the two RFO clauses, since they are not included in this notice.
Not stated in what we read
- Estimated value or contract ceiling
- Contract type and award basis
- How to submit a proposal and what it must include
- Text of the SABER FY27-32 Statement of Work
- Text of the RFO 52.211-14 and 52.211-15 clauses
- Whether a site visit or pre-proposal meeting is held and the deadline for questions
Notice text
**Amendment incorporates RFO 52.211-14 and RFO 52.211-15.** The United States Air Force, AFLCMC/Operational Contracting Branch, Wright-Patterson AFB, Ohio is seeking industry proposals from 8(a) small business concerns for the Simplified Acquisition of Base Engineering Requirements (SABER) FY27-32 requirement. The Contractor shall provide all management, labor, material, equipment, (unless furnished by the Government), transportation, supervision, and design capabilities to accomplish over one hundred (100+) simultaneous projects for a broad range of maintenance, repair and minor construction work on real property at Wright Patterson AFB, OH per the SABER FY27-32 Statement of Work. Performance will take place on Area A, Area B, and all other properties owned by Wright-Patterson Air Force Base, Ohio. This acquisition is a 100% 8(a) SMALL BUSINESS SET-ASIDE.
As published on SAM.gov.
Contacts
- Amanda Sergent, amanda.sergent.2@us.af.mil
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 20, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Tomorrow, 2:00 PM ETWednesday, Nov 25
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 236220, commercial and institutional building construction, soonest deadline first.
- Department of Veterans AffairsHistoric lodge renovation at Fort McPherson, Maxwell, NE
- Department of Veterans AffairsRemodel ENT procedure rooms, Jesse Brown VA, Chicago, IL
- Department of Veterans AffairsFlooring and X-ray electrical work at Bath VA, NY
- Department of the ArmyNotice to Industry - LVN B95 Fire Station Addition
- Department of the ArmyNotice to Industry - LVN B95 Fire Station Addition
- Office of the Assistant Secretary for Administration and ManagementRoof, HVAC and seismic upgrades at Clearfield Job Corps, UT
- Department of the NavySteam plant design-build at NSA Bethesda, MD
- Department of Veterans AffairsReplace flooring and paint in Building 650, Mather, CA
Free · at most one email a morning
Get new notices from Department of the Air Force by email
Each morning we'll send the new solicitations and sources-sought notices from Department of the Air Force, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy