Cost estimates for nine buildings at Brookhaven, Upton, NY
Brookhaven Science Associates, which runs Brookhaven National Laboratory for the Department of Energy, wants an independent, fixed-price construction cost estimate for nine buildings in Work Package 02, with a 10-week performance period after notice to proceed.
Official title: A-E Cost Estimation Services
- Deadline
- Dec 4, 5:00 PM ET
- 8 days left
- Last time
- None found
- No contract like it at this agency in USAspending.gov
- Place
- Upton, NY
- Buyer: Brookhaven Natl Lab -DOE Contractor
What they're buying
Email your quote to Enagel@bnl.gov by 5 PM EST on Friday, 4 Dec 2026.
Top catches
“The prime contractor must have the experience.” Solicitation_Questions 481463.xlsx
Your own firm must have prepared three construction cost estimates for projects over $75 million, and must have an estimator with ten years of large-project experience. BSA said subcontractor experience does not count and refused to lower the threshold, so do not bid unless your firm meets both.
“Email submissions must include the signed Quotation Pricing Sheet (Enclosure 2).” B1. RFQ 481463.pdf, page 3
BSA accepts quotes only by email, with the signed Quotation Pricing Sheet attached and RFQ 481463 in the subject line. A quote received after 5 PM EST on 4 Dec 2026 may not be considered, so send it early and keep proof of sending.
Read by AI (Claude Haiku) on Nov 26, 2026 from the notice and 8 of 8 attached files. Every quote on this page was found word for word in the source. Check the official notice before you bid.
The work
- Independent construction cost estimate for each of the nine buildings, prepared as an AACE Class 1 estimate (Q&A 26 and 50).
- Verify all quantities from the 100% design drawings and specifications, which BSA provides after award (Q&A 63).
- Estimate construction costs only. Do not include A/E fees, program management or owner reserve (Q&A 42).
- Reconciliation meetings with the A/E and BSA, with estimate updates. The number of iterations is unknown (Q&A 17 and 60).
- One site walkdown at BNL after award. Travel and your own PPE belong in the lump price (Q&A 13 and 58).
- Estimates delivered as PDF and Excel, with the basis visible for reconciliation. Four milestones in the draft contract (Q&A 52).
Who did it before
No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.
What to watch for
- Prime firm must show experience. Your own firm must have prepared three construction cost estimates for projects over $75 million, and must have an estimator with ten years of large-project experience. BSA said subcontractor experience does not count and refused to lower the threshold, so do not bid unless your firm meets both.
- Email only, signed pricing sheet. BSA accepts quotes only by email, with the signed Quotation Pricing Sheet attached and RFQ 481463 in the subject line. A quote received after 5 PM EST on 4 Dec 2026 may not be considered, so send it early and keep proof of sending.
- Question window has closed. Questions were due 20 Nov 2026, and that date has passed. The posted answers are your only guidance, so state any remaining assumptions and their cost effect in your quote.“Questions Due Date: 20 Nov 2026” B1. RFQ 481463.pdf, page 1
- Terms may disqualify exceptions. Taking exception to BSA's terms can make your quote non-responsive. The General Terms and Conditions, Rev. 25 (September 2026), are not in this packet, so read them before you price and decide whether you can accept them.“An offeror that takes exception to BSA Terms & Conditions or fails to provide all requirements of this RFQ may be deemed non-responsive and may not be considered for award.” B1. RFQ 481463.pdf, page 2
- Design files come after award. The 100% design drawings and specifications are not in this packet, but your fixed price is due now. Price from BSA's approximate counts (about 315 drawing sheets, 185 specifications, 81,000 square feet, $120M construction value) and state those assumptions with their cost effect.“will be provided after contract award in accordance with Statement of Work EIC-IFD-SOW-008 Section 5.” Solicitation_Questions 481463.xlsx
- 10-week schedule may not fit. Milestone 1 starts when BSA delivers its documents, which is expected later than notice to proceed, and the gap before Milestone 4 is not set. Check whether 10 weeks works for you, and state how you would handle a delay.“The gap between Milestone No. 03 and Milestone No. 04 has yet to be established in the BSA schedule.” Solicitation_Questions 481463.xlsx
Key terms
| Who can bid | Full and open competition; no set-asideNAICS 541330 with a stated size standard of $25.5M. Q&A 19 says the NAICS code is a targeting tool, not a requirement.B1. RFQ 481463.pdf, page 1 |
|---|---|
| Contract period | 10 weeks from notice to proceed (NTP)Q&A 6 and 15 say NTP is expected in 1QFY27 and BSA's Milestone 1 documents in 2QFY27.B1. RFQ 481463.pdf, page 1 |
| How they choose | Lowest total price among responsive offerors who meet all qualifiersYou must meet the section 2.1 past performance and key personnel qualifiers, and the technical requirements.B1. RFQ 481463.pdf, page 2 |
| How to submit | Email to Enagel@bnl.gov with RFQ number in the subject lineEmail is the only accepted method. The signed Quotation Pricing Sheet must be attached.B1. RFQ 481463.pdf, page 1 |
| Questions due | 20 Nov 2026 (passed)Questions were due by email. Answers were posted as Amendment 1.B1. RFQ 481463.pdf, page 1 |
| Contract type | Firm-fixed pricePayment is Net 30, or Net 10 for small businesses. The quoted price must stay firm for 90 days.B1. RFQ 481463.pdf, page 1 |
| Site visit | One site walkdown at BNL, after awardYou choose the attendees. BSA gives safety briefings. All site workers need badges and hosts (Q&A 44).Solicitation_Questions 481463.xlsx |
How to respond
- Send your quote by email to Enagel@bnl.gov before 5 PM EST on Friday, 4 Dec 2026.
- Put RFQ 481463 in the subject line of the email.
- Attach the Quotation Pricing Sheet (Enclosure 2), signed, with your quote number, date and total price.
- Confirm on the pricing sheet that your SAM.gov registration, size status and reps and certs are current, and include your UEI.
- File format and any page limit for the quote: Not stated.
Attached files
From SAM.gov. Download links open the original files.
- B1. RFQ 481463.pdfThe request for quote letter with the deadline, submission rules and award basis; read it in full, and it does not need to be signed. Read.
- Attachment (B) BNL-QA-101.pdfBSA's supplier quality requirements that the draft contract incorporates; read it, and nothing needs to be filled in. Read.
- Enclosure (3) Vendor ACH Authorization Form.pdfA bank form for electronic payment that the successful contractor completes after award; you do not need it to bid. Read.
- Enclosure (2) Quotation Pricing Sheet.docxThe price form you must complete, sign and email with your quote. Read.
- Enclosure (4) W-9 Form.pdfA tax form that the successful contractor completes and signs after award; you do not need it to bid. Read.
- Attachment (A) Statement of Work Cost Estimating Services.pdfThe statement of work that sets the estimate scope and milestones; read it, since parts of the extracted text are garbled. Read.
- Enclosure (1) Draft Contract 481463.docxThe draft contract that will govern the work; read it, and sign only if you are awarded. Read.
- Solicitation_Questions 481463.xlsxThe list of questions and BSA answers, which change or clarify the RFQ; read all of it before you price. Read.
Not stated in what we read
- Contract value or price ceiling: Not stated. The draft contract shows TBD and $0.00.
- Text of BSA General Terms and Conditions for Non-Commercial Services, Rev. 25, September 2026. They are linked from the draft contract and are not in this packet.
- Final contract end date. The draft contract leaves the period of performance blank.
- Number of reconciliation meetings and estimate iterations. BSA says this is unknown.
- Exact dates for notice to proceed and for BSA's Milestone 1 documents. The notice gives only 1QFY27 and 2QFY27.
- Whether the reconciliation meeting and Milestone 4 fall inside the 10-week period. Q&A 27 asked for confirmation and the answer does not give it.
Notice text
This is an official Request for Quote (RFQ) for A-E Cost Estimator Services at Brookhaven National Labs. Refer to the RFQ Letter and attachments for details and quote submission requirements. Amendment 1 is hereby posted to include the answers to submitted questions in response to this RFQ. See attachments for the Solicitation Questions excel document.
As published on SAM.gov.
Contacts
- Eric Nagel, enagel@bnl.gov
As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.
History
- Nov 26, 2026: first seen in the SAM.gov extract
SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.
Should you bid?
Dec 4, 5:00 PM ET8 days left
A free report for your company: whether you can bid, what to confirm first and who may hold the work now.
Get the free reportSimilar open notices
Open now under NAICS 541330, engineering services, soonest deadline first.
- Department of the NavyEnvironmental planning for ship homeporting, Norfolk, VA
- Department of the ArmyIntent to Sole Source - Type-C A&E Services for Construction of SFS Facility
- Department of the NavyNetwork lab operation and sustainment for Canadian FMS
- National Aeronautics and Space AdministrationProgram Analysis and Control (PAAC V) Bridge
- National Aeronautics and Space AdministrationMass production process development at NASA Ames, CA
- Department of the NavyGun and weapon systems support at NSWC Dahlgren
- US Special Operations Command (USSOCOM)YT706 engine lifecycle support at Fort Campbell, KY
- Departmental OfficesConstruction oversight for nature center, Wichita, KS
Free · at most one email a morning
Get new notices from Department of Energy by email
Each morning we'll send the new solicitations and sources-sought notices from Department of Energy, with deadlines and set-asides up front. Free. Unsubscribe in one click.
The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy