Weapons generation complex and flightline at JBER, Alaska

The U.S. Army Corps of Engineers wants a design-builder for about sixteen new facilities at Joint Base Elmendorf-Richardson, Alaska, including hangars, operations buildings and munitions storage magazines for the Weapons Generation Complex and Northern Flightline.

Official title: ACC003 Weapons Generation Complex and Northern Flightline

Deadline
Nov 30, 2:00 PM AKT
6 days left
Who can bid
Not stated
The notice names no set-aside
Last time
None found
No contract like it at this agency in USAspending.gov
Place
Not stated
Buyer: W2SN Endist Alaska

What they're buying

The notice does not state a contract length, estimated value or set-aside.

Top catches

Short response window
“Response deadline: 2026-11-30T14:00:00-09:00” SAM.gov record

The notice was posted Monday, November 23 and is due Monday, November 30 at 14:00. That leaves about one week, and the notice does not say how to submit, so confirm the method on SAM.gov now.

Notice type and purpose conflict
“seeking to identify a Design-Build Team or Design-Builder” Notice text

The text asks to identify a design-build team, which reads like a qualification step, but the record lists a Solicitation with one deadline. Check on SAM.gov whether the deadline is for a qualifications submission or a full proposal. Likely, not stated outright.

3 more catches below ↓

Read by AI (Claude Haiku) on Nov 24, 2026 from the notice. Every quote on this page was found word for word in the source. Check the official notice before you bid.

The work

  • Design and construct approximately sixteen new facilities at JBER, Alaska
  • Build hangars, operations buildings and munitions storage magazines
  • Have the new Weapons Generation Complex operational before the existing facility is decommissioned
  • Keep zero operational downtime for the mission during the changeover
  • Build on pre-excavated sites with preconstructed utilities supplied under a separate, preceding agreement

Who did it before

No match in USAspending.gov: no contract at this agency for the same kind of work ends within a year either way.

What to watch for

  • Short response window. The notice was posted Monday, November 23 and is due Monday, November 30 at 14:00. That leaves about one week, and the notice does not say how to submit, so confirm the method on SAM.gov now.
  • Notice type and purpose conflict. The text asks to identify a design-build team, which reads like a qualification step, but the record lists a Solicitation with one deadline. Check on SAM.gov whether the deadline is for a qualifications submission or a full proposal.
  • Zero downtime changeover constraint. The new complex must be operational before the existing facility can be shut down, with zero operational downtime. Price the phasing and overlap carefully, because the notice gives no detail on how the changeover will be scheduled.“A key constraint is the requirement for the new WGC to be operational before the existing facility can be decommissioned, ensuring zero operational downtime for this mission.” Notice text
  • Utilities depend on a separate agreement. Your work starts on sites and utilities that a separate, earlier agreement delivers. A delay there could delay your schedule, so account for that risk when you price the work.“The project will be constructed on pre-excavated sites with preconstructed utilities delivered under a separate, preceding agreement.” Notice text
  • Set-aside status not stated. The record does not say whether the bid is limited to small businesses, so you cannot tell from this notice whether you are eligible. Check the set-aside and size standard in the full solicitation before you invest in the bid.“Set-aside: Not stated” SAM.gov record

Key terms

Contract typeDesign-buildThe Army wants a design-build team or design-builder.Notice text

How to respond

  1. Check SAM.gov for the full solicitation package and any amendments, since no files are attached to this notice.
  2. Send your response by Monday, November 30, 2026 at 14:00 (offset -09:00 as written), using the method stated in the full solicitation; the notice itself does not say where or how to submit.
  3. Format, page limits, required forms and signatures: Not stated. Confirm these before you assemble your response.

Not stated in what we read

  • Estimated value or budget: Not stated.
  • Contract period and performance schedule: Not stated.
  • Whether the work is set aside for small businesses, and the size standard: Not stated.
  • How and where to submit, and what the response must include: Not stated.
  • Whether this step is a qualification submission or a full proposal, and what follows it: Not stated.
  • Site visit, pre-bid meeting or question deadline: Not stated.

Notice text

The U.S. Army Corps of Engineers USACE, Alaska District, is seeking to identify a Design-Build Team or Design-Builder for ACC003 Weapons Generation Complex and Northern Flightline, a major project in support of the Fighter Town Recapitalization FTR Program at Joint Base Elmendorf-Richardson JBER, Alaska. The FTR Program is a multiphase initiative to redevelop a significant portion of JBER with modern, resilient, and expanded infrastructure while maintaining mission continuity for active base and airfield operations throughout all phases of construction and facility turnover.

Within this broader program, the ACC003 project will encompass construction of the new Weapons Generation Complex and associated Northern Flightline facilities at JBER, Alaska. The scope includes approximately sixteen new facilities, comprising hangars, operations buildings, and munitions storage magazines. A key constraint is the requirement for the new WGC to be operational before the existing facility can be decommissioned, ensuring zero operational downtime for this mission.

The project will be constructed on pre-excavated sites with preconstructed utilities delivered under a separate, preceding agreement.

As published on SAM.gov.

Contacts

As listed in the notice. Ask questions in writing and before the questions deadline, if the notice sets one.

History

  • Nov 24, 2026: first seen in the SAM.gov extract

SAM.gov shows only the latest version of a notice. FedLook keeps a copy of each day's notices and records what changed.

Free · at most one email a morning

Get new notices from Department of the Army by email

Each morning we'll send the new solicitations and sources-sought notices from Department of the Army, with deadlines and set-asides up front. Free. Unsubscribe in one click.

The morning edition by email: free, at most one email a morning, unsubscribe in one click. We use your address for nothing else and never share it. Privacy